Analysis of the efficiency of semi-precast lightweight composite floor slab installation technology
View through CrossRef
The article is devoted to the analysis of the BubbleDeck technology as an innovative solution for lightweight floor slabs in the construction of multi-story frame buildings, as well as the justification of its applicability in comparison with the monolithic Cobiax system. The use of void-formers allows reducing the dead weight of slabs by 20–40% and cutting concrete consumption by up to 40% without compromising load-bearing capacity. However, the economic feasibility of a particular system is determined not only by structural parameters but also by the presence of specialized precast concrete plants in the construction region. The European experience in the application of lightweight floor slabs is examined, specifically the Cobiax company as a leader in the monolithic segment, and the Danish company BubbleDeck as the pioneer in offering precast-monolithic bidirectional slabs with integrated void-formers.
The structural features of the BubbleDeck system are analyzed. The slab has a two-layer structure consisting of a 60 mm precast bottom layer with factory-installed spherical void-formers and a monolithic top layer made of high-strength lightweight concrete (LC40). The system is designed for spans of 7.2–8.4 m, with slab thicknesses ranging from 230 to 600 mm. As a representative of the monolithic segment, the Cobiax system with ellipsoid inserts for spans of 6.0–8.4 m is considered.
Differences between the systems in terms of formwork, reinforcement, and labor intensity of installation are analyzed. The factory readiness of BubbleDeck slabs eliminates the need for solid plywood formwork – linear supports are sufficient. Factory-controlled reinforcement and ball spacing minimize the risk of void-former buoyancy during concreting, which remains a relevant problem for monolithic options. The bottom surface of the slab turns out to be smooth, requiring no plastering. The installation of a single panel with an area of up to 20–30 m² is faster than the assembly and disassembly of formwork for monolithic options, allowing for a construction pace of one floor per week. At the same time, high factory readiness generates new costs associated with the transportation of large-sized elements, rigging, crane lifting, and precise positioning of panels at the site. The transport component per 1 m² increases in proportion to the distance, and at a distance of over 150 km, it becomes comparable to the savings achieved on formwork operations.
Kyiv National University of Construction and Architecture
Title: Analysis of the efficiency of semi-precast lightweight composite floor slab installation technology
Description:
The article is devoted to the analysis of the BubbleDeck technology as an innovative solution for lightweight floor slabs in the construction of multi-story frame buildings, as well as the justification of its applicability in comparison with the monolithic Cobiax system.
The use of void-formers allows reducing the dead weight of slabs by 20–40% and cutting concrete consumption by up to 40% without compromising load-bearing capacity.
However, the economic feasibility of a particular system is determined not only by structural parameters but also by the presence of specialized precast concrete plants in the construction region.
The European experience in the application of lightweight floor slabs is examined, specifically the Cobiax company as a leader in the monolithic segment, and the Danish company BubbleDeck as the pioneer in offering precast-monolithic bidirectional slabs with integrated void-formers.
The structural features of the BubbleDeck system are analyzed.
The slab has a two-layer structure consisting of a 60 mm precast bottom layer with factory-installed spherical void-formers and a monolithic top layer made of high-strength lightweight concrete (LC40).
The system is designed for spans of 7.
2–8.
4 m, with slab thicknesses ranging from 230 to 600 mm.
As a representative of the monolithic segment, the Cobiax system with ellipsoid inserts for spans of 6.
0–8.
4 m is considered.
Differences between the systems in terms of formwork, reinforcement, and labor intensity of installation are analyzed.
The factory readiness of BubbleDeck slabs eliminates the need for solid plywood formwork – linear supports are sufficient.
Factory-controlled reinforcement and ball spacing minimize the risk of void-former buoyancy during concreting, which remains a relevant problem for monolithic options.
The bottom surface of the slab turns out to be smooth, requiring no plastering.
The installation of a single panel with an area of up to 20–30 m² is faster than the assembly and disassembly of formwork for monolithic options, allowing for a construction pace of one floor per week.
At the same time, high factory readiness generates new costs associated with the transportation of large-sized elements, rigging, crane lifting, and precise positioning of panels at the site.
The transport component per 1 m² increases in proportion to the distance, and at a distance of over 150 km, it becomes comparable to the savings achieved on formwork operations.
Related Results
NONLINEAR STATIC ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS
NONLINEAR STATIC ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS USING ANALYSIS OF COMPOSITE SHELLS
This paper presents the results of the geometric nonlinear analysis of composite shell subjected to static load by using an edge-based smoothed finite elements (ES) and the mixed i...
Seismic Response Optimization of RC Slabs: Influence of Opening Location, Size, and Geometry on Structural Performance
Seismic Response Optimization of RC Slabs: Influence of Opening Location, Size, and Geometry on Structural Performance
In this research, the influence of the location, area and shape of the openings on the seismic behavior and performance of the concrete slab roof was evaluated and studied using th...
Efektivitas Metode Pekerjaan Pelat Lantai Bondek, Half Precast dan Konvensional Gedung Asrama Putra Al-Azhar
Efektivitas Metode Pekerjaan Pelat Lantai Bondek, Half Precast dan Konvensional Gedung Asrama Putra Al-Azhar
The floor plate is one of the important components in a multi-story building. Conventional methods are still widely used for building floor slabs. This method requires a lot of lab...
CONSTRUCTION METHOD OF ABILA PRECAST CONCRETE FOR HOUSING
CONSTRUCTION METHOD OF ABILA PRECAST CONCRETE FOR HOUSING
The purpose of this research is to arrange the stages of implementation of the ABILA precast concrete construction method to be applied to housing construction so that it can be us...
CONSTRUCTION METHOD OF ABILA PRECAST CONCRETE FOR HOUSING
CONSTRUCTION METHOD OF ABILA PRECAST CONCRETE FOR HOUSING
The purpose of this research is to arrange the stages of implementation of the ABILA precast concrete construction method to be applied to housing construction so that it can be us...
Investigation of shear‐flexural behavior of precast joints in prestressed reinforced concrete
Investigation of shear‐flexural behavior of precast joints in prestressed reinforced concrete
AbstractThe behavior of precast concrete structures at the limit states of ultimate bearing capacity depends on the shear and shear‐flexural behavior of the joints between precast ...
Detached Tonga slab in the mantle transition zone imaged by stress variations of deep-focus earthquakes
Detached Tonga slab in the mantle transition zone imaged by stress variations of deep-focus earthquakes
Tonga is a part of Tonga-Kermadec, the 2,550 km long subduction system in SW Pacific. It represents a convergent plate boundary and the outcome of the Pacific plate submerging unde...
A study of RFID application for improving the installation process of precast concrete panels in a housing project
A study of RFID application for improving the installation process of precast concrete panels in a housing project
Two types of information, namely; related jobsite information along the process and feedback information have been found as essential elements for construction process improvement....