Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Conductor Sharing Drilling Technique

View through CrossRef
Abstract With the objective to drill two wells shared from one conductor with independent wellhead and completion, ADNOC Offshore drilling team pioneered for the first time in Umm Lulu field and ADNOC UAE the Conductor sharing drilling technique. Which is to drill two wells from one single conductor in wellhead tower. Well planning technique drilling 42" hole and run 36" conductor, then install lower male connector and run conductor Down Hole Guide (DHG) assembly to be a guide for both two wells. Land the DHG on the lower male connector. Install upper male connector, which is equipped with two well slots for drilling the two wells. Drilling 1st 16" hole and run 13 3/8" casing and cemented. Skid over second slot and drill second hole 16" and run and cement 13 3/8" casing and carry out top up cement job for both hole up to surface inside 36" conductor. Install casing head housing for each well. Then each well could be drilled as per normal procedures. Well executing process. Well challenges: Drilling large hole 42" hole with 42" bit and BHA. Run 36" conductor and conductor sharing DHG and keep aligned for accessibility of BHA and casing Nudge 16" hole for both two wells at centre-to-centre distance 8" safely without collision issue. Run two 13 3/8" casing strings in 36" conductor and cement same up to surface. Complete drilling well UL-056 from slot A, drilled 12 ¼" hole section to TH-I ABS, run 9 5/8" casing and perform cement job to surface, drilled 6" hole (linerless design) and land in TH II then continued drilling horizontal drain to TD, Run completion and deliver the well. Suspend the other well in slot B at 13 3/8" casing with securing the well with abandonment cap and as per ADNOC offshore policy.
Title: Conductor Sharing Drilling Technique
Description:
Abstract With the objective to drill two wells shared from one conductor with independent wellhead and completion, ADNOC Offshore drilling team pioneered for the first time in Umm Lulu field and ADNOC UAE the Conductor sharing drilling technique.
Which is to drill two wells from one single conductor in wellhead tower.
Well planning technique drilling 42" hole and run 36" conductor, then install lower male connector and run conductor Down Hole Guide (DHG) assembly to be a guide for both two wells.
Land the DHG on the lower male connector.
Install upper male connector, which is equipped with two well slots for drilling the two wells.
Drilling 1st 16" hole and run 13 3/8" casing and cemented.
Skid over second slot and drill second hole 16" and run and cement 13 3/8" casing and carry out top up cement job for both hole up to surface inside 36" conductor.
Install casing head housing for each well.
Then each well could be drilled as per normal procedures.
Well executing process.
Well challenges: Drilling large hole 42" hole with 42" bit and BHA.
Run 36" conductor and conductor sharing DHG and keep aligned for accessibility of BHA and casing Nudge 16" hole for both two wells at centre-to-centre distance 8" safely without collision issue.
Run two 13 3/8" casing strings in 36" conductor and cement same up to surface.
Complete drilling well UL-056 from slot A, drilled 12 ¼" hole section to TH-I ABS, run 9 5/8" casing and perform cement job to surface, drilled 6" hole (linerless design) and land in TH II then continued drilling horizontal drain to TD, Run completion and deliver the well.
Suspend the other well in slot B at 13 3/8" casing with securing the well with abandonment cap and as per ADNOC offshore policy.

Related Results

Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
Analyses and Measurements of Conductor Response for Jack-up Drilled Wells in 110 m Water Depth in Harsh Environments.
Analyses and Measurements of Conductor Response for Jack-up Drilled Wells in 110 m Water Depth in Harsh Environments.
Abstract The analysis of conductor systems for wells drilled by jack-ups is often limited to analysis of the conductor alone as a free standing unit. This paper d...
Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Casing Drilling with Retrievable Drilling Assemblies
Casing Drilling with Retrievable Drilling Assemblies
Abstract Retrievable Casing Drilling* tools have been used to drill more than 600,000 ft of hole in over 120 wells encompassing six casing sizes ranging from 4-1/...
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...
Application of Multiphase Flow Methods to Horizontal Underbalanced Drilling
Application of Multiphase Flow Methods to Horizontal Underbalanced Drilling
Abstract Multiphase flow can be present in all aspects of underbalanced drilling. This paper outlines the ways in which multiphase flow pressure loss calculations...
Recent Developments In Drilling Fluid Technology
Recent Developments In Drilling Fluid Technology
Drilling Technology has been continuously faced with new problems in drilling deeper and more difficult holes. A major problem is excessive friction caused by unstable hole conditi...

Back to Top