Javascript must be enabled to continue!
Analyses and Measurements of Conductor Response for Jack-up Drilled Wells in 110 m Water Depth in Harsh Environments.
View through CrossRef
Abstract
The analysis of conductor systems for wells drilled by jack-ups is often limited to analysis of the conductor alone as a free standing unit. This paper discuss the various aspects of the analysis of the whole conductor system and shows that the limitations in strength may be in the conductor itself, but in other parts of the system
Introduction
This paper deals with top tensioned drilling conductors that are drilled from jack-up platforms. The conductor system consists of an outer drilling conductor cemented to the sea bed and kept in tension by a tension system on the jack-up. The conductor is guided horizontally at the Texas deck. The conductor system also includes equipment connected to the conductor such as BOP, wellhead, packer and overshot system. The paper describes a conductor system typical for the jack-up rig used for the deep water drilling. Other jack-ups may have different systems, but the main message of this paper on total system analysis is still valid.
Conclusion
It is important to model all elements of the conductor system for deep water jack-up drilled wells. There are strength limitations in various parts of the system, and changing the strength or stiffness of one part may have negative effects on other parts of the system.
Analyses of the drilling conductor
The analysis of the drilling conductor need to include all components in the system. Typical components included in the analysis are:Seabed fixation (soil-pipe interaction modelled with springs)Conductor pipe with internal pipes (pipe to pipe contact modelled)Texas deck supportTension systemAdjustable landing ringWellheadBOPMandrelPacker / overshotDiverter
In addition, the jack-up movements must be input to the analyses.
Title: Analyses and Measurements of Conductor Response for Jack-up Drilled Wells in 110 m Water Depth in Harsh Environments.
Description:
Abstract
The analysis of conductor systems for wells drilled by jack-ups is often limited to analysis of the conductor alone as a free standing unit.
This paper discuss the various aspects of the analysis of the whole conductor system and shows that the limitations in strength may be in the conductor itself, but in other parts of the system
Introduction
This paper deals with top tensioned drilling conductors that are drilled from jack-up platforms.
The conductor system consists of an outer drilling conductor cemented to the sea bed and kept in tension by a tension system on the jack-up.
The conductor is guided horizontally at the Texas deck.
The conductor system also includes equipment connected to the conductor such as BOP, wellhead, packer and overshot system.
The paper describes a conductor system typical for the jack-up rig used for the deep water drilling.
Other jack-ups may have different systems, but the main message of this paper on total system analysis is still valid.
Conclusion
It is important to model all elements of the conductor system for deep water jack-up drilled wells.
There are strength limitations in various parts of the system, and changing the strength or stiffness of one part may have negative effects on other parts of the system.
Analyses of the drilling conductor
The analysis of the drilling conductor need to include all components in the system.
Typical components included in the analysis are:Seabed fixation (soil-pipe interaction modelled with springs)Conductor pipe with internal pipes (pipe to pipe contact modelled)Texas deck supportTension systemAdjustable landing ringWellheadBOPMandrelPacker / overshotDiverter
In addition, the jack-up movements must be input to the analyses.
Related Results
Improvement of Conductor Driving Operation for Deeper Penetration to Prevent Drive-Drill Operation: Cost-Effective and Efficient Conductor Installation in Offshore East Java, Indonesia
Improvement of Conductor Driving Operation for Deeper Penetration to Prevent Drive-Drill Operation: Cost-Effective and Efficient Conductor Installation in Offshore East Java, Indonesia
Abstract
In December 2021, Husky-CNOOC Madura Limited (HCML) commenced the ten (10) wells development drilling campaign of three (3) fields (Field M1, Field M2, and ...
Developments in Appalachian Area in 1943
Developments in Appalachian Area in 1943
ABSTRACT
New York. The expected increase in wildcat drilling in New York state proved true in wells drilled but was utterly disappointing in results obtained. In ...
Survey Of Horizontal Gas Well Activity
Survey Of Horizontal Gas Well Activity
Abstract
This paper presents the results of a survey on horizontal gas well activity throughout the world. The survey was conducted for the Gas Research Institute...
Aging Offshore well Conductors Structural Integrity Issues and Challenges in their Life Extension
Aging Offshore well Conductors Structural Integrity Issues and Challenges in their Life Extension
Abstract
ADNOC Offshore operates more than 1300+ numbers of oil, gas and water offshore wells of age 59 years on wards, at 300+ well head platforms located in shallo...
Conductor Sharing Drilling Technique
Conductor Sharing Drilling Technique
Abstract
With the objective to drill two wells shared from one conductor with independent wellhead and completion, ADNOC Offshore drilling team pioneered for the fir...
Oil and Gas Developments in West Coast in 1986
Oil and Gas Developments in West Coast in 1986
ABSTRACT
Drilling activity in the West Coast region fell sharply in 1986 in response to plummeting crude oil and gas prices. Only 2,289 wells were drilled in the ...
Horizontal Wells In The Rosebank Alida Beds Pool, Saskatchewan
Horizontal Wells In The Rosebank Alida Beds Pool, Saskatchewan
Abstract
The Rosebank Alida Beds (Mississippian) pool of southeastern Saskatchewan is a mature oil field that has produced close to 5 million m3 of light oil sinc...
Successful and Efficient Drill & Drive Conductor Operation in Offshore East Java
Successful and Efficient Drill & Drive Conductor Operation in Offshore East Java
Abstracts
Conductor setting depth is critical to provide structural support for next drilling sections. The shoe strength must suffice for drilling ahead and avoid a...

