ADCO's Experience and Lessons Learned in Quality Management of Major Projects
View through CrossRef
Abstract
ADCO has recently managed a major project called 1.8 MMbd Bab Thamama G and Habshan 2 consists of additional wells, flow lines, new process units and modification of existing surface facilities that are required to increase oil production in the Bab field by a sustainable rate of 80 MBOPD.
The facilities will include four additional Remote Degassing Stations (RDSs), namely RDS-7, RDS-8, RDS-9 & RDS-10 that gather from numerous production flow lines and deliver the raw crude to the BCDS through transfer lines.
Overall Project Objectives is to achieve EPC completion by Q4 2012, improve on ADCO's HSE targets, and Implement project within approved budget
The purpose of this paper is to share ADCO's experience during project execution, both in terms of technical and project quality management issues. The paper highlights the challenges faced, achievements and lessons learnt during execution of the project.
Mitigation of increased risk and consequences of failures due to higher service severity, Cost/time optimization drive due to material delivered from new and cheap suppliers with less quality level, Increasing inspection tasks of materials from different sources, and Management of the Third Party Inspection (TPI) to control all scattered activities locally and overseas were some of the major quality challenges during execution of the project.
The projects quality control practices implemented throughout the lifecycle of the project, starting with conceptual and preliminary engineering, through detailed engineering, procurement and construction are highlighted in the paper.
Major lessons learnt, quality control improvements tools, and other project quality issues are discussed in the paper.
Title: ADCO's Experience and Lessons Learned in Quality Management of Major Projects
Description:
Abstract
ADCO has recently managed a major project called 1.
8 MMbd Bab Thamama G and Habshan 2 consists of additional wells, flow lines, new process units and modification of existing surface facilities that are required to increase oil production in the Bab field by a sustainable rate of 80 MBOPD.
The facilities will include four additional Remote Degassing Stations (RDSs), namely RDS-7, RDS-8, RDS-9 & RDS-10 that gather from numerous production flow lines and deliver the raw crude to the BCDS through transfer lines.
Overall Project Objectives is to achieve EPC completion by Q4 2012, improve on ADCO's HSE targets, and Implement project within approved budget
The purpose of this paper is to share ADCO's experience during project execution, both in terms of technical and project quality management issues.
The paper highlights the challenges faced, achievements and lessons learnt during execution of the project.
Mitigation of increased risk and consequences of failures due to higher service severity, Cost/time optimization drive due to material delivered from new and cheap suppliers with less quality level, Increasing inspection tasks of materials from different sources, and Management of the Third Party Inspection (TPI) to control all scattered activities locally and overseas were some of the major quality challenges during execution of the project.
The projects quality control practices implemented throughout the lifecycle of the project, starting with conceptual and preliminary engineering, through detailed engineering, procurement and construction are highlighted in the paper.
Major lessons learnt, quality control improvements tools, and other project quality issues are discussed in the paper.
Related Results
Simultaneous Operations for ADCO and Al Hosn at Shah Field
Simultaneous Operations for ADCO and Al Hosn at Shah Field
Abstract
Al Hosn Shah Gas (AHG) Development Project on-ground activities commenced in Shah Field during last quarter 2011.
Some of the major activitie...
Well Integrity Data Assessment WIDA Implementation through Integrating Established Well Data Systems to Increase Safe Operability for Wells with a History of Interdependence Integrity Issues
Well Integrity Data Assessment WIDA Implementation through Integrating Established Well Data Systems to Increase Safe Operability for Wells with a History of Interdependence Integrity Issues
Abstract
ADCO is accountable to operate a well stock with integrity, technical and operational challenges. It is the responsibility of ADCO to devise a system or met...
Challenges of knowledge management through lessons learned practices in construction industry: A North Cyprus perspective
Challenges of knowledge management through lessons learned practices in construction industry: A North Cyprus perspective
With the increasing pressure for competitiveness on construction contractors, it is necessary to capture, transfer and reuse project knowledge and use lessons learned from previous...
Challenges of knowledge management through lessons learned practices in construction industry: A North Cyprus perspective
Challenges of knowledge management through lessons learned practices in construction industry: A North Cyprus perspective
With the increasing pressure for competitiveness on construction contractors, it is necessary to capture, transfer and reuse project knowledge and use lessons learned from previous...
Challenges of knowledge management through lessons learned practices in construction industry: A North Cyprus perspective
Challenges of knowledge management through lessons learned practices in construction industry: A North Cyprus perspective
With the increasing pressure for competitiveness on construction contractors, it is necessary to capture, transfer and reuse project knowledge and use lessons learned from previous...
Oil Producer Tie-in Modular Skid
Oil Producer Tie-in Modular Skid
Abstract
Abu Dhabi Company for Onshore Petroleum Operations (ADCO) manages all oil production reservoirs in all of its assets. Through ADCO's commitment to improveme...
Abstract 1634: A comprehensive guide for managing large-scale collaborative genomics research projects
Abstract 1634: A comprehensive guide for managing large-scale collaborative genomics research projects
Abstract
Globally applicable best practices guidelines for managing large-scale collaborative genomics projects have been established using lessons learned from the ...
Measurable Progress? Teaching Artsworkers to Assess and Articulate the Impact of Their Work
Measurable Progress? Teaching Artsworkers to Assess and Articulate the Impact of Their Work
The National Cultural Policy Discussion Paper—drafted to assist the Australian Government in developing the first national Cultural Policy since Creative Nation nearly two decades ...