Design and Implementation of the First CO2-EOR Pilot in Abu Dhabi, UAE

View through CrossRef
Abstract Carbon Dioxide (CO2) Enhanced Oil Recovery (EOR) process is most likely to become the preferred hydrocarbon recovery process in future in Abu Dhabi. The complexity and cost of implementing large scale EOR projects require the development of a detailed EOR strategy, clearly defined targeted objectives, a visionary work-plan (roadmap) and staged evaluation prior to full field commercial implementation. Abu Dhabi Company for Onshore Oil Operations (ADCO) is in the process of conducting the first Middle-East CO2-EOR pilot in an onshore complex carbonate reservoir. This paper discusses the design and implementation of the first ADCO CO2-EOR Pilot Project which addresses key technical and business uncertainties and risks associated with CO2 injection in ADCO reservoirs in the future. The pilot was considered the best approach to evaluate feasibility of this EOR approach on a field scale in addition to other verifications through laboratory and simulation studies. The project started with a company-wide screening study which attempted to identify both the most appropriate EOR option for ADCO reservoirs and the best reservoir candidates. Subsequently, an in-house simulation study was conducted to confirm the best identified candidate reservoir. The Roadmap defined studies required to fill the required data gaps. Advanced CO2-PVT, Asphaltene and SCAL studies were conducted to reduce the uncertainties related to CO2 injection. The pilot objectives and constrains were clearly defined at the early stage of the project. Challenges of obtaining the required CO2 volumes for injection were overcome. A history matched compositional reservoir simulation model was used as an effective tool to design and optimize the pilot. Sufficient time and effort were expended in the pilot design and optimization in order to meet the implementation objectives in a timely manner. These include drilling of the wells, construction of the surface facilities, development and execution of the surveillance and monitoring plan and finally the operation of the pilot. This paper outlines the design and implementation of the first ever Middle-East CO2-EOR pilot in an On-shore complex carbonate field in Abu Dhabi, UAE.
Title: Design and Implementation of the First CO2-EOR Pilot in Abu Dhabi, UAE
Description:
Abstract Carbon Dioxide (CO2) Enhanced Oil Recovery (EOR) process is most likely to become the preferred hydrocarbon recovery process in future in Abu Dhabi.
The complexity and cost of implementing large scale EOR projects require the development of a detailed EOR strategy, clearly defined targeted objectives, a visionary work-plan (roadmap) and staged evaluation prior to full field commercial implementation.
Abu Dhabi Company for Onshore Oil Operations (ADCO) is in the process of conducting the first Middle-East CO2-EOR pilot in an onshore complex carbonate reservoir.
This paper discusses the design and implementation of the first ADCO CO2-EOR Pilot Project which addresses key technical and business uncertainties and risks associated with CO2 injection in ADCO reservoirs in the future.
The pilot was considered the best approach to evaluate feasibility of this EOR approach on a field scale in addition to other verifications through laboratory and simulation studies.
The project started with a company-wide screening study which attempted to identify both the most appropriate EOR option for ADCO reservoirs and the best reservoir candidates.
Subsequently, an in-house simulation study was conducted to confirm the best identified candidate reservoir.
The Roadmap defined studies required to fill the required data gaps.
Advanced CO2-PVT, Asphaltene and SCAL studies were conducted to reduce the uncertainties related to CO2 injection.
The pilot objectives and constrains were clearly defined at the early stage of the project.
Challenges of obtaining the required CO2 volumes for injection were overcome.
A history matched compositional reservoir simulation model was used as an effective tool to design and optimize the pilot.
Sufficient time and effort were expended in the pilot design and optimization in order to meet the implementation objectives in a timely manner.
These include drilling of the wells, construction of the surface facilities, development and execution of the surveillance and monitoring plan and finally the operation of the pilot.
This paper outlines the design and implementation of the first ever Middle-East CO2-EOR pilot in an On-shore complex carbonate field in Abu Dhabi, UAE.

Related Results

Outlook and Technologies for Offshore CO2 EOR/CCS Projects
Outlook and Technologies for Offshore CO2 EOR/CCS Projects
Abstract The challenges facing offshore CO2 enhanced oil recovery (EOR) and carbon capture and storage (CCS) projects are presented in this paper along with poten...
Technology Focus: CO2 Applications (July 2009)
Technology Focus: CO2 Applications (July 2009)
Technology Focus Can enhanced oil recovery (EOR) contribute to CO2 abatement as part of a climate-change-mitigation program? EOR by use of CO2 i...
Impact of CCUS Impurities on Dense Phase CO2 Pipeline Surface Engineering Design
Impact of CCUS Impurities on Dense Phase CO2 Pipeline Surface Engineering Design
Abstract Numerous CO2 injection pipeline applications have been developed and implemented in the past decades in the UAE and all around the globe. Transporting the C...
Drilling Into Diversity: Developing the Reservoir of Talent
Drilling Into Diversity: Developing the Reservoir of Talent
Abstract In the last few years, opportunities for women in the United Arab Emirates (UAE) have grown exponentially with professional and educational positions openin...
Building an Enhanced Oil Recovery Culture to Maximise Asset Values
Building an Enhanced Oil Recovery Culture to Maximise Asset Values
Abstract Global energy demand is forecasted to rise by over one-third from now until 2035. As the relatively easy oil reserves deplete, focus will shift to developme...
Complex Phased Development for CO2 EOR in Oil Carbonate Reservoir, Abu Dhabi Onshore
Complex Phased Development for CO2 EOR in Oil Carbonate Reservoir, Abu Dhabi Onshore
AbstractCO2 injection into oil reservoirs for EOR is well known as one of the most proven and efficient Enhanced Oil Recovery (EOR) processes. The subject study was conducted with ...
Design And Operation Of The Levelland Unit CO2 Injection Facility
Design And Operation Of The Levelland Unit CO2 Injection Facility
Abstract The Levelland CO2 Facility provides CO2 storageand handling capacity for the five CO2 injection pilots located in the Levelland Unit. Facilities pilots l...
Application of Enzyme EOR in a Mature UAE Offshore Carbonate Oil Field
Application of Enzyme EOR in a Mature UAE Offshore Carbonate Oil Field
Abstract Total has been operating oil and gas production from a series of heterogeneous reservoirs offshore Abu Dhabi since 1974. One of the main oil producing reser...