Kajian Teknis Optimasi Produksi Alat Gali-Muat dan Angkut pada Overburden Removal

View through CrossRef
Abstract. PT Pancaran Surya Abadi is a coal mining company located in Muara Badak District, Kutai Kartanegara Regency, East Kalimantan Province, employing the surface mining system. Based on the company's productivity data in February 2023, the actual overburden excavation in Pit B1 East Block reached 80,946.00 BCM, accounting for 33.15% of the planned production target of 244,160.00 BCM. The discrepancy led to obstacles in coal production due to a mismatch between digging-loading and hauling equipment (match factor) and road geometry not meeting applicable standards. Consequently, this study evaluates the production shortfall by assessing the technical fleet determination to optimize the overburden removal process. The technical evaluation involves simulating the match factor and adjusting related variables to determine the optimal number of machines in the fleet. The analysis refers to Ministerial Decree ESDM 1827/2018 and AASHTO (American Association of State Highway and Transportation Officials) 1965 for technical road geometry recommendations supporting optimal fleet productivity. Field research in February-March 2023 yielded a match factor of 0.85 and a production rate of 164.03 BCM/hour, achieving 75.24% of the hourly production target. Optimization increased the match factor to 1.03, raising production to 230.91 BCM/hour or 258,622.18 BCM/month, ensuring the attainment of the 218 BCM/hour productive day shift target. Abstrak. PT Pancaran Surya Abadi merupakan perusahaan pertambangan batubara yang berlokasi di Kecamatan Muara Badak, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur, dan menggunakan sistem penambangan terbuka. Berdasarkan data produktivitas perusahaan pada bulan Februari 2023, penggalian overburden aktual di Pit B1 Blok Timur mencapai 80.946,00 BCM, yang merupakan 33,15% dari target produksi rencana sebesar 244.160,00 BCM. Ketidaksesuaian ini menyebabkan hambatan dalam produksi batubara karena ketidakcocokan antara peralatan penggalian-pemuatan dan pengangkutan (match factor) serta geometri jalan yang tidak memenuhi standar yang berlaku. Oleh karena itu, penelitian ini mengevaluasi ketidakcapaian produksi dengan menilai penentuan armada teknis untuk mengoptimalkan proses pengangkatan overburden. Evaluasi teknis melibatkan simulasi match factor dan penyesuaian variabel terkait untuk menentukan jumlah optimal mesin dalam armada. Analisis mengacu pada Keputusan Menteri ESDM 1827/2018 dan AASHTO (American Association of State Highway and Transportation Officials) 1965 untuk rekomendasi geometri jalan teknis yang mendukung produktivitas armada yang optimal. Penelitian lapangan pada Februari-Maret 2023 menghasilkan match factor sebesar 0,85 dan produksi sebesar 164,03 BCM/jam, mencapai 75,24% dari target produksi per jam. Optimasi meningkatkan match factor menjadi 1,03, meningkatkan produksi menjadi 230,91 BCM/jam atau 258.622,18 BCM/bulan, memastikan pencapaian target produksi per jam pada shift kerja yang produktif sebesar 218 BCM/jam.
Title: Kajian Teknis Optimasi Produksi Alat Gali-Muat dan Angkut pada Overburden Removal
Description:
Abstract.
PT Pancaran Surya Abadi is a coal mining company located in Muara Badak District, Kutai Kartanegara Regency, East Kalimantan Province, employing the surface mining system.
Based on the company's productivity data in February 2023, the actual overburden excavation in Pit B1 East Block reached 80,946.
00 BCM, accounting for 33.
15% of the planned production target of 244,160.
00 BCM.
The discrepancy led to obstacles in coal production due to a mismatch between digging-loading and hauling equipment (match factor) and road geometry not meeting applicable standards.
Consequently, this study evaluates the production shortfall by assessing the technical fleet determination to optimize the overburden removal process.
The technical evaluation involves simulating the match factor and adjusting related variables to determine the optimal number of machines in the fleet.
The analysis refers to Ministerial Decree ESDM 1827/2018 and AASHTO (American Association of State Highway and Transportation Officials) 1965 for technical road geometry recommendations supporting optimal fleet productivity.
Field research in February-March 2023 yielded a match factor of 0.
85 and a production rate of 164.
03 BCM/hour, achieving 75.
24% of the hourly production target.
Optimization increased the match factor to 1.
03, raising production to 230.
91 BCM/hour or 258,622.
18 BCM/month, ensuring the attainment of the 218 BCM/hour productive day shift target.
Abstrak.
PT Pancaran Surya Abadi merupakan perusahaan pertambangan batubara yang berlokasi di Kecamatan Muara Badak, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur, dan menggunakan sistem penambangan terbuka.
Berdasarkan data produktivitas perusahaan pada bulan Februari 2023, penggalian overburden aktual di Pit B1 Blok Timur mencapai 80.
946,00 BCM, yang merupakan 33,15% dari target produksi rencana sebesar 244.
160,00 BCM.
Ketidaksesuaian ini menyebabkan hambatan dalam produksi batubara karena ketidakcocokan antara peralatan penggalian-pemuatan dan pengangkutan (match factor) serta geometri jalan yang tidak memenuhi standar yang berlaku.
Oleh karena itu, penelitian ini mengevaluasi ketidakcapaian produksi dengan menilai penentuan armada teknis untuk mengoptimalkan proses pengangkatan overburden.
Evaluasi teknis melibatkan simulasi match factor dan penyesuaian variabel terkait untuk menentukan jumlah optimal mesin dalam armada.
Analisis mengacu pada Keputusan Menteri ESDM 1827/2018 dan AASHTO (American Association of State Highway and Transportation Officials) 1965 untuk rekomendasi geometri jalan teknis yang mendukung produktivitas armada yang optimal.
Penelitian lapangan pada Februari-Maret 2023 menghasilkan match factor sebesar 0,85 dan produksi sebesar 164,03 BCM/jam, mencapai 75,24% dari target produksi per jam.
Optimasi meningkatkan match factor menjadi 1,03, meningkatkan produksi menjadi 230,91 BCM/jam atau 258.
622,18 BCM/bulan, memastikan pencapaian target produksi per jam pada shift kerja yang produktif sebesar 218 BCM/jam.

Related Results

Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct Introduction Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
FAKTOR-FAKTOR PENYEBAB RENDAHNYA FUNGSI SHIP CRANE TERHADAP PROSES BONGKAR MUAT MV. MADISON
FAKTOR-FAKTOR PENYEBAB RENDAHNYA FUNGSI SHIP CRANE TERHADAP PROSES BONGKAR MUAT MV. MADISON
Dalam proses bongkar muat di sebuah kapal container sebuah alat bongkar muat sangatlah dibutuhkan dan juga kondis yang baik juga diperlukan dalam proses bongkar muatnya. Berdasarka...
Kajian Produktivitas Alat untuk Mengoptimalkan Hasil Produksi Overburden di PT. Karebet Mas Indonesia Site Kutai Energi Kalimantan Timur
Kajian Produktivitas Alat untuk Mengoptimalkan Hasil Produksi Overburden di PT. Karebet Mas Indonesia Site Kutai Energi Kalimantan Timur
Penambangan overburden dan batubara harus beriringan dan sejalan, karena dengan tingginya produktivitas overburden akan berpengaruh pada hasil produksi batubara. Penelitian ini ber...
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature  Review Anna Tri Wahyuni1), Masfuri2),  Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
Aktual Evaluasi Cycle Time Kesesuaian Armada Alat Gali-Muat Angkut Produksi Andesit
Aktual Evaluasi Cycle Time Kesesuaian Armada Alat Gali-Muat Angkut Produksi Andesit
Abstract. PT Winner Prima is an andesite mining company located in Banten Province that applies an open-pit mining method. Production activities depend on the performance of excava...
Pengaruh Geometri Jalan Terhadap Produktivitas Alat Angkut
Pengaruh Geometri Jalan Terhadap Produktivitas Alat Angkut
Abstract. Based on the actual conditions in the field, there are several road geometries that are not in accordance with the standards resulting in high traffic density. This cause...