Abstract This paper describes the development of full-bore wellheads, a new 18-3/4 in.15,000 psi W.P. system, from conception to field installation. The wellheadwhen installed has a full-bore diameter without a casing hanger landingshoulder to allow one more casing string to be run below the mudline under BOPcontrol due to this major wellhead innovation. Introduction Today wells are being drilled in deeper and deeper water which associates tohigher costs. More economical risk is taken to drill wells in deeper water andreaching the 'payzone' with a sufficient size production string to produce fromis more important than ever before. In addition to deeper water, there is aneed to find ways to drill in more difficult formations some of which includevarious shallow zone hazards1. As a result of these concerns, there has been a demand to find ways to ensurethat the operators can reach the planned hole depth and/or size required toproduce from. Unforeseen hole problems that may have not been expected mayhinder reaching the depth requirements. By providing one more casing stringthan a conventional 18-3/4 in. wellhead system, a better opportunity to reachthe desired hole depth and size can be achieved. To help solve these problems a new 18-3/4 in. wellhead system with a 36 in.conductor string was designed and implemented. A 36 in. × 18-3/4 in. wellheadsystem consists of the following casing program:Conventional:6 in. × 28 in./26 in. × 20 in. × 16 in. × 13-3/8 in. × 9-5/8 in. × 7 in.Full-bore:36 in. × 28 in./26 in. × 22 in. × 18 in. × 16 in. × 13-3/8 in. × 9-5/8 in. × 7in. The new system adds the 18 in. string which is run under BOP control, and the20 in. becomes 22 in. hanging from the high pressure housing as shown in FigureA. The 36 in. string is jetted or cemented in place using conventional methods. The 18-3/4 in. high pressure housing is run with 22 in. casing suspended fromthe bottom and landed in the 36 in. housing and cemented in place. The 18 in.string is landed in the 22 in. string below the mudline in its respective sub. The 16 in. string is run like the 18 in. string, but it will land in anindependent sub in the 22 in. string above the 18 in. string and below the highpressure housing. The load shoulder is then set in the high pressure housing,and 13-3/8 in., 9-5/8 in. and 7 in. casing can be run and set, respectively, with each subsequent casing string landing on top of the other. The new system provides one more casing string to the above conventionalprogram, but with reduced radial clearances between several of the strings. Furthermore, due to the tight clearances, drives the requirement for highclearance or flush joint connections. This additional string of casing helpsoperators utilize existing rig equipment sizes and capabilities1.
Title: 18-3/4 in. FullBore Wellhead System
Description:
Abstract This paper describes the development of full-bore wellheads, a new 18-3/4 in.
15,000 psi W.
P.
system, from conception to field installation.
The wellheadwhen installed has a full-bore diameter without a casing hanger landingshoulder to allow one more casing string to be run below the mudline under BOPcontrol due to this major wellhead innovation.
Introduction Today wells are being drilled in deeper and deeper water which associates tohigher costs.
More economical risk is taken to drill wells in deeper water andreaching the 'payzone' with a sufficient size production string to produce fromis more important than ever before.
In addition to deeper water, there is aneed to find ways to drill in more difficult formations some of which includevarious shallow zone hazards1.
As a result of these concerns, there has been a demand to find ways to ensurethat the operators can reach the planned hole depth and/or size required toproduce from.
Unforeseen hole problems that may have not been expected mayhinder reaching the depth requirements.
By providing one more casing stringthan a conventional 18-3/4 in.
wellhead system, a better opportunity to reachthe desired hole depth and size can be achieved.
To help solve these problems a new 18-3/4 in.
wellhead system with a 36 in.
conductor string was designed and implemented.
A 36 in.
× 18-3/4 in.
wellheadsystem consists of the following casing program:Conventional:6 in.
× 28 in.
/26 in.
× 20 in.
× 16 in.
× 13-3/8 in.
× 9-5/8 in.
× 7 in.
Full-bore:36 in.
× 28 in.
/26 in.
× 22 in.
× 18 in.
× 16 in.
× 13-3/8 in.
× 9-5/8 in.
× 7in.
The new system adds the 18 in.
string which is run under BOP control, and the20 in.
becomes 22 in.
hanging from the high pressure housing as shown in FigureA.
The 36 in.
string is jetted or cemented in place using conventional methods.
The 18-3/4 in.
high pressure housing is run with 22 in.
casing suspended fromthe bottom and landed in the 36 in.
housing and cemented in place.
The 18 in.
string is landed in the 22 in.
string below the mudline in its respective sub.
The 16 in.
string is run like the 18 in.
string, but it will land in anindependent sub in the 22 in.
string above the 18 in.
string and below the highpressure housing.
The load shoulder is then set in the high pressure housing,and 13-3/8 in.
, 9-5/8 in.
and 7 in.
casing can be run and set, respectively, with each subsequent casing string landing on top of the other.
The new system provides one more casing string to the above conventionalprogram, but with reduced radial clearances between several of the strings.
Furthermore, due to the tight clearances, drives the requirement for highclearance or flush joint connections.
This additional string of casing helpsoperators utilize existing rig equipment sizes and capabilities1.

Related Results

Key Learning Experience in Managing Prolific High Temperature Wells in Offshore Malaysia
Key Learning Experience in Managing Prolific High Temperature Wells in Offshore Malaysia
Abstract Well integrity management for High Temperature (HT) wells can be challenging due to stresses and cyclic behaviour during thermal expansion or corrosive stre...
Mitigating Wellhead Fatigue While Reducing HSE Risk, Deck Spread, Deployment Time, and Crew Size
Mitigating Wellhead Fatigue While Reducing HSE Risk, Deck Spread, Deployment Time, and Crew Size
Abstract Subsea wellhead systems have a design fatigue life that is expected to withstand the damage incurred from stress caused by cyclic loading during its operati...
Development of an Automatic Reentry Positioning System
Development of an Automatic Reentry Positioning System
ABSTRACT This paper describes the concept, design, analysis and sea trials of the reentry system, and particularly its positioning system. Its development was con...
Perbandingan Pemilihan Antara Tipe Wellhead Conventional Dengan Wellhead Unihead
Perbandingan Pemilihan Antara Tipe Wellhead Conventional Dengan Wellhead Unihead
The wellhead is a surface well control device made of steel which forms a seal / baffle system to withstand bursts or leaks of liquid from the well to the surface composed of casin...
Magnetometer Survey: Multi-Discipline Collaboration Impacting Bottom Line
Magnetometer Survey: Multi-Discipline Collaboration Impacting Bottom Line
Abstract Central Luconia has been explored with hundreds of well since the 1950s. During that time, all offshore wells were drilled using hyperbolic positioning syst...
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
The coupling effects between MODU and slim drilling riser are of primary importance in analysis of dynamic response of drilling riser system. However,, the effect of MODU on drilli...
Numerical Simulation of Subsea Wellhead Stability for Deepwater Drilling
Numerical Simulation of Subsea Wellhead Stability for Deepwater Drilling
Abstract Subsea wellhead bearings complex stress because it joint with the marine riser and casing string. According to mechanical analysis of subsea wellhead for de...
Reducing Artificial Lift Surface Conversion Costs in a Unconventional Oil Field
Reducing Artificial Lift Surface Conversion Costs in a Unconventional Oil Field
Abstract The Tourmaline Oil Corporation's light oil play (The Field) utilizes electrical submersible pumps (ESP's) for the dewatering and initial production (IP) pha...