Javascript must be enabled to continue!
Sistem Monitoring Beban Trafo Distribusi Secara Visual Dan Sms Gateway di PT PLN (Persero)
View through CrossRef
Economic growth of the community encourages the increasing electricity demand. To meet the electricity demand, of course, it is necessary to increase the capacity of the distribution transformer with the addition of an insert transformer and a new transformer. So that the increasing number of installed transformers is not proportional to the number of officers measuring the transformer load. The problem is the number of transformers is 3,938 units at PLN UP3 Padang with only 70 teams of load measuring officers, so load measurement only reaches 68% in 2019. This is because load measurements are carried out manually by mandating substations one by one, thus requiring large human resources and costs. Under these conditions, an easy and fast load measurement monitoring system is needed. This study uses the Root Cause Problem Solving (RCPS) methodology and System and Equipment Design by creating a Visual Transformer Load Monitoring System and SMS Gateway. With this system and equipment, the load of the substation can be easily seen visually with a light indicator installed on the panel box of the substation pole, so that the condition of the transformer can be quickly identified. The telemetering function with SMS sends load data to officers so that the risk of transformer damage can be reduced because this tool is an early warning against unbalanced loads, one phase outages with the Condition Base Maintenance (CBM) principle so that PLN can maintain transformer lifetime and maintain service quality.
Keywords: Load Monitor, Visual and SMS Gateway, Distribution Transformer
Title: Sistem Monitoring Beban Trafo Distribusi Secara Visual Dan Sms Gateway di PT PLN (Persero)
Description:
Economic growth of the community encourages the increasing electricity demand.
To meet the electricity demand, of course, it is necessary to increase the capacity of the distribution transformer with the addition of an insert transformer and a new transformer.
So that the increasing number of installed transformers is not proportional to the number of officers measuring the transformer load.
The problem is the number of transformers is 3,938 units at PLN UP3 Padang with only 70 teams of load measuring officers, so load measurement only reaches 68% in 2019.
This is because load measurements are carried out manually by mandating substations one by one, thus requiring large human resources and costs.
Under these conditions, an easy and fast load measurement monitoring system is needed.
This study uses the Root Cause Problem Solving (RCPS) methodology and System and Equipment Design by creating a Visual Transformer Load Monitoring System and SMS Gateway.
With this system and equipment, the load of the substation can be easily seen visually with a light indicator installed on the panel box of the substation pole, so that the condition of the transformer can be quickly identified.
The telemetering function with SMS sends load data to officers so that the risk of transformer damage can be reduced because this tool is an early warning against unbalanced loads, one phase outages with the Condition Base Maintenance (CBM) principle so that PLN can maintain transformer lifetime and maintain service quality.
Keywords: Load Monitor, Visual and SMS Gateway, Distribution Transformer
.
Related Results
Pengaruh Ketidakseimbangan Beban Terhadap Losses dan Pembebanan Transformator Distribusi
Pengaruh Ketidakseimbangan Beban Terhadap Losses dan Pembebanan Transformator Distribusi
Wilayah kerja PT. PLN (Persero) Wilayah Suluttenggo Cabang Gorontalo dapat di katakan memiliki area suplay listrik yang cukup luas. Pada umumnya rumah tangga, industry, perkantoran...
Analisis Rugi Tegangan Jaringan Distribusi 20 KV Pada PT. PLN (Persero) Cabang Merauke
Analisis Rugi Tegangan Jaringan Distribusi 20 KV Pada PT. PLN (Persero) Cabang Merauke
Sistem Distribusi merupakan salah satu bagian penting dalam penyaluran energi listrik. Dalam penyalurannya, energi listrik yang disalurkan tidak seluruhnya diterima oleh konsumen. ...
Penggunaan SMS Gateway pada Sistem Informasi Pengasuhan dan Pengajaran Pesantren Berbasis Web
Penggunaan SMS Gateway pada Sistem Informasi Pengasuhan dan Pengajaran Pesantren Berbasis Web
AbstractNowadays information systems are widely chosen as media to help human activities in a way that is more efficient both in energy and in time. The registry of modern boarding...
Desain Controling Pengaman Arus Lebih Berbasis Arduino
Desain Controling Pengaman Arus Lebih Berbasis Arduino
Transformator atau trafo adalah alat listrik melalui gandengan magnet memindahkan daya listrik dari suatu rangkaian ke rangkaian lainya dengan frekuensi yang sama. Tegangan dapat d...
Minimalisasi Pengaruh Ketidakseimbangan Beban Transformator Distribusi Terhadap Arus Netral Di PT. PLN (Persero) ULP Sentani Penyulang Matoa
Minimalisasi Pengaruh Ketidakseimbangan Beban Transformator Distribusi Terhadap Arus Netral Di PT. PLN (Persero) ULP Sentani Penyulang Matoa
Ketidakseimbangan beban sistem tiga fasa adalah permasalahan yang tidak asing lagi bagi peneliti dan teknisi sistem tenaga listrik. Akibatnya dapat menimbulkan adanya susut daya pa...
Pembebanan Transformator Distribusi di PT. Distribusi Energi Mandiri Makassar
Pembebanan Transformator Distribusi di PT. Distribusi Energi Mandiri Makassar
Transformator merupakan suatu alat listrik yang mengubah tegangan arus bolak-balik dari satu tingkat ke tingkat yang lain melalui suatu gandengan magnet dan berdasarkan prinsip-pri...
Centaurs transitioning to JFCs: thermal and dynamical evolution
Centaurs transitioning to JFCs: thermal and dynamical evolution
<p>1- Context</p>
<p>Jupiter-family Comets are continuously replenished from their outer solar system reservoirs. Before they enter the in...
PENGARUH KUALITAS PELAYANAN TERHADAP KEPUASAN PELANGGAN PLN RAYON KEDIRI KOTA (STUDI KASUS PEMBAYARAN REKENING LISTRIK DI PLN RAYON KEDIRI KOTA)
PENGARUH KUALITAS PELAYANAN TERHADAP KEPUASAN PELANGGAN PLN RAYON KEDIRI KOTA (STUDI KASUS PEMBAYARAN REKENING LISTRIK DI PLN RAYON KEDIRI KOTA)
This study aims to determine how high the level of customer satisfaction with the service of PLN Rayon Kediri Kota, to determine the quality of service to customer satisfaction PLN...

