Javascript must be enabled to continue!
Risk Evaluation Technique for Tubing-Conveyed Perforating
View through CrossRef
Abstract
This paper presents one application of a simulation tool that predicts tubing-conveyed perforating gunshock loads reliably. The tool enables completion engineers to evaluate the sensitivity of gunshock loads to changes in gun type, charge type, shot density, tubing size and length, rathole length, use of shock absorbers, and placement of packers, among others.
The simulation tool described in this paper helps engineers to identify perforating jobs that have a risk of gunshock related damage, such as bent tubing and unset packers. When predicted gunshock loads are large, changes to the perforating equipment or job execution parameters are sought to reduce gunshock loads and the associated risks.
Comparisons between predicted wellbore pressure and actual fast-gauge pressure data are available in related SPE articles. These comparisons show that predicted wellbore pressure transients are very reliable both in magnitude and time. Peak sustained pressure amplitudes at the gauges are on average within 10% of software-simulated values. For cases where shock absorbers were used, residual deformations of crushable elements correlate well with the peak axial loads predicted by the software. The software is able to simulate perforating job designs in a short time, which allows engineers to optimize perforation jobs by reducing gunshock loads and equipment costs.
The ability to predict and reduce gunshock-induced damage in perforating operations is very important because of the high value of typical wells. With the software tool described in this paper engineers can optimize perforation jobs by minimizing the risk of gunshock-related damage and the associated non-productive time (NPT).
Title: Risk Evaluation Technique for Tubing-Conveyed Perforating
Description:
Abstract
This paper presents one application of a simulation tool that predicts tubing-conveyed perforating gunshock loads reliably.
The tool enables completion engineers to evaluate the sensitivity of gunshock loads to changes in gun type, charge type, shot density, tubing size and length, rathole length, use of shock absorbers, and placement of packers, among others.
The simulation tool described in this paper helps engineers to identify perforating jobs that have a risk of gunshock related damage, such as bent tubing and unset packers.
When predicted gunshock loads are large, changes to the perforating equipment or job execution parameters are sought to reduce gunshock loads and the associated risks.
Comparisons between predicted wellbore pressure and actual fast-gauge pressure data are available in related SPE articles.
These comparisons show that predicted wellbore pressure transients are very reliable both in magnitude and time.
Peak sustained pressure amplitudes at the gauges are on average within 10% of software-simulated values.
For cases where shock absorbers were used, residual deformations of crushable elements correlate well with the peak axial loads predicted by the software.
The software is able to simulate perforating job designs in a short time, which allows engineers to optimize perforation jobs by reducing gunshock loads and equipment costs.
The ability to predict and reduce gunshock-induced damage in perforating operations is very important because of the high value of typical wells.
With the software tool described in this paper engineers can optimize perforation jobs by minimizing the risk of gunshock-related damage and the associated non-productive time (NPT).
Related Results
Perforating the Largest Deepwater Wells in Brazil - Minimizing Shock Loads
Perforating the Largest Deepwater Wells in Brazil - Minimizing Shock Loads
Abstract
Perforating the extremely large deepwater wells in the Santos Basin fields, offshore Brazil, is done in a single-trip, shoot-and-pull operation, using 7.0-i...
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Abstract
This paper provides in-depth analysis of a low-cost solution to economically sustain production and avoid high workover costs. This paper conducts the techn...
Perforation Optimisation of a Layered Reservoir
Perforation Optimisation of a Layered Reservoir
B. Costaschuk SPE, Agip (U.K.) Limited
Abstract
A new coiled tubing perforating deployment system which allows long gun lengths ...
Prediction and Reduction of Perforating Gunshock Loads
Prediction and Reduction of Perforating Gunshock Loads
Abstract
Most wells and particularly high-pressure wells are susceptible to gunshock damage when they are perforated with inappropriate gun systems and/or under s...
Case Study: Oilfield Completion Technology and Reservoir Analysis Optimizes Injectivity for Geothermal Water Production in the Netherlands
Case Study: Oilfield Completion Technology and Reservoir Analysis Optimizes Injectivity for Geothermal Water Production in the Netherlands
Abstract
The Greenport Westland-Oostkand is a geothermal heating project near Maasdijk, Netherlands; it comprises 153 doublets within a 170km2 area with the potentia...
Developing and Fielding Perforating Systems: A Comparison in High-Pressure Wells
Developing and Fielding Perforating Systems: A Comparison in High-Pressure Wells
Abstract
This paper presents an outline for the development and deployment of three perforating systems to address several needs of high pressure (HP) US Gulf of Mex...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract
OBJECTIVE / SCOPE
An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Effects of Buckled Tubing on Coiled Tubing Passibility
Effects of Buckled Tubing on Coiled Tubing Passibility
Abstract
Many coiled tubing(CT) operations involve passage through the production tubing. However, due to the adverse wellbore trajectory or tubing geometries, espec...

