Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Developing and Fielding Perforating Systems: A Comparison in High-Pressure Wells

View through CrossRef
Abstract This paper presents an outline for the development and deployment of three perforating systems to address several needs of high pressure (HP) US Gulf of Mexico wells. A case study is presented, highlighting the key differences between systems, and includes comparisons between data obtained during engineering development and field deployment phases During the development phase rigorous testing was conducted in line with API RP 19B sections 2, 3.14, and 5 to characterize the perforating systems' performance. These tests were executed to assess charge performance, system pressure rating at downhole conditions, and debris characteristics at surface conditions. Following the development testing, the systems were fielded with wellbore pressure being captured on downhole gauges to assess the perforating event response comparing to pre-deployment models. Additionally, wellbore debris recovered post-perforating was evaluated on surface. The first system was to support an HP application that requires high flow area in heavy wall casing. This was the platform for other less traditional systems to expand upon. Utilizing high shot density and big hole (BH) charges, this system was tested to provide a system rating of up to 30 ksi at 425°F while retaining fishability in heavy wall casing. For this system, wellbore effects from perforating, such as dynamic underbalance and recovered debris, are qualitatively aligned with existing perforators. The second system was optimized to control dynamic transient loading on the perforating string and minimize debris in HP environments. This meant the system was required to fit into a strategy of lowering dynamic structural loads on the workstring created during perforating. The system was designed to affect the pressure interactions among the gun internals, wellbore, and the formation, and control the amount of formation material inflow and debris produced by perforating. This perforating system was developed, qualified, and successfully fielded in multiple wells without any operational issues. The third system provides increased formation penetration depth without sacrificing shot density. By using deep penetrating (DP) charges, this system is can provide penetration past drilling damage or mitigate higher formation strengths encountered at greater depths in some HP US GoM reservoirs, thus providing operators improved connectivity to the formation. Evaluating perforating system performance, not only with lab testing but with field-gathered data, is crucial to closing the development loop for HP applications where testing is not practical due to both scale and replication of wellbore conditions. In deployment, the well conditions for the systems were analogous, highlighting the differences in data, thus providing a more complete background for operators to assess the suitability of these systems in HP applications and evaluate their perforating method to maximize production.
Title: Developing and Fielding Perforating Systems: A Comparison in High-Pressure Wells
Description:
Abstract This paper presents an outline for the development and deployment of three perforating systems to address several needs of high pressure (HP) US Gulf of Mexico wells.
A case study is presented, highlighting the key differences between systems, and includes comparisons between data obtained during engineering development and field deployment phases During the development phase rigorous testing was conducted in line with API RP 19B sections 2, 3.
14, and 5 to characterize the perforating systems' performance.
These tests were executed to assess charge performance, system pressure rating at downhole conditions, and debris characteristics at surface conditions.
Following the development testing, the systems were fielded with wellbore pressure being captured on downhole gauges to assess the perforating event response comparing to pre-deployment models.
Additionally, wellbore debris recovered post-perforating was evaluated on surface.
The first system was to support an HP application that requires high flow area in heavy wall casing.
This was the platform for other less traditional systems to expand upon.
Utilizing high shot density and big hole (BH) charges, this system was tested to provide a system rating of up to 30 ksi at 425°F while retaining fishability in heavy wall casing.
For this system, wellbore effects from perforating, such as dynamic underbalance and recovered debris, are qualitatively aligned with existing perforators.
The second system was optimized to control dynamic transient loading on the perforating string and minimize debris in HP environments.
This meant the system was required to fit into a strategy of lowering dynamic structural loads on the workstring created during perforating.
The system was designed to affect the pressure interactions among the gun internals, wellbore, and the formation, and control the amount of formation material inflow and debris produced by perforating.
This perforating system was developed, qualified, and successfully fielded in multiple wells without any operational issues.
The third system provides increased formation penetration depth without sacrificing shot density.
By using deep penetrating (DP) charges, this system is can provide penetration past drilling damage or mitigate higher formation strengths encountered at greater depths in some HP US GoM reservoirs, thus providing operators improved connectivity to the formation.
Evaluating perforating system performance, not only with lab testing but with field-gathered data, is crucial to closing the development loop for HP applications where testing is not practical due to both scale and replication of wellbore conditions.
In deployment, the well conditions for the systems were analogous, highlighting the differences in data, thus providing a more complete background for operators to assess the suitability of these systems in HP applications and evaluate their perforating method to maximize production.

Related Results

Prediction and Reduction of Perforating Gunshock Loads
Prediction and Reduction of Perforating Gunshock Loads
Abstract Most wells and particularly high-pressure wells are susceptible to gunshock damage when they are perforated with inappropriate gun systems and/or under s...
Perforating the Largest Deepwater Wells in Brazil - Minimizing Shock Loads
Perforating the Largest Deepwater Wells in Brazil - Minimizing Shock Loads
Abstract Perforating the extremely large deepwater wells in the Santos Basin fields, offshore Brazil, is done in a single-trip, shoot-and-pull operation, using 7.0-i...
Step Changes in Coiled Tubing Abrasive Perforating Efficiency and Reliability Using Real-Time Downhole Data
Step Changes in Coiled Tubing Abrasive Perforating Efficiency and Reliability Using Real-Time Downhole Data
Abstract Lack of real-time downhole data for accurate depth correlation and precise control of pressure actuated tools, often result in inefficient coiled tubing (CT...
Underbalance Perforation in Long Horizontal Wells in the Andrew Field
Underbalance Perforation in Long Horizontal Wells in the Andrew Field
SummaryAndrew field in the U.K. Continental Shelf, which is operated by British Petroleum (BP) Exploration, is being developed using horizontal oil producers and completed with cem...
Technology Update: New Instrumented Docking Gun System Maximizes Perforating Performance
Technology Update: New Instrumented Docking Gun System Maximizes Perforating Performance
Technology Update Accidental detonation of a perforating gun at surface can have catastrophic consequences. To decrease risks, layers of procedural controls have bee...
Survey Of Horizontal Gas Well Activity
Survey Of Horizontal Gas Well Activity
Abstract This paper presents the results of a survey on horizontal gas well activity throughout the world. The survey was conducted for the Gas Research Institute...
Multistage Pulse Deep Penetrating Perforation Technology
Multistage Pulse Deep Penetrating Perforation Technology
Abstract This paper describes the effect of this technology on perforation and production increase mainly in three aspects, namely, the principle, technical characte...
Propellant Assisted Perforating -- An Effective Method for Reducing Formation Damage When Perforating
Propellant Assisted Perforating -- An Effective Method for Reducing Formation Damage When Perforating
Abstract During the completion of a well the utilization of a propellant stimulation system immediately after or at the time of perforating has been demonstrated to ...

Back to Top