Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

241-AY-102 Leak Detection Pit Drain Line Inspection

View through CrossRef
Abstract On August 1,2012 a routine visual inspection showed the presence of unexpected material on the floor of the secondary liner in Tank 241-AY-102 (AY-102). In October 2012, it was determined that waste had leaked into the annulus of AY-102. As a result, an extensive review of Tank AY-102 was conducted quickly triggering increased inspection and monitoring of the tank; however, the precise cause and location of the leak could not be determined. At the same time the Tank AY-102 leak detection pit (LDP) was accumulating water through the drain system external to the secondary tank liner. Liquid collecting in the LDP is suspected to be from water intrusion and collects at a rate such that the LDP must be pumped routinely. Following a routine pumping event, elevated radiation dose rates were noted on the transfer hose and surface contamination readings were found on the transfer pump when it was removed from the Tank AY-102 LDP. These two field readings suggested that tank waste from a secondary liner breach could be leaking into the LDP. Therefore, a plan was initiated to ascertain the integrity of the secondary tank liner including a robotic inspection of the LDP. This paper provides a description of the design components, operational approach, and those results gained from the Tank AY-102 LDP drain piping visual inspection. To perform this inspection, a custom robotic crawler with a deployment device was designed, built, and operated, through subcontract, to inspect the 6 in (152.4mm) leak detection pit drain line. These tasks were accomplished, from initial award of the contract to completion of the inspection, in about two months.
Title: 241-AY-102 Leak Detection Pit Drain Line Inspection
Description:
Abstract On August 1,2012 a routine visual inspection showed the presence of unexpected material on the floor of the secondary liner in Tank 241-AY-102 (AY-102).
In October 2012, it was determined that waste had leaked into the annulus of AY-102.
As a result, an extensive review of Tank AY-102 was conducted quickly triggering increased inspection and monitoring of the tank; however, the precise cause and location of the leak could not be determined.
At the same time the Tank AY-102 leak detection pit (LDP) was accumulating water through the drain system external to the secondary tank liner.
Liquid collecting in the LDP is suspected to be from water intrusion and collects at a rate such that the LDP must be pumped routinely.
Following a routine pumping event, elevated radiation dose rates were noted on the transfer hose and surface contamination readings were found on the transfer pump when it was removed from the Tank AY-102 LDP.
These two field readings suggested that tank waste from a secondary liner breach could be leaking into the LDP.
Therefore, a plan was initiated to ascertain the integrity of the secondary tank liner including a robotic inspection of the LDP.
This paper provides a description of the design components, operational approach, and those results gained from the Tank AY-102 LDP drain piping visual inspection.
To perform this inspection, a custom robotic crawler with a deployment device was designed, built, and operated, through subcontract, to inspect the 6 in (152.
4mm) leak detection pit drain line.
These tasks were accomplished, from initial award of the contract to completion of the inspection, in about two months.

Related Results

Mechanism of the Double peaked El Nino
Mechanism of the Double peaked El Nino
<p>   In the past decades, our understanding of the ENSO phenomenon increased steadily. Especially, one of the most interesting topics was t...
Pit-1 Gene Expression in Human Pituitary Adenomas
Pit-1 Gene Expression in Human Pituitary Adenomas
The anterior pituitary-specific transcription factor Pit-1 (also known as GHF-1) was initially identified and cloned as a transactivator of the GH and PRL genes, and later as a reg...
Morphometry of an hexagonal pit crater in Pavonis Mons, Mars
Morphometry of an hexagonal pit crater in Pavonis Mons, Mars
<p><strong>Introduction:</strong></p> <p>Pit craters are peculiar depressions found in almost every terrestria...
Perbedaan cost-effectiveness pengangkatan drain kurang dari 3 hari dengan lebih dari 3 hari pada modified radical mastectomy
Perbedaan cost-effectiveness pengangkatan drain kurang dari 3 hari dengan lebih dari 3 hari pada modified radical mastectomy
Introduction: Modified radical mastectomy (MRM) is a therapeutic choice for operable breast cancer. The most frequent post-surgery complication is seroma formation, and this can be...
Pohjois-Ruotsin suomalaisten parissa
Pohjois-Ruotsin suomalaisten parissa
Kielenainekset(k)renkku (kieli: suomi, sivulla: 101)ahma (kieli: suomi, sivulla: 101)airokas (kieli: suomi, sivulla: 100)arina (kieli: suomi, sivulla: 101)arvaus (kieli: suomi, siv...
David Skogman Pohjois-Ruotsin suomalaisten parissa [David Skogmanin päiväkirja, muistiinpanoja kielestä, kielennäytteitä]
David Skogman Pohjois-Ruotsin suomalaisten parissa [David Skogmanin päiväkirja, muistiinpanoja kielestä, kielennäytteitä]
Kirja-arvioSkogman, David: Pohjois-Ruotsin suomalaisten parissa [David Skogmanin päiväkirja, muistiinpanoja kielestä, kielennäytteitä]Kielenainekset(k)renkku (kieli: suomi, sivulla...

Back to Top