241-AY-102 Leak Detection Pit Drain Line Inspection
View through CrossRef
Abstract
On August 1,2012 a routine visual inspection showed the presence of unexpected material on the floor of the secondary liner in Tank 241-AY-102 (AY-102). In October 2012, it was determined that waste had leaked into the annulus of AY-102. As a result, an extensive review of Tank AY-102 was conducted quickly triggering increased inspection and monitoring of the tank; however, the precise cause and location of the leak could not be determined. At the same time the Tank AY-102 leak detection pit (LDP) was accumulating water through the drain system external to the secondary tank liner. Liquid collecting in the LDP is suspected to be from water intrusion and collects at a rate such that the LDP must be pumped routinely. Following a routine pumping event, elevated radiation dose rates were noted on the transfer hose and surface contamination readings were found on the transfer pump when it was removed from the Tank AY-102 LDP. These two field readings suggested that tank waste from a secondary liner breach could be leaking into the LDP.
Therefore, a plan was initiated to ascertain the integrity of the secondary tank liner including a robotic inspection of the LDP. This paper provides a description of the design components, operational approach, and those results gained from the Tank AY-102 LDP drain piping visual inspection. To perform this inspection, a custom robotic crawler with a deployment device was designed, built, and operated, through subcontract, to inspect the 6 in (152.4mm) leak detection pit drain line. These tasks were accomplished, from initial award of the contract to completion of the inspection, in about two months.
Title: 241-AY-102 Leak Detection Pit Drain Line Inspection
Description:
Abstract
On August 1,2012 a routine visual inspection showed the presence of unexpected material on the floor of the secondary liner in Tank 241-AY-102 (AY-102).
In October 2012, it was determined that waste had leaked into the annulus of AY-102.
As a result, an extensive review of Tank AY-102 was conducted quickly triggering increased inspection and monitoring of the tank; however, the precise cause and location of the leak could not be determined.
At the same time the Tank AY-102 leak detection pit (LDP) was accumulating water through the drain system external to the secondary tank liner.
Liquid collecting in the LDP is suspected to be from water intrusion and collects at a rate such that the LDP must be pumped routinely.
Following a routine pumping event, elevated radiation dose rates were noted on the transfer hose and surface contamination readings were found on the transfer pump when it was removed from the Tank AY-102 LDP.
These two field readings suggested that tank waste from a secondary liner breach could be leaking into the LDP.
Therefore, a plan was initiated to ascertain the integrity of the secondary tank liner including a robotic inspection of the LDP.
This paper provides a description of the design components, operational approach, and those results gained from the Tank AY-102 LDP drain piping visual inspection.
To perform this inspection, a custom robotic crawler with a deployment device was designed, built, and operated, through subcontract, to inspect the 6 in (152.
4mm) leak detection pit drain line.
These tasks were accomplished, from initial award of the contract to completion of the inspection, in about two months.
Related Results
Morphometry of an hexagonal pit crater in Pavonis Mons, Mars
Morphometry of an hexagonal pit crater in Pavonis Mons, Mars
<p><strong>Introduction:</strong></p>
<p>Pit craters are peculiar depressions found in almost every terrestria...
Perbedaan cost-effectiveness pengangkatan drain kurang dari 3 hari dengan lebih dari 3 hari pada modified radical mastectomy
Perbedaan cost-effectiveness pengangkatan drain kurang dari 3 hari dengan lebih dari 3 hari pada modified radical mastectomy
Introduction: Modified radical mastectomy (MRM) is a therapeutic choice for operable breast cancer. The most frequent post-surgery complication is seroma formation, and this can be...
Deformation Behavior of Deep Foundation Pit under Both Overloading and Unloading Conditions
Deformation Behavior of Deep Foundation Pit under Both Overloading and Unloading Conditions
A deep foundation pit in a station of the Hangzhou subway is adjacent to new high-rise residential buildings on the north side and to the Evergrande foundation pit being excavated ...
Eyes on Air
Eyes on Air
Abstract
We at ADNOC Logistics & Services have identified the need for a Fully Integrated Inspection and Monitoring Solution to meet our operational, safety and ...
Using Platelet Technology To Seal and Locate Leaks in Subsea Umbilical Lines
Using Platelet Technology To Seal and Locate Leaks in Subsea Umbilical Lines
Abstract
Platelet Technology is a new and novel method of sealing and locating leaks in pressurised pipelines. It is based on the remote injection of discrete par...
El Niño-Southern Oscillation (ENSO) controls on mean streamflow and streamflow variability in Central Chile
El Niño-Southern Oscillation (ENSO) controls on mean streamflow and streamflow variability in Central Chile
<p>Understanding hydrological extremes is becoming increasingly important for future adaptation strategies to global warming. Hydrologic extremes affect food security...
OUTCOME OF LAPAROSCOPIC CHOLECYSTECTOMY WITH &WITHOUT DRAIN
OUTCOME OF LAPAROSCOPIC CHOLECYSTECTOMY WITH &WITHOUT DRAIN
BACKGROUND: Cholecystitis is common health problem and laparoscopic approach to gallstonedisease is procedure of choice. Intra abdominal drain is used to pervert post operative sub...
Risk Factors for Gastrointestinal Leak after Perforated Peptic Ulcer Disease Operative Repair
Risk Factors for Gastrointestinal Leak after Perforated Peptic Ulcer Disease Operative Repair
Background There are limited studies regarding the impact of post-operative leak on perforated peptic ulcer disease (PPUD) and conflicting results regarding routine drain placement...