Delivering Best-In-Class Shallow Water Tender-Assisted Drilling Wellhead Platform, a New Chapter
View through CrossRef
Abstract
This paper demonstrates another success story on delivering a new Best-In-Class Tendered Assisted Drilling (TAD) Wellhead Platform. A clear target/goal to achieve project value driver, ie. reduce CAPEX and accelerate project maturation speed. With demonstration of good front-end development work and project delivery strategies set from the beginning of the project, a series of strategic approach to deliver competitive scoping and requirement with the intent of achieving cost saving and minimize fabrication duration by meeting targeted weight reduction for both Topside and Substructures.
The ultimate purpose of all these strategic approaches is to develop a set of standard template design and efficient project execution strategy for new TAD Wellhead platform that is replicable in Shell.
Civil, Structural and Offshore Engineering discipline in Shell has leveraging past project good practices, lesson learnt and benchmarking against internal and external project to develop a fit-for-purpose design. Initial findings from the benchmarking study indicated at water depth of 143m in Sarawak water, jackets are launch-installed, typically.
The continuous improvement exercises aimed to reduce both Topsides and Substructure weight, which eventually creates opportunity for jacket to convert from launch-installed in the initially concept to lift-installed jacket. Some of key successes from this improvement journey includes topside deck level/footprint optimization, optimized topside structural framing and deck leg spacing to have a small work-points from top, elimination of jacket dummy leg thus reduce overall jacket footprint/weight, lean foundation design, e.g. 1 skirt pile per leg etc.
However, the key challenge to the lift-installed jacket concept at the water region of 140m remains at jacket lift weight that is limited by the typical heavy lift vessel crane capacity and it requires a stringent weather window limit. Hence, weight management, i.e. set NTE weight on the jacket lift weight is paramount and it needs to be managed from engineering phase all the way to offshore installation.
The outcome of the continuous improvement journey showed tremendous satisfying result to save project cost and schedule. With massive reduction of jacket weight (>50%) thus it reduces fabrication schedule, and unlocks provision of yard flexibility that invites more competitive bidding from EPC contractors (especially small fabricator) thus potentially reduce overall EPC cost. The significant improvement in steel quantity reducing overall jacket steel material procurement cost and fabrication cost.
Elimination of jacket loadout via skidding facility (for launch type jacket) that further reduces fabrication cost.
This is the first lift-installed jacket in Shell Malaysia at this water region. Leveraging on project knowledge and learning, specific technical specifications for L2 TAD Wellhead Platform design and installation aids have been developed in shell, with the intent to standardize and simplify technical requirements.
Title: Delivering Best-In-Class Shallow Water Tender-Assisted Drilling Wellhead Platform, a New Chapter
Description:
Abstract
This paper demonstrates another success story on delivering a new Best-In-Class Tendered Assisted Drilling (TAD) Wellhead Platform.
A clear target/goal to achieve project value driver, ie.
reduce CAPEX and accelerate project maturation speed.
With demonstration of good front-end development work and project delivery strategies set from the beginning of the project, a series of strategic approach to deliver competitive scoping and requirement with the intent of achieving cost saving and minimize fabrication duration by meeting targeted weight reduction for both Topside and Substructures.
The ultimate purpose of all these strategic approaches is to develop a set of standard template design and efficient project execution strategy for new TAD Wellhead platform that is replicable in Shell.
Civil, Structural and Offshore Engineering discipline in Shell has leveraging past project good practices, lesson learnt and benchmarking against internal and external project to develop a fit-for-purpose design.
Initial findings from the benchmarking study indicated at water depth of 143m in Sarawak water, jackets are launch-installed, typically.
The continuous improvement exercises aimed to reduce both Topsides and Substructure weight, which eventually creates opportunity for jacket to convert from launch-installed in the initially concept to lift-installed jacket.
Some of key successes from this improvement journey includes topside deck level/footprint optimization, optimized topside structural framing and deck leg spacing to have a small work-points from top, elimination of jacket dummy leg thus reduce overall jacket footprint/weight, lean foundation design, e.
g.
1 skirt pile per leg etc.
However, the key challenge to the lift-installed jacket concept at the water region of 140m remains at jacket lift weight that is limited by the typical heavy lift vessel crane capacity and it requires a stringent weather window limit.
Hence, weight management, i.
e.
set NTE weight on the jacket lift weight is paramount and it needs to be managed from engineering phase all the way to offshore installation.
The outcome of the continuous improvement journey showed tremendous satisfying result to save project cost and schedule.
With massive reduction of jacket weight (>50%) thus it reduces fabrication schedule, and unlocks provision of yard flexibility that invites more competitive bidding from EPC contractors (especially small fabricator) thus potentially reduce overall EPC cost.
The significant improvement in steel quantity reducing overall jacket steel material procurement cost and fabrication cost.
Elimination of jacket loadout via skidding facility (for launch type jacket) that further reduces fabrication cost.
This is the first lift-installed jacket in Shell Malaysia at this water region.
Leveraging on project knowledge and learning, specific technical specifications for L2 TAD Wellhead Platform design and installation aids have been developed in shell, with the intent to standardize and simplify technical requirements.
Related Results
Relationship Domain of Form Six Teachers Thinking in Teaching with External Factors of Form Six Teachers
Relationship Domain of Form Six Teachers Thinking in Teaching with External Factors of Form Six Teachers
<!--[if gte mso 9]><xml> <o:OfficeDocumentSettings> <o:RelyOnVML /> <o:AllowPNG /> </o:OfficeDocumentSettings> </xml><![endif]--> &l...
Modified Offshore Drilling Operation - Serban Well (Nunukan Block)
Modified Offshore Drilling Operation - Serban Well (Nunukan Block)
Abstract
Serban is an offshore drilling project located in Nunukan Block, Indonesia, approximately 3 km northwest of Bunyu Island, an offshore area with very shal...
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
The coupling effects between MODU and slim drilling riser are of primary importance in analysis of dynamic response of drilling riser system. However,, the effect of MODU on drilli...
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Experimental Investigation of Permeability and Fluid Loss Properties of Water Based Mud Under High Pressure-High Temperature Conditions
Drilling in deeper formations and in high pressure and high temperature (HPHT) environments is a new frontier for the oil industry. Fifty years ago, no one would have imagined dril...
SPECIFICATION FOR TESTING AUTOMOTIVE MINIATURE BULBS
SPECIFICATION FOR TESTING AUTOMOTIVE MINIATURE BULBS
<div class="section abstract">
<div class="htmlview paragraph">The procedures contained in this specification cover the laboratory testing of miniature incandescent b...
Mitigating Wellhead Fatigue While Reducing HSE Risk, Deck Spread, Deployment Time, and Crew Size
Mitigating Wellhead Fatigue While Reducing HSE Risk, Deck Spread, Deployment Time, and Crew Size
Abstract
Subsea wellhead systems have a design fatigue life that is expected to withstand the damage incurred from stress caused by cyclic loading during its operati...
Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract
Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...