The Troll Environment

View through CrossRef
Abstract Troll Oil comprises of an extensive subsea production system and two floating production units, Troll B and Troll C. Due to high water production there has been a continuous focus on optimal water treatment, starting with the design of the topside facilities on both platforms, and continuing through operational improvements and modifications. This has resulted in a yearly average oil-in-water concentration of about 10 ppm, well below the current regulation of 40 ppm. The authorities have introduced a requirement of "zero discharge" to sea within 2005. To accomplish this, a project was initiated which consists of a broad variety of activities including offshore testing of technologies capable of removing components dissolved in the water. This paper presents the measures taken to reduce the oil content in the discharged water, through original design, operational experiences and modifications, introduction of new technology and the ongoing project to further reduce harmful discharges to sea towards "zero discharge". Introduction The Troll Oil development in the North Sea comprises more than 100 horizontal wells tied into 27 subsea templates, each with two common production flowlines to a floating production unit, either Troll B or Troll C. After topside treatment oil and gas is transported in pipelines to facilities onshore while produced water is discharged to sea. Figure 1 shows an illustration of the Troll Oil development. The oil column in the reservoir is thin, only 4-27 m1, and the production mechanism is a combination of natural gas cap expansion and water drive. Optimal oil production is obtained by extending the wells horizontally along the oil-water contact. Thus the water production from the field is very large and has predominantly varied between 20.000-40.000 m3/day per platform since start up. Figure 1. The Troll Oil development. (Available in full paper) This paper presents the measures taken to reduce the oil content in the discharged water on Troll B and C. Topics to be highlighted are briefly introduced below. When developing the field there was great effort put into the design of the oil separation trains and the produced water treatment systems on both platforms. Experience from start up of Troll B was implemented into the design of Troll C. In the Troll C project a subsea separator was developed to reduce the produce water discharge to sea and to prove that subsea separation of water from the well stream is feasible. Since start up, the oil content in the discharged water has been reduced significantly, and the yearly average is now approx. 10 ppm, well below the present regulation requirement of 40 ppm. This successful approach has been reached by operational improvements and modifications, and the willingness to develop and implement new technology together with suppliers. A tool to quantify the environmental impact of the water discharged to sea, the Environmental Impact Factor (EIF), has been developed by the operators2. The EIF tool shows that both the oil dispersed in the water, which is under current regulation, and components that partly are dissolved in the water phase contributes to the environmental impact.
Title: The Troll Environment
Description:
Abstract Troll Oil comprises of an extensive subsea production system and two floating production units, Troll B and Troll C.
Due to high water production there has been a continuous focus on optimal water treatment, starting with the design of the topside facilities on both platforms, and continuing through operational improvements and modifications.
This has resulted in a yearly average oil-in-water concentration of about 10 ppm, well below the current regulation of 40 ppm.
The authorities have introduced a requirement of "zero discharge" to sea within 2005.
To accomplish this, a project was initiated which consists of a broad variety of activities including offshore testing of technologies capable of removing components dissolved in the water.
This paper presents the measures taken to reduce the oil content in the discharged water, through original design, operational experiences and modifications, introduction of new technology and the ongoing project to further reduce harmful discharges to sea towards "zero discharge".
Introduction The Troll Oil development in the North Sea comprises more than 100 horizontal wells tied into 27 subsea templates, each with two common production flowlines to a floating production unit, either Troll B or Troll C.
After topside treatment oil and gas is transported in pipelines to facilities onshore while produced water is discharged to sea.
Figure 1 shows an illustration of the Troll Oil development.
The oil column in the reservoir is thin, only 4-27 m1, and the production mechanism is a combination of natural gas cap expansion and water drive.
Optimal oil production is obtained by extending the wells horizontally along the oil-water contact.
Thus the water production from the field is very large and has predominantly varied between 20.
000-40.
000 m3/day per platform since start up.
Figure 1.
The Troll Oil development.
(Available in full paper) This paper presents the measures taken to reduce the oil content in the discharged water on Troll B and C.
Topics to be highlighted are briefly introduced below.
When developing the field there was great effort put into the design of the oil separation trains and the produced water treatment systems on both platforms.
Experience from start up of Troll B was implemented into the design of Troll C.
In the Troll C project a subsea separator was developed to reduce the produce water discharge to sea and to prove that subsea separation of water from the well stream is feasible.
Since start up, the oil content in the discharged water has been reduced significantly, and the yearly average is now approx.
10 ppm, well below the present regulation requirement of 40 ppm.
This successful approach has been reached by operational improvements and modifications, and the willingness to develop and implement new technology together with suppliers.
A tool to quantify the environmental impact of the water discharged to sea, the Environmental Impact Factor (EIF), has been developed by the operators2.
The EIF tool shows that both the oil dispersed in the water, which is under current regulation, and components that partly are dissolved in the water phase contributes to the environmental impact.

Related Results

Handling The Oil Zone On Troll
Handling The Oil Zone On Troll
Abstract The Troll field is a giant gas field but below the gas cap 4 billion barrels of oil are located in an oil layer varying from 4–27m and covering an area o...
The Troll Olje Platform
The Troll Olje Platform
ABSTRACT The Detail Engineering of the Troll Olje Platform commenced in May 1992 with the objective of developing an optimum platform solution both economically a...
Troll Oil Development Concept
Troll Oil Development Concept
ABSTRACT Underneath the large gas accumulation of the Troll field lies a considerable volume of oil. However, its development requires an innovative approach beca...
Troll Oseberg Gas Injection (TOGI) Development
Troll Oseberg Gas Injection (TOGI) Development
ABSTRACT In 1986 the Oseberg partners decided to replace the planned water injection scheme by gas injection. Pressure maintenance by gas of the...
Subsea Separation and Reinjection of Produced Water
Subsea Separation and Reinjection of Produced Water
Abstract Some of the most significant recent development in subsea design has been within subsea processing, in particular the removal of produced water from the ...
Installation of the Troll Phase I Gravity Base Platform
Installation of the Troll Phase I Gravity Base Platform
Abstract The TROLL Phase 1concrete Gravity Base Platform is located in 303 m of water in the Norwegian Trench some 80 kilometers northwest of Bergen. The platform...
Analysis Of Dynamic Transient Response (Ringing) In A Gravity-Base Structure
Analysis Of Dynamic Transient Response (Ringing) In A Gravity-Base Structure
ABSTRACT Troll Gravity Base Structure (GBS)will be located in about 300m water depth and Will be the tallest GBS when installed in 1995. The natural periods of th...
Troll Pilot Control System: Advanced Control System for a Subsea Separator
Troll Pilot Control System: Advanced Control System for a Subsea Separator
ABSTRACT This paper describes the design of a subsea control system for control and monitoring of a subsea water separator, for use by Norsk Hydro in the Troll fi...

Back to Top