Subway construction is a high-risk construction project, because there are many uncertain factors such as Undercrossing urban hinterland and geological conditions, which lead to the difficulty of organization and management and frequent safety accidents. Therefore, there is an urgent need for effective safety risk analysis model and risk management means to prevent accidents. Aiming at the mechanical problems of surrounding rock and supporting structure of subway tunnel under different construction methods, the dynamic numerical simulation of three pilot tunnel method and upper and lower step method is carried out by using finite element method. The transformation relationship between stress field and displacement field of subway tunnel under different construction procedures is established, and the two construction methods are compared. The test results show that the internal force, axial force and bending moment model of the subway tunnel support structure system established in this paper has a certain guiding significance for the design and safe construction of the subway tunnel.
Auricle Technologies, Pvt., Ltd.
Title: Difficulties in the Construction of Subway Tunnel Underpass Project and Research on Ecological Restoration Technology
Description:
Subway construction is a high-risk construction project, because there are many uncertain factors such as Undercrossing urban hinterland and geological conditions, which lead to the difficulty of organization and management and frequent safety accidents.
Therefore, there is an urgent need for effective safety risk analysis model and risk management means to prevent accidents.
Aiming at the mechanical problems of surrounding rock and supporting structure of subway tunnel under different construction methods, the dynamic numerical simulation of three pilot tunnel method and upper and lower step method is carried out by using finite element method.
The transformation relationship between stress field and displacement field of subway tunnel under different construction procedures is established, and the two construction methods are compared.
The test results show that the internal force, axial force and bending moment model of the subway tunnel support structure system established in this paper has a certain guiding significance for the design and safe construction of the subway tunnel.
Related Results
Impact of subway shield tunnel construction on deformation of existing utility tunnel
Impact of subway shield tunnel construction on deformation of existing utility tunnel
In recent years, the development of urban underground space in China, especially the construction and operation of subway tunnels, has greatly relieved the pressure of urban traffi...
Realization and Prediction of Ecological Restoration Potential of Vegetation in Karst Areas
Realization and Prediction of Ecological Restoration Potential of Vegetation in Karst Areas
Based on the vegetation ecological quality index retrieved by satellite remote sensing in the karst areas of Guangxi in 2000–2019, the status of the ecological restoration of the v...
Track vibration sequence anomaly detection algorithm based on LSTM
Track vibration sequence anomaly detection algorithm based on LSTM
Subway structure monitoring obtains structure monitoring data in real time, and the obtained subway track vibration sequence exhibits obvious time series characteristics. Therefore...
Influence of Lower Double-Track Tunnel Spacing on the Stress and Deformation Characteristics of Upper Tunnel in Double-Level Condominium Tunnels
Influence of Lower Double-Track Tunnel Spacing on the Stress and Deformation Characteristics of Upper Tunnel in Double-Level Condominium Tunnels
The open-cut tunnels in Aixi Lake, Nanchang, are constructed in a condominium form of highway tunnel and subway tunnel, which are the first superimposed double-level tunnels in Chi...
Impact Analysis of Condongcatur Underpass Development Plan with Macro Traffic Simulation PTV VISUM on Road Network Performance
Impact Analysis of Condongcatur Underpass Development Plan with Macro Traffic Simulation PTV VISUM on Road Network Performance
It is planned to build an Underpass for the Condongcatur intersection to improve traffic performance and overcome the congestion that occurs. The purpose of this research is to ana...
Structural response of precast concrete segmental tunnel linings
Structural response of precast concrete segmental tunnel linings
The increasing use of the tunnel boring machines (TBMs) has entailed their own evolution and the improvement of the construction processes applied, allowing the construction of tun...
Static and dynamic analysis the influence of underlying tunnel construction on surrounding rock of existing tunnel-type anchorages
Static and dynamic analysis the influence of underlying tunnel construction on surrounding rock of existing tunnel-type anchorages
Abstract
Due to the constraints of construction period and site conditions, it is necessary to study the influence of construction of underlying tunnel on the surrou...
Deformation and Failure Mode Analysis of the Tunnel Structure Based on the Tunnel-Related Landslides Cases
Deformation and Failure Mode Analysis of the Tunnel Structure Based on the Tunnel-Related Landslides Cases
When the tunnel passes through the slope area, once the slope stability changes or landslide disasters occur, large additional stress, deformation, or cracking are easily caused in...