Impact Analysis of Condongcatur Underpass Development Plan with Macro Traffic Simulation PTV VISUM on Road Network Performance
View through CrossRef
It is planned to build an Underpass for the Condongcatur intersection to improve traffic performance and overcome the congestion that occurs. The purpose of this research is to analyze the existing traffic performance around the Condongcatur Underpass construction area, predict the impact caused, and formulate efforts to handle traffic impacts and analyze how effective the construction of the Condongcatur Underpass is in overcoming congestion that occurs. This research uses a transportation model approach to analyze the road network using PTV VISUM software. The results of the research on existing conditions show the performance of the affected road network with a v/c ratio value between 0.21 - 1, 23 (Level of service B - F). At the time of construction there were 12 road sections most affected by the Condongcatur Underpass construction plan, where the road section with the highest percentage increase occurred on the Padjajaran road section by 167% which was originally in service category C to F. In operational conditions, the Padjajaran Road section with the Underpass is in the B and C service level categories. The performance results on the affected road network provide better results with the Underpass compared to the existing conditions.
Universitas Negeri Yogyakarta
Title: Impact Analysis of Condongcatur Underpass Development Plan with Macro Traffic Simulation PTV VISUM on Road Network Performance
Description:
It is planned to build an Underpass for the Condongcatur intersection to improve traffic performance and overcome the congestion that occurs.
The purpose of this research is to analyze the existing traffic performance around the Condongcatur Underpass construction area, predict the impact caused, and formulate efforts to handle traffic impacts and analyze how effective the construction of the Condongcatur Underpass is in overcoming congestion that occurs.
This research uses a transportation model approach to analyze the road network using PTV VISUM software.
The results of the research on existing conditions show the performance of the affected road network with a v/c ratio value between 0.
21 - 1, 23 (Level of service B - F).
At the time of construction there were 12 road sections most affected by the Condongcatur Underpass construction plan, where the road section with the highest percentage increase occurred on the Padjajaran road section by 167% which was originally in service category C to F.
In operational conditions, the Padjajaran Road section with the Underpass is in the B and C service level categories.
The performance results on the affected road network provide better results with the Underpass compared to the existing conditions.
Related Results
Traffic safety outcomes of traffic law application and the adoption of new technology in traffic control
Traffic safety outcomes of traffic law application and the adoption of new technology in traffic control
Experience of the State of Qatar
Introduction:
Since the second half of the last decade of the twentieth century, Qatar has witnessed the
implementation of a comprehensive developm...
SU‐E‐T‐78: A Study of Dose Falloff Gradient in RapidArc Planning of Lung SBRT
SU‐E‐T‐78: A Study of Dose Falloff Gradient in RapidArc Planning of Lung SBRT
Purpose:Rapid dose falloff beyond PTV is an important criterion for normal tissue sparing in SBRT. RTOG protocols use D2cm and R50% for plan quality evaluation. This study is aimed...
Risk Assessment of Bridges and Analysis of Road Traffic Scenarios through Traffic Simulation
Risk Assessment of Bridges and Analysis of Road Traffic Scenarios through Traffic Simulation
This study focuses on bridge risk assessment and the analysis of alternative road network scenarios by using traffic simulation methods. The primary objective of the research is to...
Effectiveness of robust optimization in intensity‐modulated proton therapy planning for head and neck cancers
Effectiveness of robust optimization in intensity‐modulated proton therapy planning for head and neck cancers
Purpose:Intensity‐modulated proton therapy (IMPT) is highly sensitive to uncertainties in beam range and patient setup. Conventionally, these uncertainties are dealt using geometri...
Analysis of signalized intersection performance using IHCM 1997 method and PTV Vistro software
Analysis of signalized intersection performance using IHCM 1997 method and PTV Vistro software
Brigjend Slamet Riyadi road is the main city road serving the traffic of Surakarta City. It is located in the Central Business District so that many vehicles pass through this road...
Is road traffic an important driver of global insect decline?
Is road traffic an important driver of global insect decline?
Insect populations have declined dramatically over recent decades, yet the relative importance of the underlying drivers remains poorly understood. These declines are commonly attr...
Smart Traffic Control Using Computer Vision
Smart Traffic Control Using Computer Vision
A Smart Traffic Control System using Computer Vision utilizes cameras, image processing techniques, and machine learning algorithms to monitor, analyze, and manage traffic flow aut...
Performance analysis of Patal – Pusri Intersection after underpass operated
Performance analysis of Patal – Pusri Intersection after underpass operated
Abstract
The high level of population growth can have an impact on increasing traffic growth, especially at intersection points. One of the intersections in Palemban...