Javascript must be enabled to continue!
Analisis Sistem Instalasi Listrik Pada Menara Transmisi Telekomunikasi di Kota Makassar
View through CrossRef
This research is a quantitative study using survey methods aimed at determining the viability of electrical installations on telecommunications transmission towers. The research was conducted at UPD007 Telkomas, Makassar City, South Sulawesi Province. The variables in this study are the security of electrical installations, transmitters of electric installations and grounding of electricity installations. Data collection techniques are observation, documentation, interview and measurement techniques. Data analysis techniques used are descriptive data analysis using Persyaratan Umum Instalasi Listrik (PUIL) 2011. The results of the research show that the use of the security of the electrical installation at each point is said to be appropriate based on its type and capacity. The transmitter of the electrical installation used in its entirety is said to be valid based on the peripheral area, whereas the color of the transmitter indicates only the entire neutral transmitter, grounded transmitter and DC transmitter conforming to the standard using Persyaratan Umum Instalasi Listrik (PUIL) 2011. The grounding resistance obtained on each protection is fully said to be eligible under the provisions of Persyaratan Umum Instalasi Listrik (PUIL) 2011.
Title: Analisis Sistem Instalasi Listrik Pada Menara Transmisi Telekomunikasi di Kota Makassar
Description:
This research is a quantitative study using survey methods aimed at determining the viability of electrical installations on telecommunications transmission towers.
The research was conducted at UPD007 Telkomas, Makassar City, South Sulawesi Province.
The variables in this study are the security of electrical installations, transmitters of electric installations and grounding of electricity installations.
Data collection techniques are observation, documentation, interview and measurement techniques.
Data analysis techniques used are descriptive data analysis using Persyaratan Umum Instalasi Listrik (PUIL) 2011.
The results of the research show that the use of the security of the electrical installation at each point is said to be appropriate based on its type and capacity.
The transmitter of the electrical installation used in its entirety is said to be valid based on the peripheral area, whereas the color of the transmitter indicates only the entire neutral transmitter, grounded transmitter and DC transmitter conforming to the standard using Persyaratan Umum Instalasi Listrik (PUIL) 2011.
The grounding resistance obtained on each protection is fully said to be eligible under the provisions of Persyaratan Umum Instalasi Listrik (PUIL) 2011.
Related Results
EVALUASI SISTEM INSTALASI LISTRIK PADA MENARA TRANSMISI TELEKOMUNIKASI DI SITE UPD007 TELKOMAS KOTA MAKASSAR
EVALUASI SISTEM INSTALASI LISTRIK PADA MENARA TRANSMISI TELEKOMUNIKASI DI SITE UPD007 TELKOMAS KOTA MAKASSAR
Penelitian ini adalah penelitian kuantitatif dengan menggunakan metode survey yang bertujuan untuk mengetahui tingkat kelayakan instalasi listrik pada menara trasmisi telekomunikas...
Pelatihan Dasar Instalasi Listrik 1Ø Bagi Warga RW 20, Jaten , Kabupaten Karanganyar
Pelatihan Dasar Instalasi Listrik 1Ø Bagi Warga RW 20, Jaten , Kabupaten Karanganyar
Warga RW XX, perumahan JOSROYO, desa JATEN, kecamatan JATEN , KABUPATEN KARANGANYAR sangat awam sekali terhadap instalasi listrik 1phasa. Kendala yang terjadi bagi masyarakat be...
Pemasangan Solar Panel Untuk Sistem Charging Power Station di Kawasan Ekowisata Gunung Kuta, Kabupaten Bogor
Pemasangan Solar Panel Untuk Sistem Charging Power Station di Kawasan Ekowisata Gunung Kuta, Kabupaten Bogor
Pemasangan panel surya untuk perolehan daya listrik melalui pelaksanaan kegiatan Kuliah Kerja Nyata (KKN) merupakan bentuk sebuah upaya untuk pengusahaan sumber daya listrik. Keber...
Penerapan Semi-Immersion Virtual Reality Untuk Simulasi Instalasi Transmisi Listrik
Penerapan Semi-Immersion Virtual Reality Untuk Simulasi Instalasi Transmisi Listrik
Peningkatan penggunaan listrik setiap tahun selalu terjadi, begitu pula dengan peningkatan pembangunan gardu induk dan gardu distribusi sebagai sarana transmisi listrik PLN. Proses...
EVALUASI INSTALASI LISTRIK PADA RUMAH SAKIT BERDASARKAN PUIL 2011
EVALUASI INSTALASI LISTRIK PADA RUMAH SAKIT BERDASARKAN PUIL 2011
Abstract
The purpose of this research is to know the confirmity about electricity installation which installed at a private hospital in East Jakarta with the standard of PUIL...
PENYULUHAN INSTALASI LISTRIK YANG AMAN DAN HANDAL UNTUK PERUMAHAN
PENYULUHAN INSTALASI LISTRIK YANG AMAN DAN HANDAL UNTUK PERUMAHAN
Kebutuhan akan Energi Listrik pada era sekarang ini sudah merupakan kebutuhan yang sangat vital, Kebutuhan akan enegi listrik menyebar hampir keseluruh keperluan hidup manusia, mak...
Edukasi Instalasi Listrik Dan PLTS Bagi Pemuda Pemuda Putus Sekolah Untuk Meningkatkan Keterampilan Bekerja Di Desa Padang Sakti
Edukasi Instalasi Listrik Dan PLTS Bagi Pemuda Pemuda Putus Sekolah Untuk Meningkatkan Keterampilan Bekerja Di Desa Padang Sakti
Latar Belakang: Dengan pertumbuhan pendudukan semakin cepat dan pendidikan yang tidak memadai dan tidak terarah bagi masyarakat sehingga masyarakat tidak dapat menguasai kemajuan t...
EFEKTIFITAS PEMAHAMAN MAHASISWA TENTANG RANGKAIAN INSTALASI LISTRIK DENGAN METODE PEMBELAJARAN BERBASIS PROJECT
EFEKTIFITAS PEMAHAMAN MAHASISWA TENTANG RANGKAIAN INSTALASI LISTRIK DENGAN METODE PEMBELAJARAN BERBASIS PROJECT
Latar Belakang : Latar belakang penelitian ini Kehidupan dizaman sekarang sudah sangat bergantung pada energi listrik Pendistribusian listrik ke rumah[1]rumah masyarakat ,perkantor...

