Deepwater Pipelines: East Break Area, Offshore Texas
View through CrossRef
ABSTRACT
Union Oil Company of California recently installed 27 miles of deepwater pipelines in the East Breaks Area, Offshore, Texas. The 6", 8" and 10" pipelines were laid in water depths of 200–1000 ft. These lines are a combination of rigid and flexible pipe and will transport crude oil and natural gas. This paper provides an overview of the project with discussion on the feasibility study, engineering and design, installation and support equipment, and the procedures implemented.
INTRODUCTION
Union Oil Company of California and its co-owners, Amoco Production Company and Mobil Producing Texas and New Mexico, became involved in the East Breaks Area with the acquisition of federal leases in 1974. The four blocks are located about 100 miles south of Galveston, Texas (Figure 1). Exploratory drilling began in 1975 and by 1978 several wells proved adequate reserves to justify the high cost of field development.
Construction of the first platform, Cerveza, began in the fall of 1979. The single piece jacket was installed in East Breaks Block 160 in the summer of 1981 in 935 ft. of water. In 1982, the second platform needed for field developement, Cerveza Ligera, was installed in East Breaks Block 159 in 925 ft. of water.
The results of initial well completions warranted full gas and oil processing on both platforms. Production estimates for the field are 100 MMCFD of gas and 12000 BPD of oil. Plans were made for a crude oil pipeline to be laid into the High Island Area to connect with an existing line. Plans for a gas sales pipeline are still pending. Infield flowlines between the two platforms were required to transport oil and gas to the departing sales pipelines.
Drilling and production schedules for the field warranted installation of three pipelines during the same time period. Initial plans and cost estimates called for a total of 27 miles of 6", 8", and 10" pipe to be laid for approximately $25.5 million.
TASKS AND ENGINEERING
The first phase of pipeline installations in the East Breaks Field involved a means of transporting the crude oil from both platforms to an existing platform in the High Island Area. In the arly stages of planning, a decision was made to run a 10" crude oil pipeline from East Breaks 160A platform (EB 160A) to High Island A-536C platform (HI 536C). This platform is producing oil and shipping into a 10" pipeline that is a segment of the High Island Pipeline System (HIPS)
Title: Deepwater Pipelines: East Break Area, Offshore Texas
Description:
ABSTRACT
Union Oil Company of California recently installed 27 miles of deepwater pipelines in the East Breaks Area, Offshore, Texas.
The 6", 8" and 10" pipelines were laid in water depths of 200–1000 ft.
These lines are a combination of rigid and flexible pipe and will transport crude oil and natural gas.
This paper provides an overview of the project with discussion on the feasibility study, engineering and design, installation and support equipment, and the procedures implemented.
INTRODUCTION
Union Oil Company of California and its co-owners, Amoco Production Company and Mobil Producing Texas and New Mexico, became involved in the East Breaks Area with the acquisition of federal leases in 1974.
The four blocks are located about 100 miles south of Galveston, Texas (Figure 1).
Exploratory drilling began in 1975 and by 1978 several wells proved adequate reserves to justify the high cost of field development.
Construction of the first platform, Cerveza, began in the fall of 1979.
The single piece jacket was installed in East Breaks Block 160 in the summer of 1981 in 935 ft.
of water.
In 1982, the second platform needed for field developement, Cerveza Ligera, was installed in East Breaks Block 159 in 925 ft.
of water.
The results of initial well completions warranted full gas and oil processing on both platforms.
Production estimates for the field are 100 MMCFD of gas and 12000 BPD of oil.
Plans were made for a crude oil pipeline to be laid into the High Island Area to connect with an existing line.
Plans for a gas sales pipeline are still pending.
Infield flowlines between the two platforms were required to transport oil and gas to the departing sales pipelines.
Drilling and production schedules for the field warranted installation of three pipelines during the same time period.
Initial plans and cost estimates called for a total of 27 miles of 6", 8", and 10" pipe to be laid for approximately $25.
5 million.
TASKS AND ENGINEERING
The first phase of pipeline installations in the East Breaks Field involved a means of transporting the crude oil from both platforms to an existing platform in the High Island Area.
In the arly stages of planning, a decision was made to run a 10" crude oil pipeline from East Breaks 160A platform (EB 160A) to High Island A-536C platform (HI 536C).
This platform is producing oil and shipping into a 10" pipeline that is a segment of the High Island Pipeline System (HIPS).
Related Results
Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
Abstract
This paper describes the most important features required for installing deepwater pipelines, pipelines with in-line sled assemblies, PLETs, and SCRs. Th...
Performance Limits for Deepwater Pipelines
Performance Limits for Deepwater Pipelines
ABSTRACT
This paper highlights the differences between onshore and offshore pipeline design. It then summarizes the results of combined external pressure, tension...
New Directions in TLP Technology
New Directions in TLP Technology
Abstract
Of the many deepwater platform concepts that were developed as deepwater platform technology matured, the TLP has been the most frequently selected for d...
Buckle Arrestors for Deepwater Pipelines
Buckle Arrestors for Deepwater Pipelines
Abstract
Progress has been made in the design of buckle arrestors, or more precisely collapse arrestors, for deepwater pipelines. Empirical relationships have bee...
Alternative Offshore Foundation Installation Methods
Alternative Offshore Foundation Installation Methods
Abstract
According to the European Wind Energy Association (EWEA) in the first six months of 2012, Europe installed and fully grid connected 132 offshore wind tur...
Morpeth SeaStar Mini-TLP
Morpeth SeaStar Mini-TLP
Abstract
The Morpeth project is the world's first application of a SeaStar®1 Mini-TLP and establishes that mono-column TLP's can be used to economically develop d...
Pigging Previously Unpiggable Pipelines
Pigging Previously Unpiggable Pipelines
Abstract
The efficient and safe transportation of fluids through pipelines has been a cornerstone of modern infrastructure for decades. However, pipeline operators o...
Morpeth Field Development Overview
Morpeth Field Development Overview
Abstract
The Morpeth Field is located in the Ewing Bank area of the Gulf of Mexico in 1,670 feet of water. British-Borneo acquired the field in 1995 from Shell Of...