Javascript must be enabled to continue!
Adjacency-Based Facility Layout Optimization for Shipyards: A Case Study
View through CrossRef
_
A shipyard located in Yalova, Turkey, with an annual processing capacity of 50,000 tons of steel, is studied to improve the layout to increase the production efficiency. The material and personnel traffic inside the shipyard is complex, considering the nature of the shipyards. Therefore, an adjacency-based optimization procedure has been adopted in this study since this procedure allows quantitative evaluation of these aspects. Systematic layout planning (SLP) and graph-theoretical approach were used to generate 12 alternative layouts. Then, the best alternative layout was selected using the efficiency rate method. This study demonstrates the use of SLP and graphic-theoretical approach in a maritime context and utilizes the efficiency rate method to compare the alternative layouts, which are between 48.91% and 73.91% efficiencies, respectively. This study is a novel contribution to the literature in terms of demonstrating this methodology for shipbuilding applications, and practical applications for the industry can improve the industry to improve the efficiency of their operations.
Introduction
In parallel with the increase in global economic growth and technological developments, new ships are needed for marine transportation, energy, security, fishing, etc. This need triggers a globally competitive environment for the production of vessels in a cheap and efficient manner, which directly affects the shipbuilding industry and shipyards (Odabasi 1993). The alignment of the production departments in the shipyard is critical for productivity. The shipyard should be optimized and designed as an efficient system to minimize unnecessary material and personnel traffic. On the other hand, the majority of shipyards are poorly designed. Facility layout deals with the placement of the production departments based on their relative relationship, and facility layout design aims to streamline the workflow and increase productivity (Muther & Hales 2015). Dixit et al. (2020) describe the facility layout as a physical arrangement of departments with a focus on workflow across the system to achieve highest operational efficiency at the lowest cost. Facilities layout is fundamental to shipyard efficiency. To address this gap in the literature, this paper examines the application of systematic layout planning (SLP) and graph-theoretical approach to the optimization of a specific facility layout.
The Society of Naval Architects and Marine Engineers
Title: Adjacency-Based Facility Layout Optimization for Shipyards: A Case Study
Description:
_
A shipyard located in Yalova, Turkey, with an annual processing capacity of 50,000 tons of steel, is studied to improve the layout to increase the production efficiency.
The material and personnel traffic inside the shipyard is complex, considering the nature of the shipyards.
Therefore, an adjacency-based optimization procedure has been adopted in this study since this procedure allows quantitative evaluation of these aspects.
Systematic layout planning (SLP) and graph-theoretical approach were used to generate 12 alternative layouts.
Then, the best alternative layout was selected using the efficiency rate method.
This study demonstrates the use of SLP and graphic-theoretical approach in a maritime context and utilizes the efficiency rate method to compare the alternative layouts, which are between 48.
91% and 73.
91% efficiencies, respectively.
This study is a novel contribution to the literature in terms of demonstrating this methodology for shipbuilding applications, and practical applications for the industry can improve the industry to improve the efficiency of their operations.
Introduction
In parallel with the increase in global economic growth and technological developments, new ships are needed for marine transportation, energy, security, fishing, etc.
This need triggers a globally competitive environment for the production of vessels in a cheap and efficient manner, which directly affects the shipbuilding industry and shipyards (Odabasi 1993).
The alignment of the production departments in the shipyard is critical for productivity.
The shipyard should be optimized and designed as an efficient system to minimize unnecessary material and personnel traffic.
On the other hand, the majority of shipyards are poorly designed.
Facility layout deals with the placement of the production departments based on their relative relationship, and facility layout design aims to streamline the workflow and increase productivity (Muther & Hales 2015).
Dixit et al.
(2020) describe the facility layout as a physical arrangement of departments with a focus on workflow across the system to achieve highest operational efficiency at the lowest cost.
Facilities layout is fundamental to shipyard efficiency.
To address this gap in the literature, this paper examines the application of systematic layout planning (SLP) and graph-theoretical approach to the optimization of a specific facility layout.
Related Results
Funkcije komunikacijski relevantne šutnje u njemačkome
Funkcije komunikacijski relevantne šutnje u njemačkome
Additionally, this chapter presents research of silence with review of main aspects of papers in the field of conversational analysis, ethnography of communication and metaphor of ...
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct
Introduction
Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Soviet Shipbuilding: Productivity improvement Efforts
Soviet Shipbuilding: Productivity improvement Efforts
Constant demand for new naval and commercial vessels has created special conditions for the Government-owned Soviet shipbuilding industry, which practically has not been affected b...
Perancangan Tata Letak Fasilitas Metode CRAFT (Computerized Relative Allocation Facility Technique)
Perancangan Tata Letak Fasilitas Metode CRAFT (Computerized Relative Allocation Facility Technique)
Abstract. The layout of production facilities is a crucial factor in supporting the smooth operation of manufacturing processes. CV. XYZ faces issues related to inefficient facilit...
Shipyards in Egypt Between Antiquity, the Present, and the Future
Shipyards in Egypt Between Antiquity, the Present, and the Future
Shipyards in Egypt played an extensive role in building the Egyptian civilization through the ages. Significant archaeological excavations at several sites in Egypt have revealed t...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract
Introduction
Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...
Optimizing Manufacturing Cycles for Advantage Production: Application in Shipyards Traditional industry
Optimizing Manufacturing Cycles for Advantage Production: Application in Shipyards Traditional industry
This article explores the important role of traditional shipyards in the global maritime industry, covering aspects of construction, repair, and maintenance. With the advent of fas...
Blocplan Algorithm for Facility Layout Design in Various Industry in Indonesia
Blocplan Algorithm for Facility Layout Design in Various Industry in Indonesia
Facility layout is an important aspect in planning and developing production facilities. A good layout can increase efficiency, productivity and safety in the production process. ...

