Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Penentuan Interval Waktu Pemeliharaan Pencegahan pada Peralatan Sub-Unit RKC 3 di PTX Pabrik Tuban

View through CrossRef
PT X Tuban Plant has four plants (unit), namely Tuban I, Tuban II, Tuban III and Tuban IV. Each unit plant has three sub units, i.e., Crusher Operations Sub-Unit, Raw Mill, Kiln and Coal Mill (RKC) Sub-Unit and Finish Mill Sub-Unit. RKC 3 Sub-Unit in Tuban III has the highest number of equipment downtime and production loss. Therefore, it was necessary to optimize the time interval of preventive maintenance ( ) and total labor force as part of the company maintenance policy, would also fulfill the required reliability and availability of RKC 3 Sub-Unit. There were two steps in determining Tp optimum. The first step was to obtain the best distribution of the time between failures (TBF) and time to repair (TTR). The next step was to iterate the operating time (Ti) and Tp to determine the minimum preventive maintenance cost rate, reliability and maintainability.This iteration was applied to sub-units of RKC 3 that possesses a series system. Tp at the lowest rate of maintenance costs was the optimum Tp. The optimum Tp for RKC 3 Sub-Unit is 3743,28 hour. The preventive maintenance cost rate for optimum Tp is Rp33.100/hour and the reliability and availability of sub unit are 96,7% and 99,86% respectively.Keywords: reliability, availability, preventive maintenance cost rate, and preventive maintenance
Title: Penentuan Interval Waktu Pemeliharaan Pencegahan pada Peralatan Sub-Unit RKC 3 di PTX Pabrik Tuban
Description:
PT X Tuban Plant has four plants (unit), namely Tuban I, Tuban II, Tuban III and Tuban IV.
Each unit plant has three sub units, i.
e.
, Crusher Operations Sub-Unit, Raw Mill, Kiln and Coal Mill (RKC) Sub-Unit and Finish Mill Sub-Unit.
RKC 3 Sub-Unit in Tuban III has the highest number of equipment downtime and production loss.
Therefore, it was necessary to optimize the time interval of preventive maintenance ( ) and total labor force as part of the company maintenance policy, would also fulfill the required reliability and availability of RKC 3 Sub-Unit.
There were two steps in determining Tp optimum.
The first step was to obtain the best distribution of the time between failures (TBF) and time to repair (TTR).
The next step was to iterate the operating time (Ti) and Tp to determine the minimum preventive maintenance cost rate, reliability and maintainability.
This iteration was applied to sub-units of RKC 3 that possesses a series system.
Tp at the lowest rate of maintenance costs was the optimum Tp.
The optimum Tp for RKC 3 Sub-Unit is 3743,28 hour.
The preventive maintenance cost rate for optimum Tp is Rp33.
100/hour and the reliability and availability of sub unit are 96,7% and 99,86% respectively.
Keywords: reliability, availability, preventive maintenance cost rate, and preventive maintenance.

Related Results

MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
Apropriasi Seni Musik Gugah Sahur: Studi Kasus Tongklek Tuban dan Tong-Tong Madura
Apropriasi Seni Musik Gugah Sahur: Studi Kasus Tongklek Tuban dan Tong-Tong Madura
ABSTRACTThe Appropriation of Gugah Sahur Musical Art: A Case Study of Tongklek Tuban and Tong-Tong Madura. This study aims to identify the interrelation between Tongklek Tuban and ...
Abstract 1773: Overcoming paclitaxel resistance in triple-negative breast cancer using a novel barcoding technology
Abstract 1773: Overcoming paclitaxel resistance in triple-negative breast cancer using a novel barcoding technology
Abstract Triple-negative breast cancer (TNBC) is an aggressive breast cancer subtype for which chemotherapy remains a part of standard treatment. Although pathologic...
Diet After Pancreas Transplantation
Diet After Pancreas Transplantation
OBJECTIVE To determine whether discontinuation of insulin therapy and glucose monitoring and instructions to increase dietary salt and water intake after pancreas...
Is the Level of Pentraxin-3 a Valid Biomarker in Axial Spondyloarthritis?
Is the Level of Pentraxin-3 a Valid Biomarker in Axial Spondyloarthritis?
Abstract Background Pentraxin-3 (PTX-3) is essential in inflammation, remodelling and regulation of inflammation in various rheumatic diseases. This s...
ILP4 and InR regulate Paclitaxel-induced hypersensitivity differently in Drosophila larvae
ILP4 and InR regulate Paclitaxel-induced hypersensitivity differently in Drosophila larvae
Abstract Paclitaxel (PTX), a chemotherapeutic that stabilizes microtubules, induces nociceptive hypersensitivity and sensory neuron damage in humans, mice, and flies. T...
Investigation of Pectenotoxin Profiles in the Yellow Sea (China) Using a Passive Sampling Technique
Investigation of Pectenotoxin Profiles in the Yellow Sea (China) Using a Passive Sampling Technique
Pectenotoxins (PTXs) are a group of lipophilic algal toxins. These toxins have been found in algae and shellfish from Japan, New Zealand, Ireland, Norway and Portugal. PTX profiles...

Back to Top