Optimasi Kinerja Belt Conveyor untuk Produksi Batugamping di PT Indocement Tunggal Prakarsa Kelurahan Citereup, Kecamatan Gunung Putri, Kabupaten Bogor, Provinsi Jawa Barat

View through CrossRef
Abstract. PT Indocement Tunggal Prakarsa is a cement industry company located in Citereup, Bogor, West Java. Based on the P12 crusher production results achieved by PT Indocement Tunggal Prakarsa Tbk in March, namely 9,009,61 tons/shift from the target of 15,000 tons/shift. The results of limestone blasting need to be carried out in a size reduction process according to the cement factory's request. The crusher circuit consists of a hopper, crusher, belt conveyor. The research results show that the working time of the belt conveyor unit shows that the production amount is not yet optimal, as well as the effective working time of 4.81 hours/shift. Factors that hinder the crushing unit process include waiting time and lack of feed from the ROM. Improvements are carried out by referring to the production targets desired by the company and the availability of equipment referring to KEPMEN ESDM 1827 K/30/MEM/2018 to review standardization for equipment work in obtaining optimal production. To increase the efficiency of tool work, it can be done by evaluating waiting times and increasing the rate so that production targets can be achieved. Then, production results after improvement efforts were carried out increased to 15,009.4 tons/shift with an effective working time of 6.16 hours. Abstrak. PT Indocement Tunggal Prakarsa merupakan perusahaan industri semen yang berada di Citereup, Bogor, Jawa Barat. Berdasarkan hasil produksi crusher P12 yang dicapai PT Indocement Tunggal Prakarsa Tbk pada bulan Maret yaitu 9.009,61 ton/shift dari target 15.000 ton/shift. Hasil peledakan batugamping perlu dilakukan proses pengecilan ukuran yang sesuai dengan permintaan pabrik semen, rangkaian peremuk terdiri dari hopper, crusher, belt conveyor. Hasil penelitian menunjukkan bahwa dari waktu kerja unit belt conveyor didapatkan jumlah produksi yang belum maksimal, begitu juga dengan waktu kerja efektif sebesar 4,81 jam/shift. Faktor-faktor yang menghambat unit proses peremukan antara lain waktu tunggu dan kurangnya umpan dari ROM. Perbaikan dilakukan dengan mengacu pada target produksi yang diinginkan oleh perusahaan dan ketersediaan alat mengacu kepada KEPMEN ESDM 1827 K/30/MEM/2018 untuk mengkaji terhadap standarisasi untuk kerja peralatan dalam memperoleh produksi yang optimal. Untuk meningkatkan efisiensi kerja alat dapat dilakukan dengan mengevaluasi waktu tunggu dan menambah ritase sehingga target produksi dapat tercapai. Kemudian untuk hasil produksi setelah dilakukan upaya perbaikan meningkat menjadi 15.009,4 ton/shift dengan waktu kerja efektif 6,16 jam.
Title: Optimasi Kinerja Belt Conveyor untuk Produksi Batugamping di PT Indocement Tunggal Prakarsa Kelurahan Citereup, Kecamatan Gunung Putri, Kabupaten Bogor, Provinsi Jawa Barat
Description:
Abstract.
PT Indocement Tunggal Prakarsa is a cement industry company located in Citereup, Bogor, West Java.
Based on the P12 crusher production results achieved by PT Indocement Tunggal Prakarsa Tbk in March, namely 9,009,61 tons/shift from the target of 15,000 tons/shift.
The results of limestone blasting need to be carried out in a size reduction process according to the cement factory's request.
The crusher circuit consists of a hopper, crusher, belt conveyor.
The research results show that the working time of the belt conveyor unit shows that the production amount is not yet optimal, as well as the effective working time of 4.
81 hours/shift.
Factors that hinder the crushing unit process include waiting time and lack of feed from the ROM.
Improvements are carried out by referring to the production targets desired by the company and the availability of equipment referring to KEPMEN ESDM 1827 K/30/MEM/2018 to review standardization for equipment work in obtaining optimal production.
To increase the efficiency of tool work, it can be done by evaluating waiting times and increasing the rate so that production targets can be achieved.
Then, production results after improvement efforts were carried out increased to 15,009.
4 tons/shift with an effective working time of 6.
16 hours.
Abstrak.
PT Indocement Tunggal Prakarsa merupakan perusahaan industri semen yang berada di Citereup, Bogor, Jawa Barat.
Berdasarkan hasil produksi crusher P12 yang dicapai PT Indocement Tunggal Prakarsa Tbk pada bulan Maret yaitu 9.
009,61 ton/shift dari target 15.
000 ton/shift.
Hasil peledakan batugamping perlu dilakukan proses pengecilan ukuran yang sesuai dengan permintaan pabrik semen, rangkaian peremuk terdiri dari hopper, crusher, belt conveyor.
Hasil penelitian menunjukkan bahwa dari waktu kerja unit belt conveyor didapatkan jumlah produksi yang belum maksimal, begitu juga dengan waktu kerja efektif sebesar 4,81 jam/shift.
Faktor-faktor yang menghambat unit proses peremukan antara lain waktu tunggu dan kurangnya umpan dari ROM.
Perbaikan dilakukan dengan mengacu pada target produksi yang diinginkan oleh perusahaan dan ketersediaan alat mengacu kepada KEPMEN ESDM 1827 K/30/MEM/2018 untuk mengkaji terhadap standarisasi untuk kerja peralatan dalam memperoleh produksi yang optimal.
Untuk meningkatkan efisiensi kerja alat dapat dilakukan dengan mengevaluasi waktu tunggu dan menambah ritase sehingga target produksi dapat tercapai.
Kemudian untuk hasil produksi setelah dilakukan upaya perbaikan meningkat menjadi 15.
009,4 ton/shift dengan waktu kerja efektif 6,16 jam.

Related Results

DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAFTAR PUSTAKAAditama, M. H. R., & Selfiardy, S. (2022). Kehidupan Mahasiswa Kuliah Sambil Bekerja di Masa Pandemi Covid-19. Kidspedia: Jurnal Pendidikan Anak Usia Dini, 3(...
Keragaan Produksi Kentang G2 Genotipe IPB Asal Stek dan Umbi di Garut Jawa Barat
Keragaan Produksi Kentang G2 Genotipe IPB Asal Stek dan Umbi di Garut Jawa Barat
Konsumsi kentang terus meningkat seiring meningkatnya penduduk, namun total produksinya mengalami penurunan pada tahun 2015, maka diperlukan usaha memperoleh varietas yang berprodu...
Keragaan Produksi Kentang G2 Genotipe IPB Asal Stek dan Umbi di Garut Jawa Barat
Keragaan Produksi Kentang G2 Genotipe IPB Asal Stek dan Umbi di Garut Jawa Barat
Konsumsi kentang terus meningkat seiring meningkatnya penduduk, namun total produksinya mengalami penurunan pada tahun 2015, maka diperlukan usaha memperoleh varietas yang berprodu...
COMPARATIVE ANALYSIS OF THE FINANCIAL STATEMENTS BASED ON PROFITABILITY AND SOLVENCY RATIO
COMPARATIVE ANALYSIS OF THE FINANCIAL STATEMENTS BASED ON PROFITABILITY AND SOLVENCY RATIO
This research aims to determine the comparative analysis of financial statements. PT Semen Indonesia (Persero) Tbk with PT Indocement Tunggal Prakarsa Tbk. Based on the results of ...
SEJARAH KELURAHAN TAKIMPO KECAMATAN PASARWAJO KABUPATEN BUTON (1981-2017)
SEJARAH KELURAHAN TAKIMPO KECAMATAN PASARWAJO KABUPATEN BUTON (1981-2017)
ABSTRAK: Permasalahan yang dikaji dalam penelitian ini adalah: 1)  Apa yang melatarbelakangi terbentuknya Kelurahan Takimpo Kecamatan Pasarwajo Kabupaten Buton? 2) Bagaimana proses...
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...

Back to Top