Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Research and Application of Temporary Plugging Agent Technology for High-Pressure Wells in Gas Storage Facilities

View through CrossRef
Before various construction of gas storage well, in order to ensure safety, the reservoir must be temporarily blocked, degassed by circulation and no gas in the well can be operated. There are many temporary plugging methods for oil and gas wells. This paper studies the more advanced micro mesh gel temporary plugging technology in the industry and its application in gas storage wells, which mainly solves the problems of poor degradation backflow effect and difficult permeability recovery caused by weak formation stability after temporary plugging of gas storage wells. Research points: (1) On the basis of ordinary gel, through the fusion with cross-linking agent with special structure, a micron network polymer with significant steric hindrance effect on water molecules is finally formed, which improves the strength and stability of the gel system. (2) Add hexamethylene tetramine, bisphenol propane, delayed cross-linking agent and stabilizer into the polymer aqueous solution. It is verified by laboratory tests that the micron mesh gel can be formed after constant temperature coagulation for 3h~70h at ambient temperature of 90°C~170°C. (3) The temperature resistance, permeability and gel breaking of micron mesh gel are tested in the laboratory, and the results can meet the construction requirements. (4) After the temporary plugging operation of Well Su 49K-2X in the gas storage reservoir of Huabei Oilfield is completed, the degradation products of gel breaking will flow back smoothly to ensure that the well can be put into normal injection and production quickly. The test results show that: (1) Micron mesh gel has the advantages of long plugging validity, high temperature resistance, low viscosity after gel breaking, no residue, thorough gel breaking, no formation plugging pollution, and no impact on the original reservoir permeability. It is a new green plugging technology suitable for deep buried high-temperature depleted oil and gas reservoirs. (2) Before construction, the well temperature shall be measured to conduct test injection, so as to prevent gas invasion from affecting the construction effect. The pump injection displacement is designed to be redundant, so as to prevent the low molecular solution from not reaching the design position in the well on time, and the formation of solid rubber plugs at other positions in the well from affecting the construction.
Title: Research and Application of Temporary Plugging Agent Technology for High-Pressure Wells in Gas Storage Facilities
Description:
Before various construction of gas storage well, in order to ensure safety, the reservoir must be temporarily blocked, degassed by circulation and no gas in the well can be operated.
There are many temporary plugging methods for oil and gas wells.
This paper studies the more advanced micro mesh gel temporary plugging technology in the industry and its application in gas storage wells, which mainly solves the problems of poor degradation backflow effect and difficult permeability recovery caused by weak formation stability after temporary plugging of gas storage wells.
Research points: (1) On the basis of ordinary gel, through the fusion with cross-linking agent with special structure, a micron network polymer with significant steric hindrance effect on water molecules is finally formed, which improves the strength and stability of the gel system.
(2) Add hexamethylene tetramine, bisphenol propane, delayed cross-linking agent and stabilizer into the polymer aqueous solution.
It is verified by laboratory tests that the micron mesh gel can be formed after constant temperature coagulation for 3h~70h at ambient temperature of 90°C~170°C.
(3) The temperature resistance, permeability and gel breaking of micron mesh gel are tested in the laboratory, and the results can meet the construction requirements.
(4) After the temporary plugging operation of Well Su 49K-2X in the gas storage reservoir of Huabei Oilfield is completed, the degradation products of gel breaking will flow back smoothly to ensure that the well can be put into normal injection and production quickly.
The test results show that: (1) Micron mesh gel has the advantages of long plugging validity, high temperature resistance, low viscosity after gel breaking, no residue, thorough gel breaking, no formation plugging pollution, and no impact on the original reservoir permeability.
It is a new green plugging technology suitable for deep buried high-temperature depleted oil and gas reservoirs.
(2) Before construction, the well temperature shall be measured to conduct test injection, so as to prevent gas invasion from affecting the construction effect.
The pump injection displacement is designed to be redundant, so as to prevent the low molecular solution from not reaching the design position in the well on time, and the formation of solid rubber plugs at other positions in the well from affecting the construction.

Related Results

Simulation of temporary plugging agent transport and optimization of fracturing parameters based on fiber optic monitoring data
Simulation of temporary plugging agent transport and optimization of fracturing parameters based on fiber optic monitoring data
Temporary plugging and fracturing is an important technology for the efficient development of unconventional reservoirs. Due to the diverse physical properties of unconventional re...
Survey Of Horizontal Gas Well Activity
Survey Of Horizontal Gas Well Activity
Abstract This paper presents the results of a survey on horizontal gas well activity throughout the world. The survey was conducted for the Gas Research Institute...
Some Technical and Economic Aspects Of Underground Gas Storage
Some Technical and Economic Aspects Of Underground Gas Storage
Abstract This article deals with comparative technical and economic aspects of conventional and some nonconventional methods of storing gas. Conventional gas stor...
Developments in Appalachian Area in 1943
Developments in Appalachian Area in 1943
ABSTRACT New York. The expected increase in wildcat drilling in New York state proved true in wells drilled but was utterly disappointing in results obtained. In ...
Selective Plugging of Water Injection Wells
Selective Plugging of Water Injection Wells
Abstract A field study was made to determine the feasibility of changing the injection profile of water-input wells after water breakthrough at producing oil wells. ...
Multistage Temporary Plugging Acid Fracturing Technology Application Long Interval Heterogeneous Carbonate Reservoir
Multistage Temporary Plugging Acid Fracturing Technology Application Long Interval Heterogeneous Carbonate Reservoir
Abstract Sichuan Puguang Gas Field is high sulfur content carbonate gas reservoir buried in the depth of 4775.4~6461.3m. In the produced gas, the average content ...

Back to Top