Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects
View through CrossRef
Abstract
Characterised as uncertain, complex, politically-sensitive, and extensive in nature define a mega infrastructure project which counting multiple stakeholders with various interest. Common problems during construction on stakeholder conflict were due to project stakeholders have different interests. Such problems are reworks, disagreements, cost overruns, lack of communication. As the project getting complex and massive, the importance of stakeholder engagement element in project management process is undeniable. The stakeholders in infrastructure project must be efficiently engaged and need earlier involvement during the pre-construction phase either direct or indirectly. This paper aims to recommend improvement to the initial process in stakeholder engagement in infrastructure which involved the internal preparation of engaging the stakeholder before later stage of consultation take place. Two case studies across New Zealand and Malaysia applies through a comparative qualitative analysis and observations. This research obtained information from project documentation and interviews. Such documents are engagement reports, public engagement report and project documentation. The result from the comparative analysis shows the attributes obtained from two case studies during the initial early preparation process of large/mega infrastructure projects. Lesson learnt derived from these two case studies will adding on the improvement to the stakeholder engagement process for an infrastructure project. The findings provide insight into how the factors of engaging stakeholders and public early and closely, improve transparency of information, and understanding of the design concept would help in improving international early preparation of stakeholder in both projects. The paper provides a point of reference for project owner and project team to assist them in emerging best practices of stakeholder engagement in major infrastructure construction projects.
Title: Cross case analysis on internal early preparation of stakeholder engagement for infrastructure projects
Description:
Abstract
Characterised as uncertain, complex, politically-sensitive, and extensive in nature define a mega infrastructure project which counting multiple stakeholders with various interest.
Common problems during construction on stakeholder conflict were due to project stakeholders have different interests.
Such problems are reworks, disagreements, cost overruns, lack of communication.
As the project getting complex and massive, the importance of stakeholder engagement element in project management process is undeniable.
The stakeholders in infrastructure project must be efficiently engaged and need earlier involvement during the pre-construction phase either direct or indirectly.
This paper aims to recommend improvement to the initial process in stakeholder engagement in infrastructure which involved the internal preparation of engaging the stakeholder before later stage of consultation take place.
Two case studies across New Zealand and Malaysia applies through a comparative qualitative analysis and observations.
This research obtained information from project documentation and interviews.
Such documents are engagement reports, public engagement report and project documentation.
The result from the comparative analysis shows the attributes obtained from two case studies during the initial early preparation process of large/mega infrastructure projects.
Lesson learnt derived from these two case studies will adding on the improvement to the stakeholder engagement process for an infrastructure project.
The findings provide insight into how the factors of engaging stakeholders and public early and closely, improve transparency of information, and understanding of the design concept would help in improving international early preparation of stakeholder in both projects.
The paper provides a point of reference for project owner and project team to assist them in emerging best practices of stakeholder engagement in major infrastructure construction projects.
Related Results
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct
Introduction
Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
STAKEHOLDER ENGAGEMENT AND PROJECT PERFORMANCE OF ROAD INFRASTRUCTURE PROJECTS IN CENTRAL EQUATORIA STATE, SOUTH SUDAN
STAKEHOLDER ENGAGEMENT AND PROJECT PERFORMANCE OF ROAD INFRASTRUCTURE PROJECTS IN CENTRAL EQUATORIA STATE, SOUTH SUDAN
Objective: This study sought to establish the relationship between stakeholder engagement practices and the performance of road infrastructure projects in Central Equatoria State, ...
Stakeholder Engagement in Management Studies: Current and Future Debates
Stakeholder Engagement in Management Studies: Current and Future Debates
Stakeholder engagement refers to the aims, practices, and impacts of stakeholder relations in businesses and other organizations. According to a general framework, stakeholder enga...
External Stakeholder Engagement and Competence-Based Curriculum Implementation in Selected Secondary Schools in Buwama Sub County, Mpigi District, Uganda
External Stakeholder Engagement and Competence-Based Curriculum Implementation in Selected Secondary Schools in Buwama Sub County, Mpigi District, Uganda
The overall objective of this study was to examine the influence of external stakeholder engagement on
competence-based curriculum implementation in selected secondary schools in B...
A Review of Stakeholder Engagement in Integrated River Basin Management
A Review of Stakeholder Engagement in Integrated River Basin Management
To address water-related issues of river pollution, floods, droughts, and ecological water allocations, there is a need for an integrated river basin management (IRBM) plan for the...
Internal Stakeholder Management in ZESCO Distribution Projects
Internal Stakeholder Management in ZESCO Distribution Projects
The study reported in this paper investigated internal stakeholder management in ZESCO distribution projects, recognizing the influence of stakeholders on both project performance ...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract
Introduction
Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...
Artificial Intelligence in Project Management: A Study of The Role of Ai-Powered Chatbots in Project Stakeholder Engagement
Artificial Intelligence in Project Management: A Study of The Role of Ai-Powered Chatbots in Project Stakeholder Engagement
Artificial Intelligence (AI) is increasingly becoming a cornerstone in the evolution of project management. Its capabilities extend beyond simple automation, fostering improved dec...