Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Emergency Disconnection Guidelines

View through CrossRef
Abstract The construction of petroleum wells is becoming more and more complex and challenger. Drilling and completion in deep and ultra deep water requires use of dynamic positioning rigs increasingly sophisticated. Despite all the technology, an emergency disconnection may occurs at any time in dynamic positioning drilling rigs, sometimes in a surprising and unexpected way, be by human error, adverse environmental conditions or blackouts. The selection of proper EDS (Emergency Disconnections Sequence), followed by well thought operational decisions, is primordial to reduce the potential damage caused by disconnections. Unfortunately, the needed EDS is not always available at moderns rigs. Emergency disconnection guidelines were established for various drilling and completion operations, to be studied and discussed previously activities with BOP / Xtmas Tree connected to the wellhead. Additionally, this work suggests new EDS options for different operations and BOP configurations (number/type of shear rams available). Operational safety and minimization of damage are the focus of this work. It will be presented some informations on emergency disconnections occurred over 30 years of operations in Brazil DP rigs, obtained through information gathered in one of the largest databases of DP incidents worldwide. Zero emergency disconnection is the goal of all DP rig, but it is something that is still far from achieving. Reduce losses, putting the well in safe condition facing the possibility of disconnection, avoiding environmental tragedies as happened in Macondo well is the prime directive of any oil company. The incorporation of new configurations of EDS by manufacturers of BOP and the use of guidelines for emergency disconnection certainly contribute to create situations where emergency disconnection can be executed with more confidence. Introduction Over the last two decades drilling and completion from DP rigs has become common practice in Brazil, especially with the growing activity in ultra deep water. In order to guarantee safety, it has been necessary to put more and more focus on the ability to perform safe disconnection independent of the operation occurring in the well. Loss of position without safe disconnection could result in critical damage to the well barrier as well as to exposed subsea equipment. The ultimate consequence could be a well blowout and/or severe damage to subsea production systems like production templates resulting in risk to personnel, environmental damage, financial loss and harm to the reputation of the company [1]. In general terms, an unsuccessful emergency disconnection can result in:Abrupt discontinuation of operations in progress, with high possibility of serious operational problems in the well (stuck pipe, fishing, kick, etc).Underground blowout or subsea blowout in the case of wells without riser safety margin and as a result of not closing properly the BOP, Xmas Tree or other equipment.Total loss of the well.Break and falling of drilling and completion risers on the well, flowlines, manifolds or other Xmas Tree.Severe injury or damage.
Title: Emergency Disconnection Guidelines
Description:
Abstract The construction of petroleum wells is becoming more and more complex and challenger.
Drilling and completion in deep and ultra deep water requires use of dynamic positioning rigs increasingly sophisticated.
Despite all the technology, an emergency disconnection may occurs at any time in dynamic positioning drilling rigs, sometimes in a surprising and unexpected way, be by human error, adverse environmental conditions or blackouts.
The selection of proper EDS (Emergency Disconnections Sequence), followed by well thought operational decisions, is primordial to reduce the potential damage caused by disconnections.
Unfortunately, the needed EDS is not always available at moderns rigs.
Emergency disconnection guidelines were established for various drilling and completion operations, to be studied and discussed previously activities with BOP / Xtmas Tree connected to the wellhead.
Additionally, this work suggests new EDS options for different operations and BOP configurations (number/type of shear rams available).
Operational safety and minimization of damage are the focus of this work.
It will be presented some informations on emergency disconnections occurred over 30 years of operations in Brazil DP rigs, obtained through information gathered in one of the largest databases of DP incidents worldwide.
Zero emergency disconnection is the goal of all DP rig, but it is something that is still far from achieving.
Reduce losses, putting the well in safe condition facing the possibility of disconnection, avoiding environmental tragedies as happened in Macondo well is the prime directive of any oil company.
The incorporation of new configurations of EDS by manufacturers of BOP and the use of guidelines for emergency disconnection certainly contribute to create situations where emergency disconnection can be executed with more confidence.
Introduction Over the last two decades drilling and completion from DP rigs has become common practice in Brazil, especially with the growing activity in ultra deep water.
In order to guarantee safety, it has been necessary to put more and more focus on the ability to perform safe disconnection independent of the operation occurring in the well.
Loss of position without safe disconnection could result in critical damage to the well barrier as well as to exposed subsea equipment.
The ultimate consequence could be a well blowout and/or severe damage to subsea production systems like production templates resulting in risk to personnel, environmental damage, financial loss and harm to the reputation of the company [1].
In general terms, an unsuccessful emergency disconnection can result in:Abrupt discontinuation of operations in progress, with high possibility of serious operational problems in the well (stuck pipe, fishing, kick, etc).
Underground blowout or subsea blowout in the case of wells without riser safety margin and as a result of not closing properly the BOP, Xmas Tree or other equipment.
Total loss of the well.
Break and falling of drilling and completion risers on the well, flowlines, manifolds or other Xmas Tree.
Severe injury or damage.

Related Results

The Manufacture of Disconnection
The Manufacture of Disconnection
<p>In Silicon Valley, the world’s most famous site of technological innovation, technology professionals are rejecting their own inventions and disconnecting from the interne...
WSOG and Emergency Disconnection Guidelines
WSOG and Emergency Disconnection Guidelines
Abstract Dynamic Positioning (DP) systems are becoming more and more used in the Oil and Gas Industry. Over the last decades, the escalation in deep-water exploratio...
PROSEDUR PELAKSANAAN TUGAS STAFF HEAD TEMPORARY DISCONNECTION PADA PT PALYJA
PROSEDUR PELAKSANAAN TUGAS STAFF HEAD TEMPORARY DISCONNECTION PADA PT PALYJA
ABSTRAK Penulisan ini tentang prosedur yang berlaku di PT PALYJA DPP Pusat. Tujuan dari laporan akhir ini adalah untuk mengetahui berjalannya dengan baik prosedur pelaksaan tugas p...
Is Habitual Smartphone Use at Odds with Digital Disconnection?
Is Habitual Smartphone Use at Odds with Digital Disconnection?
Digital disconnection is defined as setting deliberate limits to connectivity to enhance (digital) well-being. Yet, for some people, disconnecting from their devices may prove more...
Evaluating the Science to Inform the Physical Activity Guidelines for Americans Midcourse Report
Evaluating the Science to Inform the Physical Activity Guidelines for Americans Midcourse Report
Abstract The Physical Activity Guidelines for Americans (Guidelines) advises older adults to be as active as possible. Yet, despite the well documented benefits of physical a...
Post-stroke deficit prediction from lesion and indirect structural and functional disconnection
Post-stroke deficit prediction from lesion and indirect structural and functional disconnection
AbstractBehavioural deficits in stroke reflect both structural damage at the site of injury, and widespread network dysfunction caused by structural, functional, and metabolic disc...
Drilling Riser Disconnection Challenges in Ultra-Deep Water
Drilling Riser Disconnection Challenges in Ultra-Deep Water
With the extension of the offshore drilling operations to water depths of 10,000 ft and beyond, the technical challenges involved also increased considerably. In this context, the ...
Association between physical fitness and core emergency competencies among emergency nurses in China
Association between physical fitness and core emergency competencies among emergency nurses in China
Abstract Background Emergency nurses require exceptional levels of clinical professionalism and physical fitness.However, little is known about t...

Back to Top