For a number of years one of the main areas being developed has been multilateral wells to better access the reservoir. One of the greatest challenges in operating an efficient multilateral well is having control of where any water production is coming from. Effectively managing produced water can bring obvious benefits to the economics of a well. One tool that has not been exploited for this type of application is swellable packers. Coiled Tubing and Swellable Packer technologies were recently combined on a land-based operation in Holland to successfully isolate a water-producing leg of a well lateral. The operator asked for a proposed completion solution after a previous attempt to isolate the lateral had proved unsuccessful.
The proposed solution was designed to straddle the lateral entry/exit with a scab liner, isolated and anchored at either end by water-swellable packers. The straddle was required to seal inside the main bore casing and withstand a differential pressure at well operating temperatures. Swellable packers were selected from the various proven openhole isolation devices available to the industry to provide the zonal isolation required in the multi-zone intervals. This was the first swellable straddle completion in Holland in a watered out, commingled gas environment in which isolation would be contained solely by swellable packers.
The water producing lateral was successfully straddled using two water swellable packers run with base pipe between the two packers. In this application the Swellable Straddle was deployed in conjunction with an additional mechanical packer to anchor the straddle whilst the swelling process in the aqueous environment took place. A subsequent intervention with coiled tubing and a resettable Inflatable Test Packer confirmed the straddle had successfully sealed and had isolated the water producing lateral.
This paper presents a solution to the challenges of isolating laterals using swellable packers and coiled tubing, and how to verify that the junction has been successfully isolated.
Title: Merging Coiled Tubing and Swellable Packer Technologies
Description:
Abstract
For a number of years one of the main areas being developed has been multilateral wells to better access the reservoir.
One of the greatest challenges in operating an efficient multilateral well is having control of where any water production is coming from.
Effectively managing produced water can bring obvious benefits to the economics of a well.
One tool that has not been exploited for this type of application is swellable packers.
Coiled Tubing and Swellable Packer technologies were recently combined on a land-based operation in Holland to successfully isolate a water-producing leg of a well lateral.
The operator asked for a proposed completion solution after a previous attempt to isolate the lateral had proved unsuccessful.
The proposed solution was designed to straddle the lateral entry/exit with a scab liner, isolated and anchored at either end by water-swellable packers.
The straddle was required to seal inside the main bore casing and withstand a differential pressure at well operating temperatures.
Swellable packers were selected from the various proven openhole isolation devices available to the industry to provide the zonal isolation required in the multi-zone intervals.
This was the first swellable straddle completion in Holland in a watered out, commingled gas environment in which isolation would be contained solely by swellable packers.
The water producing lateral was successfully straddled using two water swellable packers run with base pipe between the two packers.
In this application the Swellable Straddle was deployed in conjunction with an additional mechanical packer to anchor the straddle whilst the swelling process in the aqueous environment took place.
A subsequent intervention with coiled tubing and a resettable Inflatable Test Packer confirmed the straddle had successfully sealed and had isolated the water producing lateral.
This paper presents a solution to the challenges of isolating laterals using swellable packers and coiled tubing, and how to verify that the junction has been successfully isolated.
Related Results
Prebending Coiled Tubing and Its Fatigue Life Prediction
Prebending Coiled Tubing and Its Fatigue Life Prediction
Coiled tubing is widely used in oil drilling and production operations. However, extreme high stress variation of coiled tubing during the processes of pulling out, rolling in the ...
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Abstract
This paper provides in-depth analysis of a low-cost solution to economically sustain production and avoid high workover costs. This paper conducts the techn...
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Abstract
Recent technological innovations in seismic imaging, directional drilling and hydraulic fracturing and other completion techniques have made development of ...
Window Milling Tool Development For Coiled Tubing Drilling
Window Milling Tool Development For Coiled Tubing Drilling
Abstract
In order to optimize production from existing wells, it is often desirable to re-enter the wells and, after milling a window in the well casing, sidetrac...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract
OBJECTIVE / SCOPE
An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Coiled Tubing Working Life Prediction
Coiled Tubing Working Life Prediction
ABSTRACT
Failure of coiled tubing, due to the repeated bending and plastic deformation of coiled tubing on and off the reel and gooseneck, is of great concern in coi...
Challenging Through-Tubing Intervention Succeeds Despite Extreme Well Conditions
Challenging Through-Tubing Intervention Succeeds Despite Extreme Well Conditions
Abstract
The subject well, located onshore in the Kingdom of Saudi Arabia, had approximately 9,000 ft of 2.00-in coiled tubing lost in the wellbore, and was requirin...
Cement Packer Installation in Highly Deviated Well Using the Balanced Hydrostatic Plug Concept through Coiled Tubing: Offshore Niger Delta
Cement Packer Installation in Highly Deviated Well Using the Balanced Hydrostatic Plug Concept through Coiled Tubing: Offshore Niger Delta
Abstract
The "balanced cement plug" concept has long been a standard industry practice for setting plugs in a wellbore. This requires setting a hydrostatic plug cons...