Challenging Through-Tubing Intervention Succeeds Despite Extreme Well Conditions
View through CrossRef
Abstract
The subject well, located onshore in the Kingdom of Saudi Arabia, had approximately 9,000 ft of 2.00-in coiled tubing lost in the wellbore, and was requiring thru-tubing intervention to recover the parted string and subsequently abandon the well. The string was lost following a failed cementing operation that left the string stuck due to 2,000 ft of cement inadvertently setting in the coiled tubing-production tubing annulus. Additionally, the lost coiled tubing had an inconel fiber optic cable (IFC) running through it, which presented an additional challenge in recovering the tubing from the wellbore. Downhole conditions were extreme, with 42% hydrogen sulfide and 10% carbon dioxide emitting from the wellbore. Operational conditions were also a major constraint, as the drive fluid was mud with 16% solids content, along with mud which had "packed off" in the coiled tubing-wellbore annulus. These factors created great challenges, and meticulous planning and execution was required to prevent critical well-control problems throughout the intervention operation.
The operation began with a rig-less coiled tubing operation to polish the top of the "fish" and permit access for a fishing assembly to begin recovery of the string. This was followed by the deployment of a workover rig to provide a more effective and time-efficient platform to recover the string. Following the string recovery, the 4.5-inch heavy-walled tubing required severing to commence the abandonment process. This paper will describe the challenging operation to recover the coiled tubing from the wellbore and sever the heavy-walled tubular, with all cautionary measures taken to mitigate well-control hazards and avoid lost-time safety incidents.
The operation was concluded with most of the string recovered without any lost-time incidents. More than 62 runs were conducted, both rig-less and rig-supported, with the IFC coiled tubing string being recovered in 100- to 500-foot sections. Despite the heavy mud and high solids content, the heavy-walled tubular was cut successfully using a hydraulic cutter, which allowed for its subsequent recovery.
Given the extremely sour down-hole conditions, along with the multiple challenging operational factors, this case presents an application with a unique set of unconventional circumstances which usually prohibit the successful recovery of lost strings. This case also demonstrates how careful planning, round-the-clock technical support and effective execution were the cornerstones of a successful intervention with extremely challenging conditions.
Title: Challenging Through-Tubing Intervention Succeeds Despite Extreme Well Conditions
Description:
Abstract
The subject well, located onshore in the Kingdom of Saudi Arabia, had approximately 9,000 ft of 2.
00-in coiled tubing lost in the wellbore, and was requiring thru-tubing intervention to recover the parted string and subsequently abandon the well.
The string was lost following a failed cementing operation that left the string stuck due to 2,000 ft of cement inadvertently setting in the coiled tubing-production tubing annulus.
Additionally, the lost coiled tubing had an inconel fiber optic cable (IFC) running through it, which presented an additional challenge in recovering the tubing from the wellbore.
Downhole conditions were extreme, with 42% hydrogen sulfide and 10% carbon dioxide emitting from the wellbore.
Operational conditions were also a major constraint, as the drive fluid was mud with 16% solids content, along with mud which had "packed off" in the coiled tubing-wellbore annulus.
These factors created great challenges, and meticulous planning and execution was required to prevent critical well-control problems throughout the intervention operation.
The operation began with a rig-less coiled tubing operation to polish the top of the "fish" and permit access for a fishing assembly to begin recovery of the string.
This was followed by the deployment of a workover rig to provide a more effective and time-efficient platform to recover the string.
Following the string recovery, the 4.
5-inch heavy-walled tubing required severing to commence the abandonment process.
This paper will describe the challenging operation to recover the coiled tubing from the wellbore and sever the heavy-walled tubular, with all cautionary measures taken to mitigate well-control hazards and avoid lost-time safety incidents.
The operation was concluded with most of the string recovered without any lost-time incidents.
More than 62 runs were conducted, both rig-less and rig-supported, with the IFC coiled tubing string being recovered in 100- to 500-foot sections.
Despite the heavy mud and high solids content, the heavy-walled tubular was cut successfully using a hydraulic cutter, which allowed for its subsequent recovery.
Given the extremely sour down-hole conditions, along with the multiple challenging operational factors, this case presents an application with a unique set of unconventional circumstances which usually prohibit the successful recovery of lost strings.
This case also demonstrates how careful planning, round-the-clock technical support and effective execution were the cornerstones of a successful intervention with extremely challenging conditions.
Related Results
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Abstract
This paper provides in-depth analysis of a low-cost solution to economically sustain production and avoid high workover costs. This paper conducts the techn...
Intervention in Wells with Buckled Production Tubing
Intervention in Wells with Buckled Production Tubing
Abstract
Sometimes the production tubing in a well can be helically buckled due to problems with the completion design, completion hardware, or installation probl...
Effects of Buckled Tubing on Coiled Tubing Passibility
Effects of Buckled Tubing on Coiled Tubing Passibility
Abstract
Many coiled tubing(CT) operations involve passage through the production tubing. However, due to the adverse wellbore trajectory or tubing geometries, espec...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract
OBJECTIVE / SCOPE
An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Prebending Coiled Tubing and Its Fatigue Life Prediction
Prebending Coiled Tubing and Its Fatigue Life Prediction
Coiled tubing is widely used in oil drilling and production operations. However, extreme high stress variation of coiled tubing during the processes of pulling out, rolling in the ...
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Abstract
Recent technological innovations in seismic imaging, directional drilling and hydraulic fracturing and other completion techniques have made development of ...
A History of Gas Lift Valve and Gas Lift Mandrel Damage and Subsequent Retrofit Gas Lift Straddle Installation in Alaska
A History of Gas Lift Valve and Gas Lift Mandrel Damage and Subsequent Retrofit Gas Lift Straddle Installation in Alaska
Abstract
In Alaska oilfields, non rig tubing repair has become a viable alternative to rig workovers (RWO). Tubing straddles can remediate tubing by casing ("A" annu...
An Operator-Oriented Data Acquisition System For Coiled-Tubing Units
An Operator-Oriented Data Acquisition System For Coiled-Tubing Units
ABSTRACT
When equipped with certain electronic hardware a coil tubing unit (CTU) can acquire powerful capabilities. Among these are automatic monitoring of equipm...