Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Practical Applications Of The Endless Tubing Unit

View through CrossRef
Abstract Since its introduction to the Petroleum Industry in Canada in 1970, the Endless Tubing Unit is finding increasing application in oil, gas and injection well workovers. Gaseous nitrogen as well as various fluids including water, acid and cement have been pumped through the tubing string to depths over 12,000 ft. In most cases the use of the continuous string has proven faster and more economic than alternate methods of performing the work. Various applications and job details of the new service are discussed. Introduction The equipment used for the service is complete on a tandem axle truck which carries 14,000 ft. of tubing coiled on a reel, the tubing injector and the blowout preventer and lubricator. Figure I diagrammatically illustrates the basic components of the system set up ready to run into a well. The lubricator allows the tubing string to be run into or withdrawn from a well under gas or fluid pressure. Table I gives the specifications of the Endless Tubing Unit and of the 3/4" Tubing String. There are a wide variety of well services performed the continuous string, the most frequent of which are:Clean out fill in tubing-packer CompletionsSpot acid, cement, or chemicals on bottom or below packersJet back oil or gas wells after fracturing, using N2 to clean out and initiate flowClean out sanded -in tubing and CasingDisplace tubing to N2 for dry perforatingCirculate hot oil for dewaxing or hydrate plug removalContinuously inject N2 to gas lift well fluids during Drill Stem Testing, or during unloading of a new gas well GAS AND FLUID FRICTION PRESSURE Correlation of friction pressures experienced in the field with theoretically developed values has yielded a set of curves which can be used to predict pump pressures with a reasonable degree of accuracy. Equations used in developing the friction pressure curves of 3/4 tubing, Figure 2 for fluids, and figure 3 for N2 Gas, are given in the Appendix. Under most field conditions the injection rates and surface pressures experienced are approximately as shown in Table 2. APPLICATIONS OF THE ENDLESS TUBING UNIT Some specific examples of 8 jobs performed by the ?" Endless Tubing Unit are cited to give pertinent details for typical applications. Table 3 provides a more general summary of field experience with the new service. Table (Available In Full Paper) CLEAN OUT AND INITIATE FLOW OF GAS WELLS AFTER FRACTURING: Field: Medicine Hat, Alberta Formation: Milk River Sandstone, gas producing wells Operation: 1,000 to 1,500 feet Due to low reservoir pressure, these shallow gas wells often will not flow after fracture treatment, even with inclusion of c gaseous phase such as CO2 or N2 in the treating fluids. In order to assure flowback and cleanout of sand to PBD, some wells have been stimulated with straight KCl water, then subsequently cleaned out with nitrogen injected down the Endless Tubing to initiate gas flow.
Title: Practical Applications Of The Endless Tubing Unit
Description:
Abstract Since its introduction to the Petroleum Industry in Canada in 1970, the Endless Tubing Unit is finding increasing application in oil, gas and injection well workovers.
Gaseous nitrogen as well as various fluids including water, acid and cement have been pumped through the tubing string to depths over 12,000 ft.
In most cases the use of the continuous string has proven faster and more economic than alternate methods of performing the work.
Various applications and job details of the new service are discussed.
Introduction The equipment used for the service is complete on a tandem axle truck which carries 14,000 ft.
of tubing coiled on a reel, the tubing injector and the blowout preventer and lubricator.
Figure I diagrammatically illustrates the basic components of the system set up ready to run into a well.
The lubricator allows the tubing string to be run into or withdrawn from a well under gas or fluid pressure.
Table I gives the specifications of the Endless Tubing Unit and of the 3/4" Tubing String.
There are a wide variety of well services performed the continuous string, the most frequent of which are:Clean out fill in tubing-packer CompletionsSpot acid, cement, or chemicals on bottom or below packersJet back oil or gas wells after fracturing, using N2 to clean out and initiate flowClean out sanded -in tubing and CasingDisplace tubing to N2 for dry perforatingCirculate hot oil for dewaxing or hydrate plug removalContinuously inject N2 to gas lift well fluids during Drill Stem Testing, or during unloading of a new gas well GAS AND FLUID FRICTION PRESSURE Correlation of friction pressures experienced in the field with theoretically developed values has yielded a set of curves which can be used to predict pump pressures with a reasonable degree of accuracy.
Equations used in developing the friction pressure curves of 3/4 tubing, Figure 2 for fluids, and figure 3 for N2 Gas, are given in the Appendix.
Under most field conditions the injection rates and surface pressures experienced are approximately as shown in Table 2.
APPLICATIONS OF THE ENDLESS TUBING UNIT Some specific examples of 8 jobs performed by the ?" Endless Tubing Unit are cited to give pertinent details for typical applications.
Table 3 provides a more general summary of field experience with the new service.
Table (Available In Full Paper) CLEAN OUT AND INITIATE FLOW OF GAS WELLS AFTER FRACTURING: Field: Medicine Hat, Alberta Formation: Milk River Sandstone, gas producing wells Operation: 1,000 to 1,500 feet Due to low reservoir pressure, these shallow gas wells often will not flow after fracture treatment, even with inclusion of c gaseous phase such as CO2 or N2 in the treating fluids.
In order to assure flowback and cleanout of sand to PBD, some wells have been stimulated with straight KCl water, then subsequently cleaned out with nitrogen injected down the Endless Tubing to initiate gas flow.

Related Results

Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Abstract This paper provides in-depth analysis of a low-cost solution to economically sustain production and avoid high workover costs. This paper conducts the techn...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract OBJECTIVE / SCOPE An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Effects of Buckled Tubing on Coiled Tubing Passibility
Effects of Buckled Tubing on Coiled Tubing Passibility
Abstract Many coiled tubing(CT) operations involve passage through the production tubing. However, due to the adverse wellbore trajectory or tubing geometries, espec...
Intervention in Wells with Buckled Production Tubing
Intervention in Wells with Buckled Production Tubing
Abstract Sometimes the production tubing in a well can be helically buckled due to problems with the completion design, completion hardware, or installation probl...
An Operator-Oriented Data Acquisition System For Coiled-Tubing Units
An Operator-Oriented Data Acquisition System For Coiled-Tubing Units
ABSTRACT When equipped with certain electronic hardware a coil tubing unit (CTU) can acquire powerful capabilities. Among these are automatic monitoring of equipm...
Through-Tubing Casing Inspection for Well Integrity Evaluation Using Physics-Driven Machine- Learning Nonlinear Correction
Through-Tubing Casing Inspection for Well Integrity Evaluation Using Physics-Driven Machine- Learning Nonlinear Correction
Multiple casing inspection is a major part of well integrity evaluation during the entire well life cycle. One important aspect is casing deformation that can be prevalent in field...
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Abstract Recent technological innovations in seismic imaging, directional drilling and hydraulic fracturing and other completion techniques have made development of ...
Prebending Coiled Tubing and Its Fatigue Life Prediction
Prebending Coiled Tubing and Its Fatigue Life Prediction
Coiled tubing is widely used in oil drilling and production operations. However, extreme high stress variation of coiled tubing during the processes of pulling out, rolling in the ...

Back to Top