Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

COMPARATIVE STUDY OF RIGID PAVEMENT PLANNING USING BINA MARGA 2017 AND AASHTO 1993 METHODS

View through CrossRef
This study was conducted to determine what factors influence the differences in the results of the Bina Marga 2017 method and the AASHTO 1993 method and determine which planning results are more efficient to be applied to Letjen S. Parman Street. The research method used is a comparative method, using the existing data and the latest data from surveys. As a result of analyzing a rigid road plan with a planned age of 40 years, the Bina Marga 2017 method obtained a concrete slab with a thickness of 305 mm, and the AASHTO 1993 method obtained a concrete slab with a thickness of 280 mm. Further differences in results can be seen in the level of traffic load during the service life, the diameter of the dowels, the spacing of the tie bars, and the minimum design height of the subgrade embankment. The differences in the results of these plans are caused by two main factors, namely the factor of using the cumulative traffic growth value (R) in the Bina Marga 2017 method and the direct use of the subgrade CBR value in the AASHTO 1993 method. Based on the data that has been obtained, it is concluded that the 1993 AASHTO method provides more efficient results to be applied with considerations in terms of smaller plate dimensions and fewer connections and reinforcement requirements. Which when calculating the work cost, the AASHTO 1993 methods results give a smaller number of work volumes, so it has the possibility to provide a more economical work cost than the Bina Marga 2017 methods results.
Title: COMPARATIVE STUDY OF RIGID PAVEMENT PLANNING USING BINA MARGA 2017 AND AASHTO 1993 METHODS
Description:
This study was conducted to determine what factors influence the differences in the results of the Bina Marga 2017 method and the AASHTO 1993 method and determine which planning results are more efficient to be applied to Letjen S.
Parman Street.
The research method used is a comparative method, using the existing data and the latest data from surveys.
As a result of analyzing a rigid road plan with a planned age of 40 years, the Bina Marga 2017 method obtained a concrete slab with a thickness of 305 mm, and the AASHTO 1993 method obtained a concrete slab with a thickness of 280 mm.
Further differences in results can be seen in the level of traffic load during the service life, the diameter of the dowels, the spacing of the tie bars, and the minimum design height of the subgrade embankment.
The differences in the results of these plans are caused by two main factors, namely the factor of using the cumulative traffic growth value (R) in the Bina Marga 2017 method and the direct use of the subgrade CBR value in the AASHTO 1993 method.
Based on the data that has been obtained, it is concluded that the 1993 AASHTO method provides more efficient results to be applied with considerations in terms of smaller plate dimensions and fewer connections and reinforcement requirements.
Which when calculating the work cost, the AASHTO 1993 methods results give a smaller number of work volumes, so it has the possibility to provide a more economical work cost than the Bina Marga 2017 methods results.

Related Results

Primerjalna književnost na prelomu tisočletja
Primerjalna književnost na prelomu tisočletja
In a comprehensive and at times critical manner, this volume seeks to shed light on the development of events in Western (i.e., European and North American) comparative literature ...
Peran Dinas Sumber Daya Air Bina Marga dan Bina Konstruksi dalam Mengembangkan Taman Sebagai Ruang Terbuka Hijau (RTH) di Kota Medan
Peran Dinas Sumber Daya Air Bina Marga dan Bina Konstruksi dalam Mengembangkan Taman Sebagai Ruang Terbuka Hijau (RTH) di Kota Medan
Taman Sebagai Ruang Terbuka Hijau (RTH) memiliki banyak manfaat seperti mengurangi dampak permasalahan lingkungan, memperindah lingkungan kota, dan cadangan oksigen. Dinas Sumber D...
Analysis of Road Conditions Using the PCI and Bina Marga Methods on the Sanggau-Sekadau Section, West Kalimantan
Analysis of Road Conditions Using the PCI and Bina Marga Methods on the Sanggau-Sekadau Section, West Kalimantan
ABSTRACT Purpose: This study aims to analyze the types of damage occurring on the national road section of the Sanggau-Sekadau city boundary and to determine the pavement condition...
KINERJA MODEL PERKERASAN JALAN DENGAN BLOK PENGAKU
KINERJA MODEL PERKERASAN JALAN DENGAN BLOK PENGAKU
One of the factors causing the cracking of rigid pavement surfaces for roadways is the occurrence of tensile stresses due to vehicle wheel loads that exceed the tensile stresses of...
Decision-making system and verification of pavement diseases treatment scheme for highway reconstruction and extension
Decision-making system and verification of pavement diseases treatment scheme for highway reconstruction and extension
Abstract Based on the case of a highway reconstruction and extension project in Guangdong Province, a decision-making system for the treatment of the old pavement...
Kinerja Pemeliharaan Jalan Kabupaten Pada Dinas Bina Marga dan Pengairan Kabupaten Subang
Kinerja Pemeliharaan Jalan Kabupaten Pada Dinas Bina Marga dan Pengairan Kabupaten Subang
Tujuan dilakukannya penulisan adalah untuk mengetahui Kinerja Pemeliharaan Jalan Kabupaten Pada Dina Bina Marga dan Pengairan Kabupaten Subang, selain itu untuk mengetahui faktor-f...

Back to Top