Javascript must be enabled to continue!
CPT Stinger - An Innovative Method to Obtain CPT Data for Integrated Geoscience Studies
View through CrossRef
Abstract
A new deepwater static cone penetrometer system, " CPT Stinger??, was used to investigate subsurface conditions at a number of production sites in the deepwater Gulf of Mexico. Same site high-resolution geophysical data and long cores obtained with a Jumbo Piston Core (JPC) system illustrate the excellent correlation obtained with continuous geotechnical and geophysical data for defining the spatial variation in soil properties.
The high cost of drilling deepwater borings and sampling at widely spaced intervals imposes a significant constraint on obtaining a sufficient quantity of high quality soils data. Thus, improved methods are desirable for more quickly assessing requisite soil properties without sacrificing accuracy. The " CPT Stinger?? system is a new tool that can fill this role.
This new system allows the same general suite of JPC coring equipment to be modified for CPT testing and can be deployed from an oilfield supply vessel. By simply replacing the standard piston core liner with a CPT system containing thrusting rods, a power/control module, and CPT data logging system, the field operation can quickly be converted from sampling to in situ testing mode. The results show that the new system provides continuous soundings with centimeter-depth accuracy and stratigraphic consistency. In addition to the acquisition of high-quality static CPT data, the sampling rate of the CPT logger allows the acquisition of dynamic CPT data during free fall that can be adjusted for velocity differences to emulate static data
A particularly effective way to use the system is in conjunction with nearby, continuous sampling with JPC cores and subbottom seismic profiles. This allows the correlation of the CPT results with strengths from continuous samples over a significant depth of overlap and with the geophysical cross sections. Correlations are presented in the paper for undrained shear strength data from long cores with insitu CPT data. Following the premise that more information acquired for a given budget tends to reduce the risks associated with foundation design and installation planning, the economic benefits of rapidly acquiring the geotechnical data from a lower cost vessel are also discussed.
Introduction
The high cost of deepwater oil and gas developments has focused much attention on fast tracking these projects from discovery to production. An integrated geologic/geotechnical study including the " CPT Stinger?? system provides an opportunity to characterize subsurface conditions in a cost effective manner. In contrast, the high cost of drilling deepwater rotary borings that sample at widely spaced intervals tends to limit the opportunity to acquire a sufficient quantity of high quality soils data to fully understand the site.
Background
The importance of conducting integrated geoscience (geologic/geotechnical) studies for deepwater developments has been clearly described by Campbell et al. (1988)1 and Young and Kasch (2011)2. The three-dimensional integrated geoscience (geologic/geotechnical) model must be defined early to serve as a basis for planning the architecture of production facilities. The model serves to better understand the constraints imposed by:geologic conditions and geo-hazards,subsurface stratigraphy and its spatial variability, and variable soil profiles and geotechnical properties.
The resulting goal of the integrated geoscience model is to select facility sites with favorable conditions such as those with uniform geologic/geotechnical conditions and those most conducive to safe operations of planned seafloor supported structures.
Title: CPT Stinger - An Innovative Method to Obtain CPT Data for Integrated Geoscience Studies
Description:
Abstract
A new deepwater static cone penetrometer system, " CPT Stinger??, was used to investigate subsurface conditions at a number of production sites in the deepwater Gulf of Mexico.
Same site high-resolution geophysical data and long cores obtained with a Jumbo Piston Core (JPC) system illustrate the excellent correlation obtained with continuous geotechnical and geophysical data for defining the spatial variation in soil properties.
The high cost of drilling deepwater borings and sampling at widely spaced intervals imposes a significant constraint on obtaining a sufficient quantity of high quality soils data.
Thus, improved methods are desirable for more quickly assessing requisite soil properties without sacrificing accuracy.
The " CPT Stinger?? system is a new tool that can fill this role.
This new system allows the same general suite of JPC coring equipment to be modified for CPT testing and can be deployed from an oilfield supply vessel.
By simply replacing the standard piston core liner with a CPT system containing thrusting rods, a power/control module, and CPT data logging system, the field operation can quickly be converted from sampling to in situ testing mode.
The results show that the new system provides continuous soundings with centimeter-depth accuracy and stratigraphic consistency.
In addition to the acquisition of high-quality static CPT data, the sampling rate of the CPT logger allows the acquisition of dynamic CPT data during free fall that can be adjusted for velocity differences to emulate static data
A particularly effective way to use the system is in conjunction with nearby, continuous sampling with JPC cores and subbottom seismic profiles.
This allows the correlation of the CPT results with strengths from continuous samples over a significant depth of overlap and with the geophysical cross sections.
Correlations are presented in the paper for undrained shear strength data from long cores with insitu CPT data.
Following the premise that more information acquired for a given budget tends to reduce the risks associated with foundation design and installation planning, the economic benefits of rapidly acquiring the geotechnical data from a lower cost vessel are also discussed.
Introduction
The high cost of deepwater oil and gas developments has focused much attention on fast tracking these projects from discovery to production.
An integrated geologic/geotechnical study including the " CPT Stinger?? system provides an opportunity to characterize subsurface conditions in a cost effective manner.
In contrast, the high cost of drilling deepwater rotary borings that sample at widely spaced intervals tends to limit the opportunity to acquire a sufficient quantity of high quality soils data to fully understand the site.
Background
The importance of conducting integrated geoscience (geologic/geotechnical) studies for deepwater developments has been clearly described by Campbell et al.
(1988)1 and Young and Kasch (2011)2.
The three-dimensional integrated geoscience (geologic/geotechnical) model must be defined early to serve as a basis for planning the architecture of production facilities.
The model serves to better understand the constraints imposed by:geologic conditions and geo-hazards,subsurface stratigraphy and its spatial variability, and variable soil profiles and geotechnical properties.
The resulting goal of the integrated geoscience model is to select facility sites with favorable conditions such as those with uniform geologic/geotechnical conditions and those most conducive to safe operations of planned seafloor supported structures.
Related Results
Vessel/Stinger/Pipeline Fully Coupled Analysis for Pipelaying Operation
Vessel/Stinger/Pipeline Fully Coupled Analysis for Pipelaying Operation
Abstract
During pipelaying operations, dynamic performance of the stinger due to vessel motion has a strong impact on the stinger capacity estimation. However, the c...
Stinger Structural Analysis Using Fully Coupled Model for Pipelay Operations
Stinger Structural Analysis Using Fully Coupled Model for Pipelay Operations
Abstract
With the growing demands and increasing challenges in deep-water pipeline installation, it is increasingly important to optimize stinger capacity assessment...
Examining practicality of current procedural terminology standard codes for privacy of patients at Rwanda Military Referral and Teaching Hospital and Legacy Clinics
Examining practicality of current procedural terminology standard codes for privacy of patients at Rwanda Military Referral and Teaching Hospital and Legacy Clinics
ABSTRACT
BACKGROUND
Emphasizing the critical role of standardized codes in modern healthcare systems, particul...
Regulation of carnitine palmitoyltransferase in vivo by glucagon and insulin
Regulation of carnitine palmitoyltransferase in vivo by glucagon and insulin
Carnitine palmitoyltransferase (CPT total) activity and synthesis increase in states where the insulin/glucagon ratio is low, such as starvation and diabetes [Brady & Brady (19...
Total Pipelaying System Dynamics
Total Pipelaying System Dynamics
ABSTRACT
A method is presented here for predicting the dynamic responses of a total pipelaying system undergoing excitations from high sea states and vessel motio...
Regulation of Carnitine Palmitoyltransferase Synthesis in Spontaneously Diabetic BB Wistar Rats
Regulation of Carnitine Palmitoyltransferase Synthesis in Spontaneously Diabetic BB Wistar Rats
The long-term regulation of hepatic mitochondrial carnitine palmitoyltransferase (CPT) was studied in control, insulin-treated, and untreated spontaneously diabetic BB Wistar rats....
The Casing Cage Concept For Deepwater Structures
The Casing Cage Concept For Deepwater Structures
ABSTRACT
This paper introduces the casing cage concept and discusses the feasibility of using a casing cage to provide lateral support to the well system casings ...
Jiawei Xianglian Decoction (JWXLD), a Traditional Chinese Medicine (TCM), Alleviates CPT‐11‐Induced Diarrhea in Mice
Jiawei Xianglian Decoction (JWXLD), a Traditional Chinese Medicine (TCM), Alleviates CPT‐11‐Induced Diarrhea in Mice
Irinotecan (CPT‐11) is used for therapy of various cancers. However, it has several serious adverse reactions such as diarrhea which is caused by SN‐38, the active form of CPT‐11. ...

