Abstract
This paper provides technical feedback of a successful use of Directional Casing While Drilling (D-CwD), a technique allowing to simultaneously drill and case the hole while following the directional plan. It highlights how substantial gains were realized on Badamyar project in Myanmar, having benefited from the D-CwD technique to optimize the architecture.
The Badamyar development campaign involved the drilling of four horizontal gas wells in conventional offshore environment in Myanmar. Other regional wells had already experienced wellbore issues to get the 13 3/8″ casing vertically to 450m. On Badamyar, drilling directly with the casing allowed to minimize operational exposure to losses and wellbore instability, and to achieve the challenge to get the 13 3/8″ to 800m and 45deg inclination, avoiding the requirement for an additional surface casing.
All four 13 3/8" sections were successfully directionally casing-drilled and cemented in fourteen days within budget duration, which, despite the additional complexity, is comparable to the best performance in the block in the last twenty years. The average Rate of Penetration was 30 m/hr, same as fastest conventional case in the field, without mentioning the huge advantage that when reaching the required depth, the casing is already in the hole. Indeed, once the casing has reached the required depth, drill pipe is run inside the casing to unlatch and recover the directional BHA, and pull it back to surface, leaving the casing in place ready for the cement job. While conventionally, casing still needs to be run with associated time and risks (losses, wellbore stability, stuck casing, accidental side-track, etc…).
This Directional-CwD was a new concept to most of the teams involved: Operator, Rig contractor and Tubular Running Services. It required changing the "hundred and thirty years of conventional drill-pipe drilling" mindset. This paper describes the decision making process to switch from conventional to casing-drilling, the preparation phase where risks were identified and mitigated, as well as the excellent operational results.
This paper, by presenting a successful first implementation within a major O&G company, brings to the drilling industry an additional case that the system works, is technically fit-for purpose, cost effective, and has the tremendous potential to replace conventional drilling in several applications. It also highlights some potential limits and opportunities for optimization which should be considered for further development (trajectory constraints, fatigue life and well control).
Title: Successful Use of Directional Casing While Drilling
Description:
Abstract
This paper provides technical feedback of a successful use of Directional Casing While Drilling (D-CwD), a technique allowing to simultaneously drill and case the hole while following the directional plan.
It highlights how substantial gains were realized on Badamyar project in Myanmar, having benefited from the D-CwD technique to optimize the architecture.
The Badamyar development campaign involved the drilling of four horizontal gas wells in conventional offshore environment in Myanmar.
Other regional wells had already experienced wellbore issues to get the 13 3/8″ casing vertically to 450m.
On Badamyar, drilling directly with the casing allowed to minimize operational exposure to losses and wellbore instability, and to achieve the challenge to get the 13 3/8″ to 800m and 45deg inclination, avoiding the requirement for an additional surface casing.
All four 13 3/8" sections were successfully directionally casing-drilled and cemented in fourteen days within budget duration, which, despite the additional complexity, is comparable to the best performance in the block in the last twenty years.
The average Rate of Penetration was 30 m/hr, same as fastest conventional case in the field, without mentioning the huge advantage that when reaching the required depth, the casing is already in the hole.
Indeed, once the casing has reached the required depth, drill pipe is run inside the casing to unlatch and recover the directional BHA, and pull it back to surface, leaving the casing in place ready for the cement job.
While conventionally, casing still needs to be run with associated time and risks (losses, wellbore stability, stuck casing, accidental side-track, etc…).
This Directional-CwD was a new concept to most of the teams involved: Operator, Rig contractor and Tubular Running Services.
It required changing the "hundred and thirty years of conventional drill-pipe drilling" mindset.
This paper describes the decision making process to switch from conventional to casing-drilling, the preparation phase where risks were identified and mitigated, as well as the excellent operational results.
This paper, by presenting a successful first implementation within a major O&G company, brings to the drilling industry an additional case that the system works, is technically fit-for purpose, cost effective, and has the tremendous potential to replace conventional drilling in several applications.
It also highlights some potential limits and opportunities for optimization which should be considered for further development (trajectory constraints, fatigue life and well control).
Related Results
Casing Drilling with Retrievable Drilling Assemblies
Casing Drilling with Retrievable Drilling Assemblies
Abstract
Retrievable Casing Drilling* tools have been used to drill more than 600,000 ft of hole in over 120 wells encompassing six casing sizes ranging from 4-1/...
The Casing Cage Concept For Deepwater Structures
The Casing Cage Concept For Deepwater Structures
ABSTRACT
This paper introduces the casing cage concept and discusses the feasibility of using a casing cage to provide lateral support to the well system casings ...
Top Drive Casing Running:Challenges and Solutions
Top Drive Casing Running:Challenges and Solutions
Abstract
Opportunity to improve rig floor safety, reduce technical casing running risk and reduce cost has motivated operators to utilise the top drive for casing...
Casing Centralization—Planned Compared to Actual: A Kuwait Case Study
Casing Centralization—Planned Compared to Actual: A Kuwait Case Study
Abstract
Several reasons can contribute to poor cementation; however, proper casing centralization can lead to uniform mud displacement with cement and can mitigate ...
Effect of Sand Production on Casing Integrity
Effect of Sand Production on Casing Integrity
Abstract
This paper documents an engineering study on sand production and its aftermaths on casing damage. Many wells were converted from production to water inje...
Complication Circumstance Directional and Horizontal Wells Drilling Technology in Iran
Complication Circumstance Directional and Horizontal Wells Drilling Technology in Iran
Abstract
Directional drilling technology has been applied widely since the last century. Directional tools and directional drilling technology shall be applicable to...
Recent Developments In Drilling Fluid Technology
Recent Developments In Drilling Fluid Technology
Drilling Technology has been continuously faced with new problems in drilling deeper and more difficult holes. A major problem is excessive friction caused by unstable hole conditi...
Deep Directional Drilling
Deep Directional Drilling
Abstract
The continuation of deep drilling has expanded the application for directional drilling to near commonplace proportions. Since 1968, there has been a ste...