Javascript must be enabled to continue!
NEED FOR SIGNS ON THE SEGARA ANAKAN RIVER, CILACAP REGENCY
View through CrossRef
The Segara Anakan River is a shipping channel with a channel length of 17.8 miles that serves the Seleko – Kampung Laut Route in Cilacap Regency. The condition of shipping flows in Segara Anakan is irregular due to the lack of river signs as a means of regulating traffic to create safe, secure and smooth river transportation. This research aims to determine the number of river signs needed and evaluate existing river signs. This research was carried out by reviewing field conditions and then conducting qualitative descriptive analysis in accordance with Perditjenhubdat Number: KP. 4755 / AP005 / DRJD / 2020 concerning Technical Guidelines for River and Lake Signs. Conditions in the field are that the number of signs installed is 5 compared to the supposed number of 9. The research conclusion is that the number of river signs needed in the Segara Anakan channel is 25 signs with details of 6 prohibitive signs, 3 mandatory signs, 2 warning signs. The required river signs must meet technical specifications in accordance with applicable regulations both in terms of size of sign leaves, sign poles and manufacturing materials.
Sekolah Tinggi Ilmu Pelayaran - STIP - Jakarta
Title: NEED FOR SIGNS ON THE SEGARA ANAKAN RIVER, CILACAP REGENCY
Description:
The Segara Anakan River is a shipping channel with a channel length of 17.
8 miles that serves the Seleko – Kampung Laut Route in Cilacap Regency.
The condition of shipping flows in Segara Anakan is irregular due to the lack of river signs as a means of regulating traffic to create safe, secure and smooth river transportation.
This research aims to determine the number of river signs needed and evaluate existing river signs.
This research was carried out by reviewing field conditions and then conducting qualitative descriptive analysis in accordance with Perditjenhubdat Number: KP.
4755 / AP005 / DRJD / 2020 concerning Technical Guidelines for River and Lake Signs.
Conditions in the field are that the number of signs installed is 5 compared to the supposed number of 9.
The research conclusion is that the number of river signs needed in the Segara Anakan channel is 25 signs with details of 6 prohibitive signs, 3 mandatory signs, 2 warning signs.
The required river signs must meet technical specifications in accordance with applicable regulations both in terms of size of sign leaves, sign poles and manufacturing materials.
Related Results
POPULASI, SEBARAN DAN POTENSI EKONOMI SEDIAAN ANAKAN JENIS DIPTEROKARPA DI HUTAN CIGERENDENG
POPULASI, SEBARAN DAN POTENSI EKONOMI SEDIAAN ANAKAN JENIS DIPTEROKARPA DI HUTAN CIGERENDENG
Regenerasi alami tanaman dipterokarpa di Hutan Cigerendeng adalah bentuk usaha tumbuhan menjaga kelangsungan hidup agar tidak mengalami kepunahan. Penelitian ini bertujuan untuk me...
The Mangrove Landscape and Zonation following Soil Properties and Water Inundation Distribution in Segara Anakan Cilacap
The Mangrove Landscape and Zonation following Soil Properties and Water Inundation Distribution in Segara Anakan Cilacap
The mangrove zoning and landscape express the correlation between mangrove vegetation (density, biodiversity and species distribution) with environment factors like as water inunda...
REFLEKSI NILAI SEGARA KERTHI DALAM GAME SEGARA WATCH SEBAGAI MEDIA EDUKASI
REFLEKSI NILAI SEGARA KERTHI DALAM GAME SEGARA WATCH SEBAGAI MEDIA EDUKASI
Perkembangan teknologi informasi dan komunikasi telah membuka pintu menuju berbagai inovasi pendidikan, dan salah satu inovasi yang menonjol adalah penggunaan permainan video sebag...
Edukasi Pemanfaatan Cagar Budaya Kabupaten Cilacap Melalui Program Sporturism Tahun 2022
Edukasi Pemanfaatan Cagar Budaya Kabupaten Cilacap Melalui Program Sporturism Tahun 2022
Education on the use of cultural heritage in Cilacap Regency through the sporturism program is a sports activity that combines and introduces tourism in a country or region. The us...
BATIMETRI, POLA ARUS DAN PERUBAHAN GARIS PANTAI DI SAGARA ANAKAN, CILACAP
BATIMETRI, POLA ARUS DAN PERUBAHAN GARIS PANTAI DI SAGARA ANAKAN, CILACAP
Sedimentasi yang dicirikan oleh pertumbuhan pulau-pulau baru dan daratan di Sagara Anakan, setidaknya sejak tahun 1944 hingga sekarang, berawal dari proses pasang surut yang terjad...
APLIKASI AYO WISATA KE CILACAP DALAM BAHASA MANDARIN DI DINAS PEMUDA OLAHRAGA DAN PARIWISATA
APLIKASI AYO WISATA KE CILACAP DALAM BAHASA MANDARIN DI DINAS PEMUDA OLAHRAGA DAN PARIWISATA
This article is entitled "Application for Ayo Wisata to Cilacap in Mandarin at the Department of Youth, Sports and Tourism of Cilacap Regency". This application is only available i...
Flodfund - Bronzealderdeponeringer fra Gudenåen
Flodfund - Bronzealderdeponeringer fra Gudenåen
River findsBronze Age metalwork from the river GudenåBronze Age metalwork (primarily swords and other weapons) found in European rivers has aroused interest for many years, but lit...

