Breaking ERD Records with Optimized Engineering and Practices: Making the Impossible Possible
View through CrossRef
Abstract
Long-extended reach drilling (ERD) well has become necessary to reach untapped resources. This paper will describe pre-planning, execution and post results of drilling ERD wells with large bore design of 12¼" as the main step out section and deploying 9⅝" casing on shallow TVD of 4,200’. Progressive increase of the ERD ratio and complexity from one well to the next was planned and executed till we reached the longest well deploying 8 KM of 9⅝" casing with 5.4 ERD ratio at 26,179' TD horizontally all the way.
A learning curve was established on drilled wells while progressively increasing reach and complexity. Subject well was the longest of any well planned in the field by far. Success involved implementation of technically modeled engineered solutions and verified during execution. Operational procedures including but not limited to: proper planning and execution of well profile to ensure optimum placement in a specific formation and minimum side forces. Drilling and tripping procedures to ensure the lowest friction factor (FF) and allow drilling to target depth (TD) with optimum rig capability. Engineered solution for casing running technologies, which involved rotation and conventional running and floatation.
The longest ERD well was drilled to 26,179' TD with field ROP record in 12¼" hole section, maintaining very good hole quality proved by smooth bit trips out of hole and the final trip at TD on elevators. Hole cleaning and fluids strategy was developed and executed efficiently to measure FFs as low as possible for successful 9⅝" deployment. Engineered solution was proposed for 9⅝" deployment and was successfully trial tested on a shorter well to validate simulations. Casing rotation FFs came close to the modeled FFs. The 9⅝" Casing was deployed to bottom as planned and the cement job was performed successfully. Various records were achieved: the subject well achieved the deepest 9⅝" horizontal casing, the deepest 12¼" horizontal at TVD shallower than 5,000'. The longest 12¼" horizontal open hole at TVD shallower than 5,000' with section footage of 16,164'. The 9⅝" casing was deployed as a long string, eliminating the cost and challenges of a liner hanger and the need for a future tieback and also keeping hole sizes available for main and contingency sections to drill the reservoirs ahead.
In addition to existing developed procedures and practices for ERD wells, subject well was dealing with the challenge of drilling a long 12 ¼" hole with a torque limitation of 30K lbsf.ft on TDS, and 4200 psi on surface equipment, and running the longest casing horizontally at such a shallow TVD, which is being done the first time globally. The success proved that challenging ERD wells can be drilled with optimum investments on rig capabilities.
Title: Breaking ERD Records with Optimized Engineering and Practices: Making the Impossible Possible
Description:
Abstract
Long-extended reach drilling (ERD) well has become necessary to reach untapped resources.
This paper will describe pre-planning, execution and post results of drilling ERD wells with large bore design of 12¼" as the main step out section and deploying 9⅝" casing on shallow TVD of 4,200’.
Progressive increase of the ERD ratio and complexity from one well to the next was planned and executed till we reached the longest well deploying 8 KM of 9⅝" casing with 5.
4 ERD ratio at 26,179' TD horizontally all the way.
A learning curve was established on drilled wells while progressively increasing reach and complexity.
Subject well was the longest of any well planned in the field by far.
Success involved implementation of technically modeled engineered solutions and verified during execution.
Operational procedures including but not limited to: proper planning and execution of well profile to ensure optimum placement in a specific formation and minimum side forces.
Drilling and tripping procedures to ensure the lowest friction factor (FF) and allow drilling to target depth (TD) with optimum rig capability.
Engineered solution for casing running technologies, which involved rotation and conventional running and floatation.
The longest ERD well was drilled to 26,179' TD with field ROP record in 12¼" hole section, maintaining very good hole quality proved by smooth bit trips out of hole and the final trip at TD on elevators.
Hole cleaning and fluids strategy was developed and executed efficiently to measure FFs as low as possible for successful 9⅝" deployment.
Engineered solution was proposed for 9⅝" deployment and was successfully trial tested on a shorter well to validate simulations.
Casing rotation FFs came close to the modeled FFs.
The 9⅝" Casing was deployed to bottom as planned and the cement job was performed successfully.
Various records were achieved: the subject well achieved the deepest 9⅝" horizontal casing, the deepest 12¼" horizontal at TVD shallower than 5,000'.
The longest 12¼" horizontal open hole at TVD shallower than 5,000' with section footage of 16,164'.
The 9⅝" casing was deployed as a long string, eliminating the cost and challenges of a liner hanger and the need for a future tieback and also keeping hole sizes available for main and contingency sections to drill the reservoirs ahead.
In addition to existing developed procedures and practices for ERD wells, subject well was dealing with the challenge of drilling a long 12 ¼" hole with a torque limitation of 30K lbsf.
ft on TDS, and 4200 psi on surface equipment, and running the longest casing horizontally at such a shallow TVD, which is being done the first time globally.
The success proved that challenging ERD wells can be drilled with optimum investments on rig capabilities.
Related Results
Planning and Execution of MRC / ERD Well with Slim Lower Completion PPL in Al Nouf Field, Abu Dhabi, UAE
Planning and Execution of MRC / ERD Well with Slim Lower Completion PPL in Al Nouf Field, Abu Dhabi, UAE
Abstract
Well was drilled in Al Nouf field with the objective to support the pressure sustainability of multiple producer wells across Shuaiba-1 formation based on M...
Anxiety and depression in patients with gastroesophageal reflux disorder
Anxiety and depression in patients with gastroesophageal reflux disorder
IntroductionEvidence shows an influence relationship between described symptoms of gastroesophageal reflux disorder (GERD) and emotional state.Objectives/aimsThe current study aime...
Movement-related beta ERD and ERS abnormalities in neuropsychiatric disorders
Movement-related beta ERD and ERS abnormalities in neuropsychiatric disorders
Movement-related oscillations in the beta range (from 13 to 30 Hz) have been observed over sensorimotor areas with power decrease (i.e., event-related desynchronization, ERD) durin...
Impossible Worlds
Impossible Worlds
Impossible worlds constitute an increasingly popular yet controversial topic in logic and metaphysics. The term “impossible worlds” parallels the term “possible worlds” and commonl...
Simulation and Experimental Study of the Rock Breaking Mechanism of Personalized Polycrystalline Diamond Compact Bits
Simulation and Experimental Study of the Rock Breaking Mechanism of Personalized Polycrystalline Diamond Compact Bits
Rock breaking is a complex physical process that can be influenced by various factors, such as geometrical shape and cutting angle of rock breaking tools. Experimental study of the...
Interpersonal Emotion Regulation as Source of Positive Relationship Perceptions: The Role of Emotion Regulation Dependence
Interpersonal Emotion Regulation as Source of Positive Relationship Perceptions: The Role of Emotion Regulation Dependence
The current research unveils a novel mechanism through which interpersonal emotion regulation enhances romantic relationship quality and affective experience. Across three studies,...
New Records of Extended Reach Drilling in China Offshore
New Records of Extended Reach Drilling in China Offshore
Abstract
More than just providing an overview of the longest extended reach drilling (ERD) well recently accomplished in China offshore, with a total depth of 9508m ...
Pushing the ERD Envelope at Wytch Farm
Pushing the ERD Envelope at Wytch Farm
Abstract
BP Exploration, operator of the Wytch Farm Oil Field, has since April 1993 been developing the offshore extension of the Sherwood Reservoir using extende...