Planning and Execution of MRC / ERD Well with Slim Lower Completion PPL in Al Nouf Field, Abu Dhabi, UAE
View through CrossRef
Abstract
Well was drilled in Al Nouf field with the objective to support the pressure sustainability of multiple producer wells across Shuaiba-1 formation based on MRC / ERD approach. This paper presents the challenges faced in planning and drilling of subject well and successfully running of slim lower completion to total measured depth of 21,000ft (6.4 km) with having horizontal section of 10,450ft (3.18 km) with directional difficulty index (DDI) of 6.520 using slim casing design.
Planning of this well commenced by meetings and collaboration with subsurface operation and reservoir team with the common objective of drilling a well of over 11,000ft horizontal extent and having a capability of running 4 ½" pre-perforated liner with multiple swell packers as lower completion to well TD of (21,000ft) across Shauiba - 1 reservoir. Purpose of lower completion are to properly control the well injectivity regime and support multiple producers across SH-1.
All the associated risks were highlighted and mitigated by proper planning and engineering analysis such as trajectory, collision risks, BHA, hydraulics and casing design.
This MRC injector well of 21,000ft MD / 8953 ft TVD (2.34 ERD H:V ratio) is the first well in the region to have 11,000ft of geo-steered 6" horizontal section with slim lower completion installed till TD of well.
This paper will explain the innovative approach of mitigating the challenges faced while drilling a complex well of 3500ft departure and have a horizontal section of over 11,000ft with 6" drainage. A few challenges like collision risk at surface & horizontal section with total losses across aquifer were major disquiet but successfully catered. Second major challenge was to run 4 ½" pre-perforated liner of 11,000ft with multiple swell packers (each 1000ft) to TD of well were immaculately mitigated with advanced engineering analysis and innovative technologies like swivel master etc.
Results from this well have proven that having lower completion in MRC / ERD wells have significantly improved the well accessibility and well performance and enhanced the reservoir management and significantly reduced the field development cost.
This paper summarizes the practice and technology used to drill successfully the MRC / ERD well in artificial island and running of slim lower completion across horizontal section till TD of well.
The challenges and its mitigation explained in this paper will support the idea of having lower completion in MRC/ERD wells which helps to stretch the reservoir boundaries and have more control on injectivity / productivity of reservoir because of proper isolation by swell packers and have maximum well accessibility across ERD horizontal section.
Title: Planning and Execution of MRC / ERD Well with Slim Lower Completion PPL in Al Nouf Field, Abu Dhabi, UAE
Description:
Abstract
Well was drilled in Al Nouf field with the objective to support the pressure sustainability of multiple producer wells across Shuaiba-1 formation based on MRC / ERD approach.
This paper presents the challenges faced in planning and drilling of subject well and successfully running of slim lower completion to total measured depth of 21,000ft (6.
4 km) with having horizontal section of 10,450ft (3.
18 km) with directional difficulty index (DDI) of 6.
520 using slim casing design.
Planning of this well commenced by meetings and collaboration with subsurface operation and reservoir team with the common objective of drilling a well of over 11,000ft horizontal extent and having a capability of running 4 ½" pre-perforated liner with multiple swell packers as lower completion to well TD of (21,000ft) across Shauiba - 1 reservoir.
Purpose of lower completion are to properly control the well injectivity regime and support multiple producers across SH-1.
All the associated risks were highlighted and mitigated by proper planning and engineering analysis such as trajectory, collision risks, BHA, hydraulics and casing design.
This MRC injector well of 21,000ft MD / 8953 ft TVD (2.
34 ERD H:V ratio) is the first well in the region to have 11,000ft of geo-steered 6" horizontal section with slim lower completion installed till TD of well.
This paper will explain the innovative approach of mitigating the challenges faced while drilling a complex well of 3500ft departure and have a horizontal section of over 11,000ft with 6" drainage.
A few challenges like collision risk at surface & horizontal section with total losses across aquifer were major disquiet but successfully catered.
Second major challenge was to run 4 ½" pre-perforated liner of 11,000ft with multiple swell packers (each 1000ft) to TD of well were immaculately mitigated with advanced engineering analysis and innovative technologies like swivel master etc.
Results from this well have proven that having lower completion in MRC / ERD wells have significantly improved the well accessibility and well performance and enhanced the reservoir management and significantly reduced the field development cost.
This paper summarizes the practice and technology used to drill successfully the MRC / ERD well in artificial island and running of slim lower completion across horizontal section till TD of well.
The challenges and its mitigation explained in this paper will support the idea of having lower completion in MRC/ERD wells which helps to stretch the reservoir boundaries and have more control on injectivity / productivity of reservoir because of proper isolation by swell packers and have maximum well accessibility across ERD horizontal section.
Related Results
Praktik Pengalaman Lapangan
Praktik Pengalaman Lapangan
<p><em>Abstrak - </em><strong>Program Pengalaman Lapangan (PPL) merupakan salah satu mata pelajaran yang harus diikuti oleh setiap mahasiswa keguruan termas...
[RETRACTED] ACV Super Slim Gummies Reviews Scam Or Legit Updated 2022 – Must-See Worth Buying? v1
[RETRACTED] ACV Super Slim Gummies Reviews Scam Or Legit Updated 2022 – Must-See Worth Buying? v1
[RETRACTED]➪ACV Super Slim Gummies - Official Website Link - Click Here To Buy❤️ ✪Product Name ➯ ACV Super Slim Gummies UK✪Main Benefits ➯ Can help you with all your overweight i...
[RETRACTED] ACV Super Slim Gummies Reviews Scam Or Legit Updated 2022 – Must-See Worth Buying? v1
[RETRACTED] ACV Super Slim Gummies Reviews Scam Or Legit Updated 2022 – Must-See Worth Buying? v1
[RETRACTED]➪ACV Super Slim Gummies - Official Website Link - Click Here To Buy❤️ ✪Product Name ➯ ACV Super Slim Gummies UK✪Main Benefits ➯ Can help you with all your overweight i...
Drilling Into Diversity: Developing the Reservoir of Talent
Drilling Into Diversity: Developing the Reservoir of Talent
Abstract
In the last few years, opportunities for women in the United Arab Emirates (UAE) have grown exponentially with professional and educational positions openin...
Evaluasi Pelaksanaan Pembimbingan Dosen Pembimbing Terhadap Mahasiswa PPL FT UNJ
Evaluasi Pelaksanaan Pembimbingan Dosen Pembimbing Terhadap Mahasiswa PPL FT UNJ
Tujuan penelitian ini adalah untuk mengevaluasi pelaksanaan bimbingan oleh dosen pembimbing PPL dalam melaksanakan bimbingannya kepada mahasiswa PPL.
Penelitian dilakukan di ...
Analisis Tanggung Jawab Pelaksanaan Praktik Pengalaman Lapangan (PPL) Mahasiswa STPKat di Santo Fransiskus Asisi Semarang
Analisis Tanggung Jawab Pelaksanaan Praktik Pengalaman Lapangan (PPL) Mahasiswa STPKat di Santo Fransiskus Asisi Semarang
Penelitian ini membahas Praktik Pengalaman Lapangan (PPL) mahasiswa. Terdapat tujuh subjek dalam penelitian ini. PPL dalam progam S-1 Pendidikan dan Pengajaran Agama Katolik bertuj...
Source Rocks of the Thamama Hydrocarbon in Abu Dhabi
Source Rocks of the Thamama Hydrocarbon in Abu Dhabi
Abstract
More than 80% of Abu Dhabi oil reserves are accumulated in the Thamama reservoirs. However, its source rock locations, thickness and richness distributions ...
From Foes to Friends: The Normalization of the United Emirates Arab and Israel Relations
From Foes to Friends: The Normalization of the United Emirates Arab and Israel Relations
Abstract
This article aims to explain the reason the United Arab Emirates (UAE) normalized ties within Israel through Abraham Accord. The normalization of the UAE-Isr...