Dual Casing Section Milling Using High Ratio Section Milling Technology to Achieve Rock to Rock Zonal Isolation
View through CrossRef
Abstract
The plug and abandon (P&A) challenges of each well are known to be different. This paper narrates unique challenges faced during the abandonment of a land well which intersected multiple over-pressured reservoirs containing high concentration of H2S and CO2. Because zonal isolation was paramount for this project, section milling was selected to enable a rock-to-rock cement plug to restore 5 critical caprocks. Remediation of annular cement was complex because all production and intermediate casings were cemented to surface with 2 or 3 casings across the caprocks. Conventional methods would entail pilot milling the 7 inch production casing, exposing the A-annulus to enable section milling of the 9.625 inch intermediate casing for a cement plug across the caprock. This technique is time consuming and uncertain, which adds to the cost and complexity of the P&A operations.
In response to these challenges, the operation was optimized utilizing both a standard section mill and a new High-Ratio Section Milling (HRSM) technology, which allows for milling windows through two casing strings. The HRSM is a combination of a high-ratio hydraulic section mill, achieving a 180% expansion ratio, and an expandable stabilizer. The orientation of the stabilizer is set to enable 6-point contact stabilization in the outer casing and helps to reduce dynamic shocks and vibrations. The HRSM is deployed after the inner 7-inch casing window has been milled for a length of approximately 140 ft. The expandable stabilizer in the system ensures that the section milling assembly can efficiently mill a 110 ft casing window in the 9.625 inch casing, through a 7 inch casing window. A high-ratio underreamer is utilized to clean the formation and enlarge the diameter to 13.5 inch to enable a rock-to-rock seal through two casing strings, without pilot milling the inner string from surface.
Milling two casing strings is done in 5 stages. The inner casing window is initiated with a dedicated run using rapid cutout knives. This allows for deployment of "flush knives" while milling the inner window, reducing the risk of skimming the outer casing and enabling a single run of 139 ft casing milled. Following a clean out run with an under reamer, the new HRSM technology was then run and completed a 111 ft of 9.625-inch casing in one run, which was followed by 100 ft of hole enlargement by a high ratio underreamer to open the hole to 13.5 inches. All of the above stages were carried out in a single run and with good ROP. The cement job was completed and the objective of restoring the cap rock seal across two strings of casing was achieved, saving rig time and cost for the plug and abandonment operation.
The development and successful deployment of HRSM technology provides a reliable solution to achieve a rock-to-rock cement plug in a dual-casing environment. During the execution phase various lessons were learnt and implemented as best practice, this included design changes of the HRSM technology and the bottom hole assembly. The combination resulted in setting new benchmarks for HRSM technology and enabled savings of 30 days rig time when compared to the conventional method of pilot milling the inner casing.
Title: Dual Casing Section Milling Using High Ratio Section Milling Technology to Achieve Rock to Rock Zonal Isolation
Description:
Abstract
The plug and abandon (P&A) challenges of each well are known to be different.
This paper narrates unique challenges faced during the abandonment of a land well which intersected multiple over-pressured reservoirs containing high concentration of H2S and CO2.
Because zonal isolation was paramount for this project, section milling was selected to enable a rock-to-rock cement plug to restore 5 critical caprocks.
Remediation of annular cement was complex because all production and intermediate casings were cemented to surface with 2 or 3 casings across the caprocks.
Conventional methods would entail pilot milling the 7 inch production casing, exposing the A-annulus to enable section milling of the 9.
625 inch intermediate casing for a cement plug across the caprock.
This technique is time consuming and uncertain, which adds to the cost and complexity of the P&A operations.
In response to these challenges, the operation was optimized utilizing both a standard section mill and a new High-Ratio Section Milling (HRSM) technology, which allows for milling windows through two casing strings.
The HRSM is a combination of a high-ratio hydraulic section mill, achieving a 180% expansion ratio, and an expandable stabilizer.
The orientation of the stabilizer is set to enable 6-point contact stabilization in the outer casing and helps to reduce dynamic shocks and vibrations.
The HRSM is deployed after the inner 7-inch casing window has been milled for a length of approximately 140 ft.
The expandable stabilizer in the system ensures that the section milling assembly can efficiently mill a 110 ft casing window in the 9.
625 inch casing, through a 7 inch casing window.
A high-ratio underreamer is utilized to clean the formation and enlarge the diameter to 13.
5 inch to enable a rock-to-rock seal through two casing strings, without pilot milling the inner string from surface.
Milling two casing strings is done in 5 stages.
The inner casing window is initiated with a dedicated run using rapid cutout knives.
This allows for deployment of "flush knives" while milling the inner window, reducing the risk of skimming the outer casing and enabling a single run of 139 ft casing milled.
Following a clean out run with an under reamer, the new HRSM technology was then run and completed a 111 ft of 9.
625-inch casing in one run, which was followed by 100 ft of hole enlargement by a high ratio underreamer to open the hole to 13.
5 inches.
All of the above stages were carried out in a single run and with good ROP.
The cement job was completed and the objective of restoring the cap rock seal across two strings of casing was achieved, saving rig time and cost for the plug and abandonment operation.
The development and successful deployment of HRSM technology provides a reliable solution to achieve a rock-to-rock cement plug in a dual-casing environment.
During the execution phase various lessons were learnt and implemented as best practice, this included design changes of the HRSM technology and the bottom hole assembly.
The combination resulted in setting new benchmarks for HRSM technology and enabled savings of 30 days rig time when compared to the conventional method of pilot milling the inner casing.
Related Results
Top Drive Casing Running:Challenges and Solutions
Top Drive Casing Running:Challenges and Solutions
Abstract
Opportunity to improve rig floor safety, reduce technical casing running risk and reduce cost has motivated operators to utilise the top drive for casing...
Karakteristik Madden-Julian Oscillation (MJO) Ketika El-Nino Southern Oscillation (ENSO)
Karakteristik Madden-Julian Oscillation (MJO) Ketika El-Nino Southern Oscillation (ENSO)
Perkembangan peristiwa El-Nino Southern Oscillation (ENSO) menunjukkan peran penting bagi Madden-Julian Oscillation (MJO). Variasi angin permukaan (UWND) dan konveksi (OLR) intramu...
Effect of Sand Production on Casing Integrity
Effect of Sand Production on Casing Integrity
Abstract
This paper documents an engineering study on sand production and its aftermaths on casing damage. Many wells were converted from production to water inje...
Sustained Casing Pressure in Offshore Producing Wells
Sustained Casing Pressure in Offshore Producing Wells
Abstract
A large number of producing wells in the OCS develop undesirable and sometimes potentially dangerous sustained pressure on one or more casing strings of ...
An Evaluation Cement Method Using Gamma-Gamma Density Imaging Logging in a Double Casing Well
An Evaluation Cement Method Using Gamma-Gamma Density Imaging Logging in a Double Casing Well
Deep wells, ultradeep wells, and some offshore oil wells are characterized by high pressure and high temperature, and their cementing casing is often prone to collapse and rupture....
Experimental and Numerical Determination of Cement Casing Microannulus
Experimental and Numerical Determination of Cement Casing Microannulus
ABSTRACT
The key to successful long term well integrity of cement-casing is to understand and investigate the hydraulic sealing of cementing annulus by detecting ...
Study on the Theory and Method of Combined Casing Wear Resistance in Deep & Ultra-Deep Well Drilling
Study on the Theory and Method of Combined Casing Wear Resistance in Deep & Ultra-Deep Well Drilling
Abstract
The high and steep structure of piedmont areas in Tarim oil field bring serious casing wear problem. Casing wear is one of the important reasons for the ...
Casing Integrity: Modeling Strength Degradation
Casing Integrity: Modeling Strength Degradation
Abstract
Casing integrity management is crucial, especially in wells experiencing severe casing wall degradation. It is highly desirable to predict the threshold pre...