Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Public Infrastructure Project Tendering Through Public Private Partnerships (PPP) – A Literature Review

View through CrossRef
Public Private Partnerships (PPP) in Malaysia have been inundated by various controversies and criticisms from the very beginning. Many of the constraints that occur in PPP projects is due to the failure in tendering stage. Bidding or tender for a PPP project is usually much more complex than a traditional public-sector project involving the appointment of top advisers and designers at a great fee in the preparation of detailed design, comprehensive planning, extensive bid documentation, and lengthy clarifications. These problems as being the reason behind several high-profile withdrawals during the early PPP tenders, resulting in some preferred bidders being selected by defaults as other competitors withdrew. Base on the above premise, this study attempts to propose PPP tendering process improvement in Malaysian construction industry. This paper aims at providing an overview about literature on tendering process in PPP/PFI. The objectives of the research are to identify and understand the PPP implementation practices in Malaysia; to determine issues and challenges in PPP tendering stage; and to propose PPP tendering improvement. The approach is based on the analysis of the pertinent publications on the theme. Three main interest areas can be found in the literature which is; tendering procedure, issues and challenges, and strategies that could be enhance PPP tendering process in the Malaysian construction industry.
Title: Public Infrastructure Project Tendering Through Public Private Partnerships (PPP) – A Literature Review
Description:
Public Private Partnerships (PPP) in Malaysia have been inundated by various controversies and criticisms from the very beginning.
Many of the constraints that occur in PPP projects is due to the failure in tendering stage.
Bidding or tender for a PPP project is usually much more complex than a traditional public-sector project involving the appointment of top advisers and designers at a great fee in the preparation of detailed design, comprehensive planning, extensive bid documentation, and lengthy clarifications.
These problems as being the reason behind several high-profile withdrawals during the early PPP tenders, resulting in some preferred bidders being selected by defaults as other competitors withdrew.
Base on the above premise, this study attempts to propose PPP tendering process improvement in Malaysian construction industry.
This paper aims at providing an overview about literature on tendering process in PPP/PFI.
The objectives of the research are to identify and understand the PPP implementation practices in Malaysia; to determine issues and challenges in PPP tendering stage; and to propose PPP tendering improvement.
The approach is based on the analysis of the pertinent publications on the theme.
Three main interest areas can be found in the literature which is; tendering procedure, issues and challenges, and strategies that could be enhance PPP tendering process in the Malaysian construction industry.

Related Results

Evaluating the Science to Inform the Physical Activity Guidelines for Americans Midcourse Report
Evaluating the Science to Inform the Physical Activity Guidelines for Americans Midcourse Report
Abstract The Physical Activity Guidelines for Americans (Guidelines) advises older adults to be as active as possible. Yet, despite the well documented benefits of physical a...
The Readiness of the Malaysian Construction Industry for E-tendering After COVID-19 Pandemic
The Readiness of the Malaysian Construction Industry for E-tendering After COVID-19 Pandemic
E-tendering implementation can bring significant benefits such as cost savings, transparency in contract and maximize the efficiency and resources to the construction industry. E-t...
Assessment of Factors Affecting Contractors Tendering Success for Construction Projects in North-Central Nigeria
Assessment of Factors Affecting Contractors Tendering Success for Construction Projects in North-Central Nigeria
The challenge of construction tendering process is a common theme in developing countries especially Nigeria. Tendering process is often tedious, multitasking and complex. Contract...
Performance Evaluation of Triple-Frequency GPS/Galileo Techniques for Precise Static and Kinematic Applications
Performance Evaluation of Triple-Frequency GPS/Galileo Techniques for Precise Static and Kinematic Applications
The objective of this research was to develop new precise point positioning (PPP) processing models using triple-frequency GPS/Galileo observations. Different triple-frequency PPP ...
Acquiring Technology Through Tendering- Challenges
Acquiring Technology Through Tendering- Challenges
ABSTRACT In a technology intensive industry like ours – Petroleum Industry, Technology is acquired for commercial benefits, technical enhancement, environment protec...
THE IMPLEMENTATION OF E-TENDERING: THE CLIENTS’ PERSPECTIVE
THE IMPLEMENTATION OF E-TENDERING: THE CLIENTS’ PERSPECTIVE
In construction industry, the most critical phases throughout the project life cycle is tendering phase. The traditional tendering method is often costly which involved paper inten...
Comparison of RT-PPP and RT-PPP-AR Methods
Comparison of RT-PPP and RT-PPP-AR Methods
The Precise Point Positioning (PPP) is an absolute positioning method which emerged as an alternative to the relative positioning method. This method is widely used in many applica...

Back to Top