Assessment of Factors Affecting Contractors Tendering Success for Construction Projects in North-Central Nigeria

View through CrossRef
The challenge of construction tendering process is a common theme in developing countries especially Nigeria. Tendering process is often tedious, multitasking and complex. Contractors have the responsibility of tendering appropriately for construction projects; and clients as well as consultants have a duty to create an enabling platform for a successful tendering process. This study examines the factors affecting contractors tendering success for construction projects in North-Central Nigeria with an aim to harmonizing the perception of the construction professionals. Semi-structured questionnaires comprising of fifty-five (55) questions retrieved from literature were categorized into six (6) groups which are project characteristics, business benefits, capabilities, bidding situation, client related factors and external environment related factors. The data were retrieved from 299 respondents out of 384 respondents requisite for this study. Frequency, Percentile and Mean Index Score (MIS) were used to analyze the responses. Results indicated a level of agreement among the stakeholders on the top eleven (11) contractors tendering success factors and concludes that expansion of organization expertise, tendering capabilities, flexibility for changes and variations, number of competitors, project difficulties, design constructability, project methodology, tender document detailing, client reputation, involvement of other parties and political consideration to be the top factors affecting contractors tendering success. The practical implication of this is that, there is a broader understanding of the topmost factors affecting contractors tendering success among the stakeholders within the North-Central region of Nigeria. The study recommended that reasonably sufficient time should be given to examine project characteristic in order for the contractors to assess their suitability for every construction projects they intend to tender for. Furthermore, construction design approach, bidding process and project methodology should be properly delineated to all the stakeholders by the client to eliminate vagueness in the tendering process and subsequently, project delivery process.
Title: Assessment of Factors Affecting Contractors Tendering Success for Construction Projects in North-Central Nigeria
Description:
The challenge of construction tendering process is a common theme in developing countries especially Nigeria.
Tendering process is often tedious, multitasking and complex.
Contractors have the responsibility of tendering appropriately for construction projects; and clients as well as consultants have a duty to create an enabling platform for a successful tendering process.
This study examines the factors affecting contractors tendering success for construction projects in North-Central Nigeria with an aim to harmonizing the perception of the construction professionals.
Semi-structured questionnaires comprising of fifty-five (55) questions retrieved from literature were categorized into six (6) groups which are project characteristics, business benefits, capabilities, bidding situation, client related factors and external environment related factors.
The data were retrieved from 299 respondents out of 384 respondents requisite for this study.
Frequency, Percentile and Mean Index Score (MIS) were used to analyze the responses.
Results indicated a level of agreement among the stakeholders on the top eleven (11) contractors tendering success factors and concludes that expansion of organization expertise, tendering capabilities, flexibility for changes and variations, number of competitors, project difficulties, design constructability, project methodology, tender document detailing, client reputation, involvement of other parties and political consideration to be the top factors affecting contractors tendering success.
The practical implication of this is that, there is a broader understanding of the topmost factors affecting contractors tendering success among the stakeholders within the North-Central region of Nigeria.
The study recommended that reasonably sufficient time should be given to examine project characteristic in order for the contractors to assess their suitability for every construction projects they intend to tender for.
Furthermore, construction design approach, bidding process and project methodology should be properly delineated to all the stakeholders by the client to eliminate vagueness in the tendering process and subsequently, project delivery process.

Related Results

The Readiness of the Malaysian Construction Industry for E-tendering After COVID-19 Pandemic
The Readiness of the Malaysian Construction Industry for E-tendering After COVID-19 Pandemic
E-tendering implementation can bring significant benefits such as cost savings, transparency in contract and maximize the efficiency and resources to the construction industry. E-t...
Acquiring Technology Through Tendering- Challenges
Acquiring Technology Through Tendering- Challenges
ABSTRACT In a technology intensive industry like ours – Petroleum Industry, Technology is acquired for commercial benefits, technical enhancement, environment protec...
THE IMPLEMENTATION OF E-TENDERING: THE CLIENTS’ PERSPECTIVE
THE IMPLEMENTATION OF E-TENDERING: THE CLIENTS’ PERSPECTIVE
In construction industry, the most critical phases throughout the project life cycle is tendering phase. The traditional tendering method is often costly which involved paper inten...
Assessment of competitive tendering methods of procuring educational building projects in Nigeria
Assessment of competitive tendering methods of procuring educational building projects in Nigeria
PurposeThe purpose of this paper is to assess educational building projects with a view to determining the level of utilization of competitive tendering methods, factors influencin...
Public Infrastructure Project Tendering Through Public Private Partnerships (PPP) – A Literature Review
Public Infrastructure Project Tendering Through Public Private Partnerships (PPP) – A Literature Review
Public Private Partnerships (PPP) in Malaysia have been inundated by various controversies and criticisms from the very beginning. Many of the constraints that occur in PPP project...
E-Tendering Adoption in the Malaysian Construction Industry: Contractors’ Perspectives on Benefits, Challenges and Solutions
E-Tendering Adoption in the Malaysian Construction Industry: Contractors’ Perspectives on Benefits, Challenges and Solutions
The conventional paper-based tendering method commonly used by contractors in the Malaysian construction industry has several shortcomings, such as limited transparency and excessi...
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Economic growth of any country depends on the construction projects and industry in the region. Therefore, the construction industry in Pakistan is directly related to quality and ...
Utilizing the innovation potential of suppliers in construction projects
Utilizing the innovation potential of suppliers in construction projects
Purpose The manufacturers of construction components and materials are the suppliers in construction projects, and represent a significant portion of their value. However, their kn...