Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

An Integrated Approach to Improve Drilling Performance and Save Cost in North Azadegan Field

View through CrossRef
Abstract Although some wells from other exploration and development projects in onshore Iran have been finished before, there is a big challenge for North Azadegan field to drill 58 wells in less than 3 years, with more than 8 upgraded 2000HP rigs in the marshy area under the economic sanction surrounding according to strict requirements of Buy-Back development contract. Moreover, operation area with average 2m water depth, about 2000m directional length section accompanied with narrow mud density window, violently fluctuations in rock strength and complete losses during cementing have also contributed to increased NPT with associated high costs in N.Azadegan field. This paper will focus on main drilling problems and integrated technique, as well as the experience and lessons learned in implementing the Iran's development project. Specific key tactics discussed include: maximum utilization of Iranian contents, cluster well pad and auto-move rig system, bit selection and modified drillable float& shoes accessories, losses and overflow prevention measures, surface back pressure performed immediately after cement placement in a few time, a clear process for capturing the best practices and lessons learned. An integrated approach was formed to decrease single well duration with less money ahead of schedule which was fixed 120d in Buy-Back contract. On the first 10 wells, average drilling performance was improved 57% and saved millions of U.S dollars with key solutions to overcome drilling challenges.
Title: An Integrated Approach to Improve Drilling Performance and Save Cost in North Azadegan Field
Description:
Abstract Although some wells from other exploration and development projects in onshore Iran have been finished before, there is a big challenge for North Azadegan field to drill 58 wells in less than 3 years, with more than 8 upgraded 2000HP rigs in the marshy area under the economic sanction surrounding according to strict requirements of Buy-Back development contract.
Moreover, operation area with average 2m water depth, about 2000m directional length section accompanied with narrow mud density window, violently fluctuations in rock strength and complete losses during cementing have also contributed to increased NPT with associated high costs in N.
Azadegan field.
This paper will focus on main drilling problems and integrated technique, as well as the experience and lessons learned in implementing the Iran's development project.
Specific key tactics discussed include: maximum utilization of Iranian contents, cluster well pad and auto-move rig system, bit selection and modified drillable float& shoes accessories, losses and overflow prevention measures, surface back pressure performed immediately after cement placement in a few time, a clear process for capturing the best practices and lessons learned.
An integrated approach was formed to decrease single well duration with less money ahead of schedule which was fixed 120d in Buy-Back contract.
On the first 10 wells, average drilling performance was improved 57% and saved millions of U.
S dollars with key solutions to overcome drilling challenges.

Related Results

Planning Drilling Fluid Programs in Southeast Asia
Planning Drilling Fluid Programs in Southeast Asia
Planning the drilling fluids program is one of the most important steps in Planning the drilling fluids program is one of the most important steps in preparation for the drilling o...
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...
Application of Innovative High Temperature Deep Pyrolysis Technology to Treat Drilling Cuttings Harmlessly in Tarim Basim
Application of Innovative High Temperature Deep Pyrolysis Technology to Treat Drilling Cuttings Harmlessly in Tarim Basim
Abstract Due to high temperature, high pressure, and gypsum-salt formations in the Tian Mountain Front Block in Tarim Basin, the stability and rheology of traditiona...
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Abstract Horizontal drilling technology has been the fastest growing segment of the oil and gas industry over the last few years. With the diversity of reservoirs...
The Successful Application of One Run Drilling Technology in Big-Thickness Halite Formation of Ultra-Deep Water
The Successful Application of One Run Drilling Technology in Big-Thickness Halite Formation of Ultra-Deep Water
Abstract The drilling operation in the more than 2000m thickness pre-salt formation with more than 2000m water depth faced great challenges from the beginning in X. ...
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Abstract Horizontal drilling technology has been the fastest growing segment of the oil and gas industry over the last few years. With the diversity of reservoirs...
Data-Driven Optimization of Drilling Parameters
Data-Driven Optimization of Drilling Parameters
Abstract A major challenge during drilling is to identify sub-formation change, enabling near-real-time adjustment of the drilling parameters to enhance performance....
Optimization of Deepwater Template Drilling
Optimization of Deepwater Template Drilling
ABSTRACT This paper describes the methods and technologies employed during the drilling of the Jolliet Development wells. The Jolliet development wells were drill...

Back to Top