Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Review of BP's Global Gas Injection Projects

View through CrossRef
Abstract Miscible gas flooding is an established method for enhancing oil recovery that can be successfully deployed in secondary or tertiary mode. BP has developed a range of innovative techniques to maximize economic oil recovery from its miscible gas floods. While some of these gas floods have been applied early in field life, in other cases gas flooding has significantly extended the life of mature, water-flooded fields. The results have been reported in a series of publications over the past three decades. The purpose of this paper is to provide an overview of BP's experience of establishing, managing and optimizing miscible gas floods. Prudhoe Bay (Alaska) is the world's largest rich hydrocarbon miscible gas project. Conventional and unconventional methods have been applied in a variety of different settings in secondary and tertiary mode. An extensive surveillance program has facilitated a good understanding of the processes operating at field scale and routine surveillance data are used to optimize the flood. In 2002, a large-scale gas cap water injection project was implemented to slow the decline in field pressure. This project has enhanced the efficiency of the various recovery processes operating across the field, resulting in additional recovery. As a result of the success in Prudhoe, miscible gas flooding has been extended to numerous other fields on the North Slope of Alaska. BP has two active miscible gas projects in the North Sea, Magnus and Ula. In both cases, gas injection began after extensive water flooding. Tertiary miscible water-alternating-gas (WAG) flooding in Magnus field started in 2002 after construction of a gas pipeline from fields located west of the Shetlands and its impact on reservoir performance is significant and well understood. Tertiary miscible WAG injection in Ula field started in 1998 and has played a key role in arresting production decline. In both fields, the miscible gas flood is currently being expanded. In addition to these miscible gas projects, BP jointly operates a CO2 injection project in Algeria and, with its heritage companies, has a long history of operating CO2 floods in the US. BP is actively pursuing new opportunities for gas flooding around the world. Miscible gas injection has generated considerable benefits for BP over the past three decades and will continue to do so. The potential availability of large sources of CO2 in the future, supplied by carbon capture, could help maintain a leading role for miscible gas injection for years to come.
Title: Review of BP's Global Gas Injection Projects
Description:
Abstract Miscible gas flooding is an established method for enhancing oil recovery that can be successfully deployed in secondary or tertiary mode.
BP has developed a range of innovative techniques to maximize economic oil recovery from its miscible gas floods.
While some of these gas floods have been applied early in field life, in other cases gas flooding has significantly extended the life of mature, water-flooded fields.
The results have been reported in a series of publications over the past three decades.
The purpose of this paper is to provide an overview of BP's experience of establishing, managing and optimizing miscible gas floods.
Prudhoe Bay (Alaska) is the world's largest rich hydrocarbon miscible gas project.
Conventional and unconventional methods have been applied in a variety of different settings in secondary and tertiary mode.
An extensive surveillance program has facilitated a good understanding of the processes operating at field scale and routine surveillance data are used to optimize the flood.
In 2002, a large-scale gas cap water injection project was implemented to slow the decline in field pressure.
This project has enhanced the efficiency of the various recovery processes operating across the field, resulting in additional recovery.
As a result of the success in Prudhoe, miscible gas flooding has been extended to numerous other fields on the North Slope of Alaska.
BP has two active miscible gas projects in the North Sea, Magnus and Ula.
In both cases, gas injection began after extensive water flooding.
Tertiary miscible water-alternating-gas (WAG) flooding in Magnus field started in 2002 after construction of a gas pipeline from fields located west of the Shetlands and its impact on reservoir performance is significant and well understood.
Tertiary miscible WAG injection in Ula field started in 1998 and has played a key role in arresting production decline.
In both fields, the miscible gas flood is currently being expanded.
In addition to these miscible gas projects, BP jointly operates a CO2 injection project in Algeria and, with its heritage companies, has a long history of operating CO2 floods in the US.
BP is actively pursuing new opportunities for gas flooding around the world.
Miscible gas injection has generated considerable benefits for BP over the past three decades and will continue to do so.
The potential availability of large sources of CO2 in the future, supplied by carbon capture, could help maintain a leading role for miscible gas injection for years to come.

Related Results

Overview of Key Zonal Water Injection Technologies in China
Overview of Key Zonal Water Injection Technologies in China
Abstract Separated layer water injection is the important technology to realize the oilfield long-term high and stable yield. Through continuous researches and te...
Usan Field: Managing Gas Injection at Mechanical Seal Capacity
Usan Field: Managing Gas Injection at Mechanical Seal Capacity
Abstract Usan is a highly-compartmentalized deepwater field offshore Nigeria with both structural and stratigraphic barriers across and within the compartments. The ...
Managing Gas-Constrained Facility: Converting Oil Producer into Gas Injection Well
Managing Gas-Constrained Facility: Converting Oil Producer into Gas Injection Well
Abstract In accordance with Banyu Urip reservoir simulation for production outlook, produced gas is increasing over time causing the facility to become gas-constrain...
Optimal Injection Parameters for Enhancing Coalbed Methane Recovery: A Simulation Study from the Shizhuang Block, Qinshui Basin, China
Optimal Injection Parameters for Enhancing Coalbed Methane Recovery: A Simulation Study from the Shizhuang Block, Qinshui Basin, China
The injection of N2 into coal reservoir has great potential in improving recovery of coalbed methane (CBM). In this study, a numerical model was established based on the GEM compon...
Efficient Operations In A Mature Oil And Gas Producing Area
Efficient Operations In A Mature Oil And Gas Producing Area
Abstract Exxon's operations in South Texas are keyed heavily on the production of gas reserves which are sold in a major intrastate industrial market. Maintaining...
Manager Of Supply Planning And Projects
Manager Of Supply Planning And Projects
Abstract The Southern California Gas Company is responsible for providing gas service to 12 million southern Californians. SoCal Gas, like other major gas distrib...
A Laboratory Study Of Natural Gas Huff 'N' Puff
A Laboratory Study Of Natural Gas Huff 'N' Puff
Abstract This paper examines the feasibility of cyclic natural gas injection for the enhanced recovery of light oil from waterflooded fields. Approximately 40 per...
Evaluating the Science to Inform the Physical Activity Guidelines for Americans Midcourse Report
Evaluating the Science to Inform the Physical Activity Guidelines for Americans Midcourse Report
Abstract The Physical Activity Guidelines for Americans (Guidelines) advises older adults to be as active as possible. Yet, despite the well documented benefits of physical a...

Back to Top