Rencana Teknis dan Biaya Reklamasi Periode Kedua Tambang Batuan Andesit

View through CrossRef
Abstract. The andesite rocks in this study come from the PT. Sofa Nugraha mine located in Parung Panjang District, Bogor Regency, West Java Province. The purpose of this research is to plan a good technical implementation of reclamation, determine the stages of reclamation activities at the research location, and calculate the direct and indirect costs required for the reclamation activity plan. The technical reclamation plan at the research location begins with land reclamation activities such as recontouring over an area of 5.452 hectares (10-year mining block) using a Kobelco D-85 E-55 Bulldozer, followed by road access construction using a Hino FM-260 200 Dump Truck with a road width of 5 meters, a maximum wheel load of 0.9 tons, and a material volume of 1,800 BCM. Next, a water channel is constructed using a Komatsu PC-200 Excavator with a channel length of 88.6 meters. The final stage of reclamation at the research location involves revegetation, including land preparation with a spacing of 5 meters by 4 meters. Pioneer plants are then planted, with fast-growing species such as sengon, gamelina, and acacia. The process concludes with the planting of cover crops including cassava, paddy, peanuts, corn, and sweet potatoes, followed by plant maintenance until the age of 1 year. The total budget required is Rp. 1,494,300,000, consisting of direct costs amounting to Rp. 534,055,000 and indirect costs amounting to Rp. 960,245,000. Abstrak. Batuan andesit pada penelitian ini berasal dari tambang PT. Sofa Nugraha yang berlokasi di Kecamatan Parung Panjang, Kabupaten Bogor, Provinsi Jawa Barat. Tujuan penelitian ini adalah untuk merencanakan pelaksanaan teknis reklamasi yang baik, menentukan tahapan kegiatan reklamasi di lokasi penelitian, serta menghitung biaya langsung dan tidak langsung yang dibutuhkan untuk rencana kegiatan reklamasi. Rencana teknis reklamasi di lokasi penelitian dimulai dengan kegiatan penataan lahan reklamasi berupa recontouring dengan luas area sebesar 5,452 hektar (blok penambangan tahun ke-10) menggunakan Bulldozer tipe Kobelco D-85 E-55, dilanjutkan dengan pembuatan akses jalan menggunakan Dump Truck Hino FM-260 200 dengan lebar jalan angkut 5 meter, beban roda maksimum 0,9 ton, dan volume material 1.800 BCM. Kemudian, dilakukan pembuatan saluran air menggunakan Excavator Komatsu tipe PC-200 dengan panjang saluran 88,6 meter. Tahap akhir kegiatan reklamasi di lokasi penelitian adalah revegetasi yang meliputi penyiapan lahan tanam dengan jarak tanam 5 meter x 4 meter. Selanjutnya, dilakukan penanaman tanaman pionir dengan komposisi tanaman yang cepat tumbuh seperti sengon, gamelina, dan akasia. Proses ini diakhiri dengan penanaman tanaman penutup seperti ubi kayu, padi sawah, kacang tanah, jagung, dan ubi jalar, serta pemeliharaan tanaman hingga usia 1 tahun. Adapun total anggaran biaya yang harus dikeluarkan adalah sebesar Rp. 1.494.300.000, terdiri dari biaya langsung sebesar Rp. 534.055.000 dan biaya tidak langsung sebesar Rp. 960.245.000.
Title: Rencana Teknis dan Biaya Reklamasi Periode Kedua Tambang Batuan Andesit
Description:
Abstract.
The andesite rocks in this study come from the PT.
Sofa Nugraha mine located in Parung Panjang District, Bogor Regency, West Java Province.
The purpose of this research is to plan a good technical implementation of reclamation, determine the stages of reclamation activities at the research location, and calculate the direct and indirect costs required for the reclamation activity plan.
The technical reclamation plan at the research location begins with land reclamation activities such as recontouring over an area of 5.
452 hectares (10-year mining block) using a Kobelco D-85 E-55 Bulldozer, followed by road access construction using a Hino FM-260 200 Dump Truck with a road width of 5 meters, a maximum wheel load of 0.
9 tons, and a material volume of 1,800 BCM.
Next, a water channel is constructed using a Komatsu PC-200 Excavator with a channel length of 88.
6 meters.
The final stage of reclamation at the research location involves revegetation, including land preparation with a spacing of 5 meters by 4 meters.
Pioneer plants are then planted, with fast-growing species such as sengon, gamelina, and acacia.
The process concludes with the planting of cover crops including cassava, paddy, peanuts, corn, and sweet potatoes, followed by plant maintenance until the age of 1 year.
The total budget required is Rp.
1,494,300,000, consisting of direct costs amounting to Rp.
534,055,000 and indirect costs amounting to Rp.
960,245,000.
Abstrak.
Batuan andesit pada penelitian ini berasal dari tambang PT.
Sofa Nugraha yang berlokasi di Kecamatan Parung Panjang, Kabupaten Bogor, Provinsi Jawa Barat.
Tujuan penelitian ini adalah untuk merencanakan pelaksanaan teknis reklamasi yang baik, menentukan tahapan kegiatan reklamasi di lokasi penelitian, serta menghitung biaya langsung dan tidak langsung yang dibutuhkan untuk rencana kegiatan reklamasi.
Rencana teknis reklamasi di lokasi penelitian dimulai dengan kegiatan penataan lahan reklamasi berupa recontouring dengan luas area sebesar 5,452 hektar (blok penambangan tahun ke-10) menggunakan Bulldozer tipe Kobelco D-85 E-55, dilanjutkan dengan pembuatan akses jalan menggunakan Dump Truck Hino FM-260 200 dengan lebar jalan angkut 5 meter, beban roda maksimum 0,9 ton, dan volume material 1.
800 BCM.
Kemudian, dilakukan pembuatan saluran air menggunakan Excavator Komatsu tipe PC-200 dengan panjang saluran 88,6 meter.
Tahap akhir kegiatan reklamasi di lokasi penelitian adalah revegetasi yang meliputi penyiapan lahan tanam dengan jarak tanam 5 meter x 4 meter.
Selanjutnya, dilakukan penanaman tanaman pionir dengan komposisi tanaman yang cepat tumbuh seperti sengon, gamelina, dan akasia.
Proses ini diakhiri dengan penanaman tanaman penutup seperti ubi kayu, padi sawah, kacang tanah, jagung, dan ubi jalar, serta pemeliharaan tanaman hingga usia 1 tahun.
Adapun total anggaran biaya yang harus dikeluarkan adalah sebesar Rp.
1.
494.
300.
000, terdiri dari biaya langsung sebesar Rp.
534.
055.
000 dan biaya tidak langsung sebesar Rp.
960.
245.
000.

Related Results

Evaluasi Rencana Biaya Reklamasi Dan Revegetasi Di Pt. Internasional Prima Coal
Evaluasi Rencana Biaya Reklamasi Dan Revegetasi Di Pt. Internasional Prima Coal
Berdasarkan Kepmen ESDM No. 1827 K/30/MEM/2018 setiap pemegang IUP Operasi Produksi wajib menyampaikan dokumen rencana reklamasi dan jaminan reklamasi sebelum memulai kegiatan oper...
Rencana Teknis dan Biaya Reklamasi Tambang Timah Blok Sangau B.3 PT XYZ
Rencana Teknis dan Biaya Reklamasi Tambang Timah Blok Sangau B.3 PT XYZ
Abstract. In addition to providing benefits, marine mining activities can have a negative impact on the marine environment, causing various changes to the marine environment. One o...
Rencana Teknis dan Ekonomis Reklamasi Tambang di PT. X Baleendah
Rencana Teknis dan Ekonomis Reklamasi Tambang di PT. X Baleendah
Abstract. Mining activities are closely related to environmental changes. Mining activities can also have an impact on the social and economic sphere of the local area. So mining c...
Rencana Teknis dan Ekonomis Reklamasi PT Tonia Mitra Sejahtera Site Lengora Pantai
Rencana Teknis dan Ekonomis Reklamasi PT Tonia Mitra Sejahtera Site Lengora Pantai
Abstract. Environmental impacts that can occur such as decreased soil productivity, soil compaction, the possibility of erosion, unstable soil movement, disruption of flora and fau...
Desain Teknis Pemanfaatan Lahan Bekas Tambang PT. Gunung Kulalet
Desain Teknis Pemanfaatan Lahan Bekas Tambang PT. Gunung Kulalet
Abstrak. Pemanfaatan lahan bekas tambang menjadi isu krusial dalam upaya pelestarian lingkungan serta peningkatan nilai ekonomi kawasan pasca-tambang. Penelitian ini bertujuan untu...

Back to Top