Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Windshield Damage Analysis on ATR 42/72-600 Aircraft at PT. DEF

View through CrossRef
Windshield damage on ATR 42/72-600 aircraft at PT. DEF has caused operational disruptions, including flight delays, increased maintenance costs, and potential safety risks. Repeated damage to the Windshield is caused by various factors, namely inspection and maintenance errors, improper installation procedures, damage to the heating system or pressure distribution, glass material degradation, and exposure to extreme weather and UV rays. In this study, the analysis was carried out using a quantitative method with a fishbone diagram to identify the main causes of damage and appropriate mitigation steps. The results of the analysis showed that the main factors contributing to the damage were errors in inspection, installation errors, and material degradation. After implementing mitigation steps such as improving technician training, revising maintenance procedures, and improving material selection, there was a significant decrease in the frequency of Windshield damage. An indication of the success of these mitigation steps can be seen from the repairs carried out during January to June 2024 which succeeded in reducing damage and rejects on the Windshield by 40% compared to 2023, improving the quality of maintenance, inspection and material durability. In terms of maintenance costs for spare parts, there is a decrease in spending on purchasing spare windshields, namely USD 15,375 (PPG Inc.) x 10 units = USD 153,750 in 2023 to USD 21,915 (Saint Gobain) x 3 units = USD 65,745 in 2024 (June), which is 42% until mid-2024. This step increases operational reliability, cost efficiency, flight safety, and employee productivity, customer satisfaction also increases along with reduced flight delays and cancellations due to technical problems. Overall, the study succeeded in reducing Windshield damage and increasing the company's operational efficiency and reliability
Title: Windshield Damage Analysis on ATR 42/72-600 Aircraft at PT. DEF
Description:
Windshield damage on ATR 42/72-600 aircraft at PT.
DEF has caused operational disruptions, including flight delays, increased maintenance costs, and potential safety risks.
Repeated damage to the Windshield is caused by various factors, namely inspection and maintenance errors, improper installation procedures, damage to the heating system or pressure distribution, glass material degradation, and exposure to extreme weather and UV rays.
In this study, the analysis was carried out using a quantitative method with a fishbone diagram to identify the main causes of damage and appropriate mitigation steps.
The results of the analysis showed that the main factors contributing to the damage were errors in inspection, installation errors, and material degradation.
After implementing mitigation steps such as improving technician training, revising maintenance procedures, and improving material selection, there was a significant decrease in the frequency of Windshield damage.
An indication of the success of these mitigation steps can be seen from the repairs carried out during January to June 2024 which succeeded in reducing damage and rejects on the Windshield by 40% compared to 2023, improving the quality of maintenance, inspection and material durability.
In terms of maintenance costs for spare parts, there is a decrease in spending on purchasing spare windshields, namely USD 15,375 (PPG Inc.
) x 10 units = USD 153,750 in 2023 to USD 21,915 (Saint Gobain) x 3 units = USD 65,745 in 2024 (June), which is 42% until mid-2024.
This step increases operational reliability, cost efficiency, flight safety, and employee productivity, customer satisfaction also increases along with reduced flight delays and cancellations due to technical problems.
Overall, the study succeeded in reducing Windshield damage and increasing the company's operational efficiency and reliability.

Related Results

Bondu-so vowel harmony: A descriptive analysis with theoretical implications
Bondu-so vowel harmony: A descriptive analysis with theoretical implications
This paper provides a descriptive analysis of the [ATR] vowel harmony system of Bondu-so (Dogon, Mali), a previously undocumented language. Data come from fieldwork and have not ye...
Technical Note: Film‐based measurement of gold nanoparticle dose enhancement for 192Ir
Technical Note: Film‐based measurement of gold nanoparticle dose enhancement for 192Ir
PurposeThe purpose of this work is to introduce a simple yet accurate technique to measure the dose enhancement factor (DEF) of a citrate‐capped gold nanoparticle (GNP) solution us...
Forest Structure and Potential of Carbon Storage at Khao Nam Sab, Kasetsart University, Sri Racha Campus, Chonburi Province
Forest Structure and Potential of Carbon Storage at Khao Nam Sab, Kasetsart University, Sri Racha Campus, Chonburi Province
Background and Objectives: Tropical Forest ecosystems are globally significant for their roles in biodiversity conservation, climate regulation, and carbon sequestration. In Thaila...
Improving the Effectiveness of Adolescent Idiopathic Scoliosis (AIS) Screening
Improving the Effectiveness of Adolescent Idiopathic Scoliosis (AIS) Screening
Study design. Diagnostic accuracy study. Objective. To evaluate the diagnostic performance of a combined screening method ...
Regulation of ATM and ATR by Smarcal1 and BRG1
Regulation of ATM and ATR by Smarcal1 and BRG1
ABSTRACTThe G2/M checkpoint is activated on DNA damage by the ATM and ATR kinases that are regulated by post-translational modifications. In this paper, the transcriptional co-regu...
Closed-loop identification for aircraft flutter model parameters
Closed-loop identification for aircraft flutter model parameters
Purpose The purpose of this paper is to extend the authors’ previous contributions on aircraft flutter model parameters identification. Because closed-loop condition is more widely...
Methodical applicability of playing on the def [tambourine] in the music education
Methodical applicability of playing on the def [tambourine] in the music education
Until the 1970s, women in the Novi Pazar region partied separately from men. On that occasion, in accordance with the customs of this environment, they could only be cheered by wom...

Back to Top