Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Coiled Tubing Cementing Operation Using MPD Technique in a HP/HT Well

View through CrossRef
Abstract In the continual search for Oil and Gas, more and more exploration wells are being drilled in High Pressure-High Temperature (HPHT) environments. Pore and Fracture pressure prediction and understanding the true drilling window in HPHT exploration wells poses significant challenges. Once the pressure profile is ascertained, then the next challenge is to drill and cement the well within those limits to avoid kicks, losses and maintain the integrity of the well. There are special challenges in cementing HPHT wells. These wells typically have a narrow drilling window which could make it very difficult to manage the bottom hole pressure correctly while cementing the open hole section. In any stage of cementing in this type of wells, hydrostatic, dynamic and circulating effects should be considered. These tight windows in HPHT wells, combined with the effect of temperature and pressure on mud density possess significant risks for cementing operation. Also physical and chemical behavior of cement changes in high pressure and temperature. This paper details the advantages of applying advanced Managed Pressure Drilling (MPD) technology during coiled tubing cementing operations in a case study HPHT well. This advanced technique not only allows for maintaining a Constant Bottom Hole Pressure (CBHP) but also reduces the additional costs associated with cement weight and additives. Furthermore, real time flow monitoring eliminates the down hole fluid losses which in conjunction with CBHP reduce formation damage. A precise managed pressure coiled tubing cementing program was analyzed and planned inclusive of operational procedures and risks management. The well was displaced to a lighter drilling fluid through coiled tubing, while keeping bottom hole pressure (BHP) constant slightly over the formation pressure by applying surface back pressure (SBP). Four different densities of cement slurries were pumped in the hole through coiled tubing and held bottom hole pressure constant during the entire cementing operation within 30 kg/m3 (0.25 ppg) pore pressure and fracture pressure window. Held annular pressure constant with the help of SBP during the eight hours of cement setting time to ensure that hydrostatic pressure would remain in place. This document demonstrates the successful application of managed pressure coiled tubing cementing operation. It also elaborates the recommended operational procedures, integrated MPD and Coiled tubing equipment setup, along with real-time graphs and data from the case study well.
Title: Coiled Tubing Cementing Operation Using MPD Technique in a HP/HT Well
Description:
Abstract In the continual search for Oil and Gas, more and more exploration wells are being drilled in High Pressure-High Temperature (HPHT) environments.
Pore and Fracture pressure prediction and understanding the true drilling window in HPHT exploration wells poses significant challenges.
Once the pressure profile is ascertained, then the next challenge is to drill and cement the well within those limits to avoid kicks, losses and maintain the integrity of the well.
There are special challenges in cementing HPHT wells.
These wells typically have a narrow drilling window which could make it very difficult to manage the bottom hole pressure correctly while cementing the open hole section.
In any stage of cementing in this type of wells, hydrostatic, dynamic and circulating effects should be considered.
These tight windows in HPHT wells, combined with the effect of temperature and pressure on mud density possess significant risks for cementing operation.
Also physical and chemical behavior of cement changes in high pressure and temperature.
This paper details the advantages of applying advanced Managed Pressure Drilling (MPD) technology during coiled tubing cementing operations in a case study HPHT well.
This advanced technique not only allows for maintaining a Constant Bottom Hole Pressure (CBHP) but also reduces the additional costs associated with cement weight and additives.
Furthermore, real time flow monitoring eliminates the down hole fluid losses which in conjunction with CBHP reduce formation damage.
A precise managed pressure coiled tubing cementing program was analyzed and planned inclusive of operational procedures and risks management.
The well was displaced to a lighter drilling fluid through coiled tubing, while keeping bottom hole pressure (BHP) constant slightly over the formation pressure by applying surface back pressure (SBP).
Four different densities of cement slurries were pumped in the hole through coiled tubing and held bottom hole pressure constant during the entire cementing operation within 30 kg/m3 (0.
25 ppg) pore pressure and fracture pressure window.
Held annular pressure constant with the help of SBP during the eight hours of cement setting time to ensure that hydrostatic pressure would remain in place.
This document demonstrates the successful application of managed pressure coiled tubing cementing operation.
It also elaborates the recommended operational procedures, integrated MPD and Coiled tubing equipment setup, along with real-time graphs and data from the case study well.

Related Results

Prebending Coiled Tubing and Its Fatigue Life Prediction
Prebending Coiled Tubing and Its Fatigue Life Prediction
Coiled tubing is widely used in oil drilling and production operations. However, extreme high stress variation of coiled tubing during the processes of pulling out, rolling in the ...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract OBJECTIVE / SCOPE An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Coiled Tubing Working Life Prediction
Coiled Tubing Working Life Prediction
ABSTRACT Failure of coiled tubing, due to the repeated bending and plastic deformation of coiled tubing on and off the reel and gooseneck, is of great concern in coi...
Full Offline Well Cementing Implementation Resulting in Significant Time Savings and Improvement in Operational Efficiency
Full Offline Well Cementing Implementation Resulting in Significant Time Savings and Improvement in Operational Efficiency
Abstract The current global low oil price environment has driven many operators to consider having a quicker and more efficient operations and reduction of the well ...
Coiled Tubing for SlimHole Cementing and Completing
Coiled Tubing for SlimHole Cementing and Completing
Abstract Current trends in the oil and gas industry are focusing more heavily on operational efficiency and cost reduction than ever before. Therefore, operators and...
A Deep Dive on Stage Cementing Operations in Sub-Saharan Africa: A Case Study
A Deep Dive on Stage Cementing Operations in Sub-Saharan Africa: A Case Study
Abstract Cementing through weak sand and unconsolidated formations are a common occurrence in today's drilling operations. Main challenges include well control, poor...
Performance Experiment of Ultra high Temperature Cementing Slurry System
Performance Experiment of Ultra high Temperature Cementing Slurry System
Abstract The continuous development of oil and gas exploration and development to deep and ultra deep wells in China, the formation temperature is also getting higher and h...
Collaborative Approach Overcomes Cementing Challenges in Narrow Pressure Window Environment
Collaborative Approach Overcomes Cementing Challenges in Narrow Pressure Window Environment
Abstract The collaborative approach used for cementing the production liner in an onshore development well in Russia is presented. The reservoir has a narrow window ...

Back to Top