Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Collaborative Approach Overcomes Cementing Challenges in Narrow Pressure Window Environment

View through CrossRef
Abstract The collaborative approach used for cementing the production liner in an onshore development well in Russia is presented. The reservoir has a narrow window between pore and fracture pressures, which has previously caused formation instability and severe lost circulation issues during well construction, compromising zonal isolation objectives. Total loss of fluids experienced while cementing the 114.3 mm production liner in the first appraisal well in the field led to revising the cementing strategy. Collaboration among various parts of the drilling department and the opportunity to define a new approach resulted in a decision to introduce managed pressure drilling (MPD) to address the challenges associated with a narrow pressure window and uncertainty in pore pressure while drilling and cementing. This enabled implementing the optimal mud weight and adjusting equivalent circulating density (ECD) during cementing with minimum overbalance. Reducing the mud weight from 1.20 SG to 1.05 SG eliminated losses after running the liner and while cementing it. As a result, pre-job circulation rates and pumping rates during cementing could be increased, improving mud removal efficiency and achieving top of cement at the required depth. The constant-bottomhole-pressure mode of MPD was used to maintain the same ECD during displacement of the well to a lighter fluid and during cementing, avoiding well influx during pumpoff events by compensating for the annular friction pressure loss with surface backpressure. This first onshore managed pressure cementing operation executed within the same field in Russia (later named as field A) was completed flawlessly, with no safety or quality issues, zero nonproductive time, and achievement of the required zonal isolation across the challenging production section. The collaborative approach used was a novel strategy, with the mud weight program strategically adjusted before and during the cementing operation to achieve zonal isolation objectives.
Title: Collaborative Approach Overcomes Cementing Challenges in Narrow Pressure Window Environment
Description:
Abstract The collaborative approach used for cementing the production liner in an onshore development well in Russia is presented.
The reservoir has a narrow window between pore and fracture pressures, which has previously caused formation instability and severe lost circulation issues during well construction, compromising zonal isolation objectives.
Total loss of fluids experienced while cementing the 114.
3 mm production liner in the first appraisal well in the field led to revising the cementing strategy.
Collaboration among various parts of the drilling department and the opportunity to define a new approach resulted in a decision to introduce managed pressure drilling (MPD) to address the challenges associated with a narrow pressure window and uncertainty in pore pressure while drilling and cementing.
This enabled implementing the optimal mud weight and adjusting equivalent circulating density (ECD) during cementing with minimum overbalance.
Reducing the mud weight from 1.
20 SG to 1.
05 SG eliminated losses after running the liner and while cementing it.
As a result, pre-job circulation rates and pumping rates during cementing could be increased, improving mud removal efficiency and achieving top of cement at the required depth.
The constant-bottomhole-pressure mode of MPD was used to maintain the same ECD during displacement of the well to a lighter fluid and during cementing, avoiding well influx during pumpoff events by compensating for the annular friction pressure loss with surface backpressure.
This first onshore managed pressure cementing operation executed within the same field in Russia (later named as field A) was completed flawlessly, with no safety or quality issues, zero nonproductive time, and achievement of the required zonal isolation across the challenging production section.
The collaborative approach used was a novel strategy, with the mud weight program strategically adjusted before and during the cementing operation to achieve zonal isolation objectives.

Related Results

Microorganisms for Secondary Cementation: A Promising Solution for Cracks and Microchannels in Oil Well Bore Casings
Microorganisms for Secondary Cementation: A Promising Solution for Cracks and Microchannels in Oil Well Bore Casings
Abstract Secondary cementing plays a crucial role in oil and gas well operations by providing zonal isolation and ensuring the integrity of wellbore structures. Seco...
A Deep Dive on Stage Cementing Operations in Sub-Saharan Africa: A Case Study
A Deep Dive on Stage Cementing Operations in Sub-Saharan Africa: A Case Study
Abstract Cementing through weak sand and unconsolidated formations are a common occurrence in today's drilling operations. Main challenges include well control, poor...
Coiled Tubing Cementing Operation Using MPD Technique in a HP/HT Well
Coiled Tubing Cementing Operation Using MPD Technique in a HP/HT Well
Abstract In the continual search for Oil and Gas, more and more exploration wells are being drilled in High Pressure-High Temperature (HPHT) environments. Pore and F...
Addressing Operational Complexities: Successful Zonal Isolation in Deep Production Liners Through Innovative Cementing
Addressing Operational Complexities: Successful Zonal Isolation in Deep Production Liners Through Innovative Cementing
Abstract This paper explores the complexities involved in achieving zonal isolation within deep production liners with a narrow operational window (pore-fracture pre...
Full Offline Well Cementing Implementation Resulting in Significant Time Savings and Improvement in Operational Efficiency
Full Offline Well Cementing Implementation Resulting in Significant Time Savings and Improvement in Operational Efficiency
Abstract The current global low oil price environment has driven many operators to consider having a quicker and more efficient operations and reduction of the well ...
Performance Experiment of Ultra high Temperature Cementing Slurry System
Performance Experiment of Ultra high Temperature Cementing Slurry System
Abstract The continuous development of oil and gas exploration and development to deep and ultra deep wells in China, the formation temperature is also getting higher and h...
Innovative and Unconventional Approach to Cementing A Ballooning Well Leading to Good Zonal Isolation
Innovative and Unconventional Approach to Cementing A Ballooning Well Leading to Good Zonal Isolation
Abstract Good cement bond log and sufficient zonal isolation are important aspects of production wells. Proper cement design and displacement are essential to ensure...
Experimental Investigation on Cementing Integrity of Oil/Gas Wells 
Experimental Investigation on Cementing Integrity of Oil/Gas Wells 
The integrity of cementing in oil and gas wells is vital for ensuring wellbore stability and preventing environmental contamination. However, the extreme conditions encountered dur...

Back to Top