Javascript must be enabled to continue!
Assessment of competitive tendering methods of procuring educational building projects in Nigeria
View through CrossRef
PurposeThe purpose of this paper is to assess educational building projects with a view to determining the level of utilization of competitive tendering methods, factors influencing their choice and predisposition to risk factors, in order to ensure effective construction project delivery.Design/methodology/approachThe paper assessed the level of utilization of competitive tendering methods, the factors influencing their choice and finally the predisposition of each of the methods to risk factors, adopting survey method which involved primary data, obtained by using multiple‐choice questionnaire administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, mechanical and electrical engineers).FindingsIt was found that the usage of open competitive tendering methods outweighed selective tendering method of procurement as a result of accountability and price competition involved, which made it predisposed to not only financial risk factors, but also political and logistics factors.Research limitations/implicationsMultiple‐choice questionnaire administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, mechanical and electrical engineers) was limited to selected institutions in the southwestern zone of Nigeria.Practical implicationsThe most widely adopted method (open competitive tendering method) suffers from risk factors such as selective but high premium being placed on financial and logistic risk factors in order to achieve hitch‐free construction project delivery. These measures will help the stakeholders in assessing degrees of project complexity and better manage the potential risks that might be induced to different levels of competitive tendering methods of project procurement in relation to educational building projects.Originality/valueThis empirical investigation provides strong evidence on the procurement of educational building projects in response to due process policy. The findings provided insightful perspectives to define and understand project complexity. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.
Title: Assessment of competitive tendering methods of procuring educational building projects in Nigeria
Description:
PurposeThe purpose of this paper is to assess educational building projects with a view to determining the level of utilization of competitive tendering methods, factors influencing their choice and predisposition to risk factors, in order to ensure effective construction project delivery.
Design/methodology/approachThe paper assessed the level of utilization of competitive tendering methods, the factors influencing their choice and finally the predisposition of each of the methods to risk factors, adopting survey method which involved primary data, obtained by using multiple‐choice questionnaire administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, mechanical and electrical engineers).
FindingsIt was found that the usage of open competitive tendering methods outweighed selective tendering method of procurement as a result of accountability and price competition involved, which made it predisposed to not only financial risk factors, but also political and logistics factors.
Research limitations/implicationsMultiple‐choice questionnaire administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, mechanical and electrical engineers) was limited to selected institutions in the southwestern zone of Nigeria.
Practical implicationsThe most widely adopted method (open competitive tendering method) suffers from risk factors such as selective but high premium being placed on financial and logistic risk factors in order to achieve hitch‐free construction project delivery.
These measures will help the stakeholders in assessing degrees of project complexity and better manage the potential risks that might be induced to different levels of competitive tendering methods of project procurement in relation to educational building projects.
Originality/valueThis empirical investigation provides strong evidence on the procurement of educational building projects in response to due process policy.
The findings provided insightful perspectives to define and understand project complexity.
For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.
Related Results
Assessment of Factors Affecting Contractors Tendering Success for Construction Projects in North-Central Nigeria
Assessment of Factors Affecting Contractors Tendering Success for Construction Projects in North-Central Nigeria
The challenge of construction tendering process is a common theme in developing countries especially Nigeria. Tendering process is often tedious, multitasking and complex. Contract...
The Readiness of the Malaysian Construction Industry for E-tendering After COVID-19 Pandemic
The Readiness of the Malaysian Construction Industry for E-tendering After COVID-19 Pandemic
E-tendering implementation can bring significant benefits such as cost savings, transparency in contract and maximize the efficiency and resources to the construction industry. E-t...
Acquiring Technology Through Tendering- Challenges
Acquiring Technology Through Tendering- Challenges
ABSTRACT
In a technology intensive industry like ours – Petroleum Industry, Technology is acquired for commercial benefits, technical enhancement, environment protec...
De gevel – een intermediair element tussen buiten en binnen
De gevel – een intermediair element tussen buiten en binnen
This study is based on the fact that all people have a basic need for protection from other people (and animals) as well as from the elements (the exterior climate). People need a ...
The System Determinants of the Formation of Competitive Advantages in Educational Organizations
The System Determinants of the Formation of Competitive Advantages in Educational Organizations
The article considers the issues of substantiation of educational organizations’ competitive advantage formation in the context of identifying systemic determinants that define the...
BlockTender: A Trustworthy System
BlockTender: A Trustworthy System
The tendering process is a critical component in the procurement practices of governments and companies worldwide. However, this process often encounters challenges that undermine ...
Performative Microforests
Performative Microforests
The design of office buildings can substantially improve the building, social, and ecological performance of office building projects. However, existing research on improving the p...
Der skal ikke lades sten på sten tilbage
Der skal ikke lades sten på sten tilbage
The Building by the Barbar TempleClose by the large temple at Barbar 1) lies a little tell, which was investigated in the spring of 1956. The tell was shown to cover a building of ...

