Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Lift Installation of a Subsea Oil Storage Tank: A 60,000mT Pendulum

View through CrossRef
In August 2014 Heerema Marine Contractors (HMC) have successfully installed the Solan Subsea Oil Storage Tank (SOST), using its Semi-Submersible Crane Vessel (SSCV) Thialf. The SOST installation is regarded as unique due to its dimensions, complex hydrodynamics and the utilization of nearly the full crane capacity. The Solan SOST is a Subsea Oil Storage Tank with a future storage capacity of 48,000 m3 of oil. The SOST has a dimension of 45m × 45m × 25m, a dry weight of 9,500mT and a total submerged mass of 60,000mT including ballast water. It was installed offshore west of the Shetland Islands at a depth of 135m. Prior to installation the SOST was wet-towed to the field. At location the SOST was installed by a dual crane lift sequence, lowering the SOST from 2m freeboard to the seabed. The lowering sequence is characterized by the usage of a compressible air pocket to reduce hookloads during the most critical stage of the installation, the lowering of the SOST through the splash zone. Prior to the installation ballast and dynamic lift models were generated to understand both the hydrostatics and hydrodynamics of the SOST - SSCV Thialf system throughout the installation. Numerical simulations of the flooding operation were performed to predict all relevant parameters for various scenarios. The lift dynamics were analysed with frequency domain models. Most resonance modes between SSCV Thialf and SOST were found not to be excited due to the differences in natural periods of the hydrodynamic systems and the occurring wave periods. During installation vital parameters such as ballast volume, compartment fill rates, differential pressure and hookloads were continuously monitored with dedicated measurement systems. The values were compared with the results from the engineering models. As some of the parameters were directly related to each other, the values could be back-calculated and cross-checked, thereby increasing the reliability of the measurements. Both the understanding of the principle hydrostatics and hydrodynamics of the system as well as the close monitoring of all vital parameters have resulted in a safe and controlled installation of the Solan SOST by the SSCV Thialf; the installation of a 60,000mT dual crane pendulum. This paper describes the hydromechanic engineering work performed by HMC and the SOST offshore installation.
Title: Lift Installation of a Subsea Oil Storage Tank: A 60,000mT Pendulum
Description:
In August 2014 Heerema Marine Contractors (HMC) have successfully installed the Solan Subsea Oil Storage Tank (SOST), using its Semi-Submersible Crane Vessel (SSCV) Thialf.
The SOST installation is regarded as unique due to its dimensions, complex hydrodynamics and the utilization of nearly the full crane capacity.
The Solan SOST is a Subsea Oil Storage Tank with a future storage capacity of 48,000 m3 of oil.
The SOST has a dimension of 45m × 45m × 25m, a dry weight of 9,500mT and a total submerged mass of 60,000mT including ballast water.
It was installed offshore west of the Shetland Islands at a depth of 135m.
Prior to installation the SOST was wet-towed to the field.
At location the SOST was installed by a dual crane lift sequence, lowering the SOST from 2m freeboard to the seabed.
The lowering sequence is characterized by the usage of a compressible air pocket to reduce hookloads during the most critical stage of the installation, the lowering of the SOST through the splash zone.
Prior to the installation ballast and dynamic lift models were generated to understand both the hydrostatics and hydrodynamics of the SOST - SSCV Thialf system throughout the installation.
Numerical simulations of the flooding operation were performed to predict all relevant parameters for various scenarios.
The lift dynamics were analysed with frequency domain models.
Most resonance modes between SSCV Thialf and SOST were found not to be excited due to the differences in natural periods of the hydrodynamic systems and the occurring wave periods.
During installation vital parameters such as ballast volume, compartment fill rates, differential pressure and hookloads were continuously monitored with dedicated measurement systems.
The values were compared with the results from the engineering models.
As some of the parameters were directly related to each other, the values could be back-calculated and cross-checked, thereby increasing the reliability of the measurements.
Both the understanding of the principle hydrostatics and hydrodynamics of the system as well as the close monitoring of all vital parameters have resulted in a safe and controlled installation of the Solan SOST by the SSCV Thialf; the installation of a 60,000mT dual crane pendulum.
This paper describes the hydromechanic engineering work performed by HMC and the SOST offshore installation.

Related Results

Fundamental study on rope vibration suppression by middle transfer floor using risk information
Fundamental study on rope vibration suppression by middle transfer floor using risk information
Lifts are essential for means of vertical transportation. Recently, the lifts installed in the high-rise buildings are long travel, thus the lift ropes are becoming longer. The nat...
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Optimal control for hover pendulum motion of unmanned helicopter
Optimal control for hover pendulum motion of unmanned helicopter
Purpose During the authors’ practical experiments about designing hover controller for unmanned helicopter, they find pendulum motion exists, thus destroying their expected control...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED]Keanu Reeves CBD Gummies ==❱❱ Huge Discounts:[HURRY UP ] Absolute Keanu Reeves CBD Gummies (Available)Order Online Only!! ❰❰= https://www.facebook.com/Keanu-Reeves-CBD-G...
Subsea Facilities
Subsea Facilities
Abstract This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities. The field is located in a r...
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
ABSTRACT This paper describes the subsea network which interconnects the three subsea templates at EAST FRIGG field, and connects this field to the FRIGG field, 1...
Pig Lift: A New Artificial Lift Method
Pig Lift: A New Artificial Lift Method
Abstract Artificial lift of oil wells is a fairly broad subject. There are many different methods available but in a few cases none of them turns out to be a fit ...

Back to Top