Challenging Design Confronted in a Deepwater/HPHT PiP Tie-Back Flowline System
View through CrossRef
A challenging problem that pipeline industry has to face in deepwater is the high energy reservoir with high pressure and high temperature. For piping, flowline, and riser, High Pressure (HP) leads to much thicker pipe wall that increases manufacturing and installation cost. High Temperature (HT) has even wider impact on design since the flowline system has to operate over a greater temperature range between non-producing situations such as installation and shut down, and the maximum production flow.
Subsea tie-back to the existing floating production facility, generally named as Brown Field Development, has many engineering and financial advantages. It becomes more popular in the Gulf of Mexico (GoM), North Sea, and West African due to the economical benefits. This paper presents some of the design challenges of a deepwater subsea tie-back project, which is composed of an 8″ by 12″ pipe-in-pipe (PiP) flowline loop from three (3) subsea fields to a semi-submersible platform located in the GoM at a water depth of 2,000m (∼6,600ft). Some of key efforts are worth to mention:
• Mitigation of thermal expansion and global buckling as facing very soft clay soil;
• Transition tie-in of PiP to structure piping - a valiant strength design to meet the deepwater installation loading;
• PiP inner pipe lock-in compressive load - effect of flowline (non-bonded) section length variation and locked-in stress;
• Tight installation target box for the separately installed structure mudmat and upper module.
This paper presents the solutions that Project team has generated to address these design/installation challenges. Lessons learned from the designs and installations are also presented. Advanced analysis tool — FEA are utilized through the entire design stage, from global 3-D flowline modeling to local component strength design.
American Society of Mechanical Engineers
Title: Challenging Design Confronted in a Deepwater/HPHT PiP Tie-Back Flowline System
Description:
A challenging problem that pipeline industry has to face in deepwater is the high energy reservoir with high pressure and high temperature.
For piping, flowline, and riser, High Pressure (HP) leads to much thicker pipe wall that increases manufacturing and installation cost.
High Temperature (HT) has even wider impact on design since the flowline system has to operate over a greater temperature range between non-producing situations such as installation and shut down, and the maximum production flow.
Subsea tie-back to the existing floating production facility, generally named as Brown Field Development, has many engineering and financial advantages.
It becomes more popular in the Gulf of Mexico (GoM), North Sea, and West African due to the economical benefits.
This paper presents some of the design challenges of a deepwater subsea tie-back project, which is composed of an 8″ by 12″ pipe-in-pipe (PiP) flowline loop from three (3) subsea fields to a semi-submersible platform located in the GoM at a water depth of 2,000m (∼6,600ft).
Some of key efforts are worth to mention:
• Mitigation of thermal expansion and global buckling as facing very soft clay soil;
• Transition tie-in of PiP to structure piping - a valiant strength design to meet the deepwater installation loading;
• PiP inner pipe lock-in compressive load - effect of flowline (non-bonded) section length variation and locked-in stress;
• Tight installation target box for the separately installed structure mudmat and upper module.
This paper presents the solutions that Project team has generated to address these design/installation challenges.
Lessons learned from the designs and installations are also presented.
Advanced analysis tool — FEA are utilized through the entire design stage, from global 3-D flowline modeling to local component strength design.
Related Results
Combined Effect of Flowline Walking and Riser Dynamic Loads on HP/HT Flowline Design
Combined Effect of Flowline Walking and Riser Dynamic Loads on HP/HT Flowline Design
Abstract
Some high pressure, high temperature (HPHT) flowlines have experienced a gradual, overall axial displacement over a number of heating/cooling cycles. Thi...
The Newly Published BSEE Guidance Documents for the Approval of HPHT Equipment, Wells, and Projects in the Gulf of Mexico
The Newly Published BSEE Guidance Documents for the Approval of HPHT Equipment, Wells, and Projects in the Gulf of Mexico
Abstract
The Bureau of Safety and Environmental Enforcement (BSEE) first published High Pressure/High Temperature (HPHT) regulations at 30 CFR 250.807 in 2010. Addit...
Effects of PIP targeting LOX-1 eluting stents on in-stent restenosis and re-endothelialisation in rat abdominal aorta stenting models
Effects of PIP targeting LOX-1 eluting stents on in-stent restenosis and re-endothelialisation in rat abdominal aorta stenting models
Background and Objectives
Pyrrole-Imidazole polyamide (PIP) is a novel gene silencer that can be readily designed and synthesised to target any gene. Contrary to ...
Wax-On, Wax-Off: Understanding and Mitigating Wax Deposition in a Deepwater Subsea Gas/Condensate Flowline
Wax-On, Wax-Off: Understanding and Mitigating Wax Deposition in a Deepwater Subsea Gas/Condensate Flowline
Abstract
The subsea Coulomb field is a two-well gas/condensate development in 7500 fsw, tied back to the NaKika platform in the Gulf of Mexico via a single 27-mil...
Design Of Insulated Flowlines For Mobile Bay
Design Of Insulated Flowlines For Mobile Bay
ABSTRACT
Insulated CRA flowlines are used in Mobile Bay for connecting well templates to host processing platforms. This paper describes the design of the flowlin...
Challenges and strategies in high-pressure high-temperature equipment maintenance
Challenges and strategies in high-pressure high-temperature equipment maintenance
High-pressure high-temperature (HPHT) equipment plays a critical role in the oil and gas industry, particularly in challenging environments such as deep-water drilling and reservoi...
General Practitioners’ Perspectives and Barriers to Deprescribing Inappropriate Medications in Primary Care
General Practitioners’ Perspectives and Barriers to Deprescribing Inappropriate Medications in Primary Care
Introduction and objective: Potentially inappropriate prescribing (PIP) is associated with adverse drug reactions and negative outcomes in older adults. The objective of the study ...
Modeling the Effects of a Deepwater Leak on Behavior of a Multiphase Production Flowline
Modeling the Effects of a Deepwater Leak on Behavior of a Multiphase Production Flowline
Abstract
Identification of a leaking flowline represents a special challenge for the many deepwater developments planned in the U.S. Gulf of Mexico (GOM) and around ...