Objective/Scope
When operating an Electric Submersible Pump (ESP) in a location with high installation or worker costs, the installation can cost much more than the ESP itself. Having a reliable ESP with good average run life is critical to the operational economics. In sweet or benign reservoirs, ESP run life can easily exceed five (5) years through careful design, selection, manufacture, installation and operational practices. When taking an ESP system with a proven track record into sour environments, the average run life deteriorates significantly and correlates with the partial pressure of the H2S in the produced fluid. This proven track record is important to bear in mind because an ESP system that has inherent reliability issues will fail of its own accord long before the effects of H2S become obvious which makes failure analysis challenging. In a region with both sweet and sour fields coupled with high intervention costs, it is vital that ESP run life is reliable and predictable in any field. Years of dismantle inspection failure analysis (DIFA) on all ESPs has allowed identification of modes of failure attributed to H2S, prioritized those issues and led to the development of a high integrity ESP system to combat the modes of failure allowing ESPs in sour fields to improve run life to be on par with those in sweet fields. This paper will describe the specific problems H2S causes an ESP and what was done to resolve them.
Methods, Procedures, Process
H2S will cause significant damage to an ESP system that may eventually cause a failure. If the H2S partial pressure is low, the damage may not reduce the run life significantly or at least lower it enough to cause significant inconvenience and high operational cost. If an ESP can run five (5) to seven (7) years, on average, without failure, this would be more than adequate in most cases. While having an ESP that never fails might seem to be a worthy goal, it isn't really practical. Changing reservoir conditions or production strategies with time will make it necessary to pull and replace an ESP at some point. While a variable speed drive (VSD) does expand the useful window of operation of an ESP, it only helps up to a point. Fortunately H2S does not appear to significantly impact the ESP run life performance. To date, corrosion resistant coating (CRC) on carbon steel has been effective as long as the coating is intact. If CRC is to be applied to a housing, it is necessary that the coating be applied as soon after bead or shot blasting as possible. Even a few extra minutes of delay will allow an oxide layer to form on the newly cleaned housing surface making it impossible for the coating to adhere to it. H2S attacks the ESP cable, seal section and motor in specific ways. For this paper, the ESP completion discussed has a deep set, non-vented packer located approximately 200 feet above the pump discharge used to prolong the life of the production casing. Based on empirical data, the most significant reduction of run life is failure of the MLE system which includes the packer penetrator lower connector, the MLE pothead and the MLE lead jacketed cable itself in that order of importance. While some penetrator manufacturers perform better than others, nobody has yet designed an H2S proof system. Whether the penetrator is factory molded or field attachable, H2S will eventually cause it to fail. Without going into the specifics of one design over another, probably the most important factor impacting the reliability of the penetrator connector is the length of the leakage path from the sour production fluid to the copper of the cable and connectors. The longer the distance, the longer the useful life of the connector.
Title: Harsh Environment ESP System
Description:
Objective/Scope
When operating an Electric Submersible Pump (ESP) in a location with high installation or worker costs, the installation can cost much more than the ESP itself.
Having a reliable ESP with good average run life is critical to the operational economics.
In sweet or benign reservoirs, ESP run life can easily exceed five (5) years through careful design, selection, manufacture, installation and operational practices.
When taking an ESP system with a proven track record into sour environments, the average run life deteriorates significantly and correlates with the partial pressure of the H2S in the produced fluid.
This proven track record is important to bear in mind because an ESP system that has inherent reliability issues will fail of its own accord long before the effects of H2S become obvious which makes failure analysis challenging.
In a region with both sweet and sour fields coupled with high intervention costs, it is vital that ESP run life is reliable and predictable in any field.
Years of dismantle inspection failure analysis (DIFA) on all ESPs has allowed identification of modes of failure attributed to H2S, prioritized those issues and led to the development of a high integrity ESP system to combat the modes of failure allowing ESPs in sour fields to improve run life to be on par with those in sweet fields.
This paper will describe the specific problems H2S causes an ESP and what was done to resolve them.
Methods, Procedures, Process
H2S will cause significant damage to an ESP system that may eventually cause a failure.
If the H2S partial pressure is low, the damage may not reduce the run life significantly or at least lower it enough to cause significant inconvenience and high operational cost.
If an ESP can run five (5) to seven (7) years, on average, without failure, this would be more than adequate in most cases.
While having an ESP that never fails might seem to be a worthy goal, it isn't really practical.
Changing reservoir conditions or production strategies with time will make it necessary to pull and replace an ESP at some point.
While a variable speed drive (VSD) does expand the useful window of operation of an ESP, it only helps up to a point.
Fortunately H2S does not appear to significantly impact the ESP run life performance.
To date, corrosion resistant coating (CRC) on carbon steel has been effective as long as the coating is intact.
If CRC is to be applied to a housing, it is necessary that the coating be applied as soon after bead or shot blasting as possible.
Even a few extra minutes of delay will allow an oxide layer to form on the newly cleaned housing surface making it impossible for the coating to adhere to it.
H2S attacks the ESP cable, seal section and motor in specific ways.
For this paper, the ESP completion discussed has a deep set, non-vented packer located approximately 200 feet above the pump discharge used to prolong the life of the production casing.
Based on empirical data, the most significant reduction of run life is failure of the MLE system which includes the packer penetrator lower connector, the MLE pothead and the MLE lead jacketed cable itself in that order of importance.
While some penetrator manufacturers perform better than others, nobody has yet designed an H2S proof system.
Whether the penetrator is factory molded or field attachable, H2S will eventually cause it to fail.
Without going into the specifics of one design over another, probably the most important factor impacting the reliability of the penetrator connector is the length of the leakage path from the sour production fluid to the copper of the cable and connectors.
The longer the distance, the longer the useful life of the connector.
Related Results
Utilizing Chelating Agent System Fluid to Remove Scale Buildup from Stuck ESP Shaft in Offshore Saudi Arabia
Utilizing Chelating Agent System Fluid to Remove Scale Buildup from Stuck ESP Shaft in Offshore Saudi Arabia
Abstract
Saudi Aramco’s first offshore field produced by electrical submersible pumps (ESPs) has completed a nine year operating cycle, sustaining the field producti...
Mechanistic Modeling of Electrical Submersible Pump ESP Boosting Pressure Under Gassy Flow Conditions and Experimental Validation
Mechanistic Modeling of Electrical Submersible Pump ESP Boosting Pressure Under Gassy Flow Conditions and Experimental Validation
Abstract
As an artificial lift method for high-flow-rate oil production, electrical submersible pumps’ (ESP) performance surfers from gas entrainment, a frequently e...
High Rate ESP Application in Onshore Rajasthan Fields: A Case Study
High Rate ESP Application in Onshore Rajasthan Fields: A Case Study
Abstract
This paper describes the selection, design, successful application and performance monitoring of Electrical Submersible Pumps (ESP) in the giant Mangala oil...
Wireline Retrievable ESP Deployment: Observation, Challenges and Intervention
Wireline Retrievable ESP Deployment: Observation, Challenges and Intervention
Abstract
The Offshore Field X Project comprises of greenfield scope to expand the Waterflood scheme towards delivering the peak production levels similar to those ac...
Predictive Data Analytics for Effective Electric Submersible Pump Management
Predictive Data Analytics for Effective Electric Submersible Pump Management
Abstract
Electrical Submersible Pump (ESP) failures cause disruptions that lead to production deferement besides the cost of interventions/workovers post failure. Th...
Action Research in English for Specific Purposes: English Language for the Medical Students in Bangladesh
Action Research in English for Specific Purposes: English Language for the Medical Students in Bangladesh
English for Specific Purposes (ESP) has flourished to meet the growing demand of the academic and professional learners. Since the tertiary level of education is the concern, ESP ...
The Quest for The Ultrareliable ESP
The Quest for The Ultrareliable ESP
Abstract
ESP failures have important economic implications for O&G operators, including: nonproductive time, production deferral, production losses, and high cos...
ESP Optimization Goes Further: Operating Frequency Beyond 60 Hz
ESP Optimization Goes Further: Operating Frequency Beyond 60 Hz
Optimization in brown field developments is always challenging in terms of cost. One of it is XY Field, Rimau Block, South Sumatera with more than 70% of artificial lift is Electri...