Utilizing Chelating Agent System Fluid to Remove Scale Buildup from Stuck ESP Shaft in Offshore Saudi Arabia
View through CrossRef
Abstract
Saudi Aramco’s first offshore field produced by electrical submersible pumps (ESPs) has completed a nine year operating cycle, sustaining the field production rate with an acceptable ESP run life in most cases. Recently, a well in this field has experienced a stuck pump shaft shortly after installation. In the past, similar failures in the same well had led to ESP replacement through workover operations. To avoid the same outcome, an effort was initiated to regain operation of the ESP stuck shaft, and realize the production target without a workover.
After the first failure, a scaling tendency analysis exhibited this well to have tendency for carbonate scaling. The Dismantle Inspection and Failure Analysis (DIFA) and laboratory testing of samples taken from the pump stages confirmed the presence of predominantly calcium carbonate scale. The impellers and diffusers of the ESP pump were discovered to be totally blocked with solid precipitation, which had been the cause of frequent pump trips and decreasing production rate. Using parts from the third failed ESP, a chelating-agent-based treatment fluid was designed to dissolve the scale buildup in the stuck ESP shaft without adversely affecting the tubular and downhole equipment. After the treatment, to avoid the reoccurrence of pump failure, scaling indices and thermodynamics of the scale precipitation tendency of the formation water associated with its crude stream were studied. Results indicated that scale inhibitors, such as polyacrylic acid (PAA) or polyphosphinocarboxylic acid (PPCA), bullheaded into the formation may be used to control scale in this well in the future.
With a stuck pump shaft, this well would normally have been worked over to replace the ESP, thereby consuming 10 days of rig time and sustaining potentially avoidable production losses. The goal of the project was to remove the scale accumulation, regain operation of the stuck ESP shaft, and reestablish the production of 5 MBOD. Consequently, a costly workover was avoided and the life of the ESP was increased without compromising the completion. The successful treatment for this stuck ESP shaft, which was carried out by bullheading the treatment fluid is a reference treatment design for similar cases. The history of the well, laboratory studies, and recommendations to avoid scale precipitation in the future are detailed.
Title: Utilizing Chelating Agent System Fluid to Remove Scale Buildup from Stuck ESP Shaft in Offshore Saudi Arabia
Description:
Abstract
Saudi Aramco’s first offshore field produced by electrical submersible pumps (ESPs) has completed a nine year operating cycle, sustaining the field production rate with an acceptable ESP run life in most cases.
Recently, a well in this field has experienced a stuck pump shaft shortly after installation.
In the past, similar failures in the same well had led to ESP replacement through workover operations.
To avoid the same outcome, an effort was initiated to regain operation of the ESP stuck shaft, and realize the production target without a workover.
After the first failure, a scaling tendency analysis exhibited this well to have tendency for carbonate scaling.
The Dismantle Inspection and Failure Analysis (DIFA) and laboratory testing of samples taken from the pump stages confirmed the presence of predominantly calcium carbonate scale.
The impellers and diffusers of the ESP pump were discovered to be totally blocked with solid precipitation, which had been the cause of frequent pump trips and decreasing production rate.
Using parts from the third failed ESP, a chelating-agent-based treatment fluid was designed to dissolve the scale buildup in the stuck ESP shaft without adversely affecting the tubular and downhole equipment.
After the treatment, to avoid the reoccurrence of pump failure, scaling indices and thermodynamics of the scale precipitation tendency of the formation water associated with its crude stream were studied.
Results indicated that scale inhibitors, such as polyacrylic acid (PAA) or polyphosphinocarboxylic acid (PPCA), bullheaded into the formation may be used to control scale in this well in the future.
With a stuck pump shaft, this well would normally have been worked over to replace the ESP, thereby consuming 10 days of rig time and sustaining potentially avoidable production losses.
The goal of the project was to remove the scale accumulation, regain operation of the stuck ESP shaft, and reestablish the production of 5 MBOD.
Consequently, a costly workover was avoided and the life of the ESP was increased without compromising the completion.
The successful treatment for this stuck ESP shaft, which was carried out by bullheading the treatment fluid is a reference treatment design for similar cases.
The history of the well, laboratory studies, and recommendations to avoid scale precipitation in the future are detailed.
Related Results
Harsh Environment ESP System
Harsh Environment ESP System
Objective/Scope
When operating an Electric Submersible Pump (ESP) in a location with high installation or worker costs, the installation can cost much more than t...
High Rate Slim ESP Viability Assessment in the Field
High Rate Slim ESP Viability Assessment in the Field
Abstract
Producing oil at full potential with an electrical submersible pump (ESP) in a slim well remains a challenge in the petroleum industry. A conventional slim ...
Effect of Normalizing on Semi Float Axle Shaft Performance - Case Study
Effect of Normalizing on Semi Float Axle Shaft Performance - Case Study
The primary function of axle shaft in semi float rear axle is to transmit the power to wheels. These shafts would experience the torsional load along with bending load as well. Hen...
Improving ESP LifeTime Performance Evaluation by Deploying an ESP Tracking and Inventory Management System
Improving ESP LifeTime Performance Evaluation by Deploying an ESP Tracking and Inventory Management System
Abstract
One of the most popular and efficient artificial lift mechanisms is the electrical submersible pump (ESP). According to recent statistics, there are more th...
Electric Submersible Pump Reliability Improvement Lean Six Sigma (LSS) Study
Electric Submersible Pump Reliability Improvement Lean Six Sigma (LSS) Study
Abstract
Electric Submersible Pumping (ESP) is a common artificial lift method when technically viable for high flow rate application. ESP reliability, on the other ...
Advanced ESP and Completion Solution for a Remarkable Run Life in an Offshore-High Corrosive Environment
Advanced ESP and Completion Solution for a Remarkable Run Life in an Offshore-High Corrosive Environment
Abstract
Severe corrosive conditions in a deep offshore reservoir located in the Mediterranean Sea have had a detrimental impact on the run life of the electrical su...
Perkembangan Islam Arab Saudi
Perkembangan Islam Arab Saudi
The kingdom of al-Sa'ūdiyah actually existed since 1446. However, as a strong dynasty and established the Saudi Arabia state is since the era of Abd. Aziz ibn Abd. Rahman al-Sa'ud ...
Defining the Optimum Properties of Chelating Agents to be used as EOR Fluid for Sandstone Reservoirs
Defining the Optimum Properties of Chelating Agents to be used as EOR Fluid for Sandstone Reservoirs
AbstractMany laboratory core flood investigations proved the increase in the oil recovery by applying low salinity water. However, till now the main mechanism of the oil recovery i...