Optimization of Hydropower Generation potential of Arjo Dedessa Dam

View through CrossRef
Abstract Hydropower has been developed to have a positive impact on the quality of life for rural residents in many ways. It offers a wide range of facilities, such as improved lighting, energy for small industries, schools, computer and communication service centers, and clinics. Ethiopia has constructed numerous dams for irrigation and water supply, yet these structures may have untapped potential for other purposes. One example of such a dam is the Arjo Dedessa Irrigation Dam located in western Ethiopia. Advanced optimization models have been developed to maximize the annual energy generation from the Arjo Dedessa Dam, while taking into account restrictions on water release for irrigation and ecological purposes, as well as the need to maintain maximum reservoir yield and storage capacity. The model was analyzed using LINGO software for different probabilities of mean annual inflow exceedance. Two scenarios for hydropower retrofitting were evaluated. The scenario of independent hydropower release with reservoir inflows at 50%, 75%, and 90% probabilities of exceedance results in a total annual hydropower output of 4.8 MW, 4.34 MW, and 0.99 MW, respectively. The matching values for the scenario of complementary hydropower release were 5.27 MW, 4.55 MW, and 1 MW, respectively. The study also measured the potential increase in the reservoir's live storage capacity to 1945.01 Mm3 by utilizing flood storage, which would allow for a maximum draft increase to 285.74 Mm3. With an upper limit on storage and draft, and reservoir inflows with probabilities of exceedance at 50%, 75%, and 90%, the hydropower production increased correspondingly to 6.51 MW, 4.54 MW, and 1.935 MW for the scenario of independent hydropower release arrangement. For the scenario of complimentary hydropower release, the hydropower production improved to 6.75 MW, 4.58 MW, and 1.94 MW respectively. The outcomes specify that the Arjo Dedessa Dam is appropriate for the production of hydroelectric power and that its generation potential is between 6.51 and 6.75 MW.
Research Square Platform LLC
Title: Optimization of Hydropower Generation potential of Arjo Dedessa Dam
Description:
Abstract Hydropower has been developed to have a positive impact on the quality of life for rural residents in many ways.
It offers a wide range of facilities, such as improved lighting, energy for small industries, schools, computer and communication service centers, and clinics.
Ethiopia has constructed numerous dams for irrigation and water supply, yet these structures may have untapped potential for other purposes.
One example of such a dam is the Arjo Dedessa Irrigation Dam located in western Ethiopia.
Advanced optimization models have been developed to maximize the annual energy generation from the Arjo Dedessa Dam, while taking into account restrictions on water release for irrigation and ecological purposes, as well as the need to maintain maximum reservoir yield and storage capacity.
The model was analyzed using LINGO software for different probabilities of mean annual inflow exceedance.
Two scenarios for hydropower retrofitting were evaluated.
The scenario of independent hydropower release with reservoir inflows at 50%, 75%, and 90% probabilities of exceedance results in a total annual hydropower output of 4.
8 MW, 4.
34 MW, and 0.
99 MW, respectively.
The matching values for the scenario of complementary hydropower release were 5.
27 MW, 4.
55 MW, and 1 MW, respectively.
The study also measured the potential increase in the reservoir's live storage capacity to 1945.
01 Mm3 by utilizing flood storage, which would allow for a maximum draft increase to 285.
74 Mm3.
With an upper limit on storage and draft, and reservoir inflows with probabilities of exceedance at 50%, 75%, and 90%, the hydropower production increased correspondingly to 6.
51 MW, 4.
54 MW, and 1.
935 MW for the scenario of independent hydropower release arrangement.
For the scenario of complimentary hydropower release, the hydropower production improved to 6.
75 MW, 4.
58 MW, and 1.
94 MW respectively.
The outcomes specify that the Arjo Dedessa Dam is appropriate for the production of hydroelectric power and that its generation potential is between 6.
51 and 6.
75 MW.

Related Results

Hydropower Dams, Environment and Politics
Hydropower Dams, Environment and Politics
Renewable energy sources are vital to fulfill the high demands of energy in the present world. The common renewable energy sources are wind, hydropower, nuclear and biomass. Howeve...
Modal Analysis of Chushandian Gravity Dam
Modal Analysis of Chushandian Gravity Dam
This article uses the finite element software ABAQUS to establish a three-dimensional finite element model based on the overflow dam section 12 # ~15 # and surface outlet dam secti...
Hydroelectric Power Plants and Their Sustainability
Hydroelectric Power Plants and Their Sustainability
Hydropower is the oldest source of renewable mechanical power and largest source of renewable electricity globally accounting for close to 17% of global electricity generation alth...
Pumped Storage Hydropower for Sustainable and Low-Carbon Electricity Grids in Pacific Rim Economies
Pumped Storage Hydropower for Sustainable and Low-Carbon Electricity Grids in Pacific Rim Economies
Because generating electricity significantly contributes to global greenhouse gas emissions, meeting the 2015 Paris Agreement and 2021 Glasgow Climate Pact requires rapidly transit...
Hydropower from the Alpine Cryosphere in the Era of Climate Change: The Case of the Sabbione Storage Plant in Italy
Hydropower from the Alpine Cryosphere in the Era of Climate Change: The Case of the Sabbione Storage Plant in Italy
Greenhouse gas reduction policies will have to rely as much as possible upon renewable, clean energy sources. Hydropower is a very good candidate, since it is the only renewable en...
Study on the earth and rock-filled dam settlement monitoring in multi-SAR interferometry
Study on the earth and rock-filled dam settlement monitoring in multi-SAR interferometry
In China, there are nearly 100,000 earth and rock-filled dams, which are essential water conservancy facilities for agricultural irrigation, food security, flood controlling, and p...
EVALUATE STRESSES GENERATED IN EARTHEN DAMS USING GEO-STUDIO
EVALUATE STRESSES GENERATED IN EARTHEN DAMS USING GEO-STUDIO
Water leakage through the earth dam and the foundation is an important phenomenon that must be considered when designing earth dams, as it generates pore water pressure and causes ...

Back to Top