In China, there are nearly 100,000 earth and rock-filled dams, which are essential water conservancy facilities for agricultural irrigation, food security, flood controlling, and power generation and so on. The periodically deformation monitoring for those dams are the key criterion to evaluate their safety. However, traditional surveying technologies such as levelling, total station and GNSS and some inner sensors (like fibers) for continuous real-time monitoring are costly and require large amounts of human resources.In this paper, we evaluate the ability of the currently operating X-band and C-band SAR sensors on dam deformation monitoring and propose a conversion parameter to retrieve the dam consolidation settlement. According to the earth and rock-filled dam post-construction settlement mechanism, a dam settles due to the compaction effect of filling earth in the dam. While in SAR geometry, only the line-of-sight projection of the slope surface deformation is visible along the radar beam. In order to convert the deformation from SAR geometry to real 3D geometry, we proposed a method for converting the dam post-construction deformation from SAR light of sight to vertical direction, based on the geometrical parameters of the dam and the SAR sensor.The experiments by both simulated and real cases in the Gongming reservoir of Shenzhen city in china are utilized to compare the deformation monitoring capability of various SAR sensors with different resolutions and to demonstrate the applicability of deformation conversion method. The simulation results show that the foreshortening of the slope greatly affects the slope deformation retrieval, for the small earth-rock filled dams with axis being parallel to the SAR heading direction, the conversion parameter between two slopes of dam maybe differ than 2~3 times. The real experiments, by both the differential interferogram and time series analysis, based on TSX, CSK and Sentinel-1 data in Shenzhen Gongming reservoir show that the high-resolution data have more precise results. The time series analysis of multi-SAR data from 2017 to 2021 are used to show full processing of the dam post-construction settlement. For the small dam which is nearly 30 meters high and 200 meters long, With the 1~3 meters resolution of TSX and CSK data, we can retrieve the dam  settlement from both the cross-section profile and the axis section profile. The Sentinel TOPS data sets with low resolution cannot fully retrieve the dam settlement and the results are underestimated.
Title: Study on the earth and rock-filled dam settlement monitoring in multi-SAR interferometry
Description:
In China, there are nearly 100,000 earth and rock-filled dams, which are essential water conservancy facilities for agricultural irrigation, food security, flood controlling, and power generation and so on.
The periodically deformation monitoring for those dams are the key criterion to evaluate their safety.
However, traditional surveying technologies such as levelling, total station and GNSS and some inner sensors (like fibers) for continuous real-time monitoring are costly and require large amounts of human resources.
In this paper, we evaluate the ability of the currently operating X-band and C-band SAR sensors on dam deformation monitoring and propose a conversion parameter to retrieve the dam consolidation settlement.
According to the earth and rock-filled dam post-construction settlement mechanism, a dam settles due to the compaction effect of filling earth in the dam.
While in SAR geometry, only the line-of-sight projection of the slope surface deformation is visible along the radar beam.
In order to convert the deformation from SAR geometry to real 3D geometry, we proposed a method for converting the dam post-construction deformation from SAR light of sight to vertical direction, based on the geometrical parameters of the dam and the SAR sensor.
The experiments by both simulated and real cases in the Gongming reservoir of Shenzhen city in china are utilized to compare the deformation monitoring capability of various SAR sensors with different resolutions and to demonstrate the applicability of deformation conversion method.
The simulation results show that the foreshortening of the slope greatly affects the slope deformation retrieval, for the small earth-rock filled dams with axis being parallel to the SAR heading direction, the conversion parameter between two slopes of dam maybe differ than 2~3 times.
The real experiments, by both the differential interferogram and time series analysis, based on TSX, CSK and Sentinel-1 data in Shenzhen Gongming reservoir show that the high-resolution data have more precise results.
The time series analysis of multi-SAR data from 2017 to 2021 are used to show full processing of the dam post-construction settlement.
For the small dam which is nearly 30 meters high and 200 meters long, With the 1~3 meters resolution of TSX and CSK data, we can retrieve the dam  settlement from both the cross-section profile and the axis section profile.
The Sentinel TOPS data sets with low resolution cannot fully retrieve the dam settlement and the results are underestimated.
Related Results
Marine applications of SAR polarimetry
Marine applications of SAR polarimetry
Els oceans mantenen una fràgil i complexa cadena que enllaça un alt nombre de factors biològics, sociològics i econòmics. Actualment, aquest ecosistema està amenaçat per l'activita...
Deformation measurement and monitoring with Ground-Based SAR
Deformation measurement and monitoring with Ground-Based SAR
The Ground-Based Synthetic Aperture Radar (GB-SAR) is a relatively new technique,
which in the last ten years has gained interest as deformation measurement and
m...
Studies on cyclic peptides. IV. Conformation of cyclo(Sar‐Sar‐Gly)2, cyclo(Sar)6 and cyclo(Sar‐Gly‐Gly)2 and their conformational change induced by alkali thiocyanates
Studies on cyclic peptides. IV. Conformation of cyclo(Sar‐Sar‐Gly)2, cyclo(Sar)6 and cyclo(Sar‐Gly‐Gly)2 and their conformational change induced by alkali thiocyanates
AbstractConformation of cyclo (Sar‐Sar‐Gly)2, cyclo(Sar)6, and cyclo(Sar‐Gly‐Gly)2 was investigated by nmr spectroscopy. cyclo(Sar‐Sar‐Gly)2, were shown to assume various conformat...
Ground moving target indication with synthetic aperture radars for maritime surveillance
Ground moving target indication with synthetic aperture radars for maritime surveillance
The explosive growth of shipping traffic all over the World, with around three quarters of the total trade goods and crude oil transported by sea, has raised newly emerging concern...
Polarimetric differential SAR Interferometry with ground-based sensors
Polarimetric differential SAR Interferometry with ground-based sensors
Las técnicas de Interferometría Diferencial se basan en la combinación de varias imágenes SAR con distinta separación temporal y permiten la recuperación de las componentes lineale...
Study on Deformation Characteristics of Gate Dam and Earth-Rock Dam System on Deep Overburden
Study on Deformation Characteristics of Gate Dam and Earth-Rock Dam System on Deep Overburden
The gate dam and earth-rock dam system offers advantages such as minimal ecological impact and strong terrain adaptability, making them the preferred dam type for low-head, high-fl...
Study on Deformation Characteristics of Gate Dam and Earth–Rock Dam Systems with Deep Overburden
Study on Deformation Characteristics of Gate Dam and Earth–Rock Dam Systems with Deep Overburden
Gate dam and earth–rock dam systems have many advantages, such as minimal ecological impact and good terrain adaptability, making them the preferred dam type for low-head, high-flo...
Theia can arrive late and be oxidized, but not if it is large compared to proto-Earth
Theia can arrive late and be oxidized, but not if it is large compared to proto-Earth
The Moon-forming impact was the most significant event during the accretion of Earth substantially establishing the physical and chemical states of the Earth-Moon system. In the ca...