Javascript must be enabled to continue!
Optimal Thermal Output of an Absorption Heat Pump with Steam Heating Integrated in a PT-60/70-130/13 Steam Turbine
View through CrossRef
The problem of determining the optimal thermal power of the absorption bromide-lithium heat pump (AHP) with steam heating, integrated into the thermal scheme of the PT-60/70-130/13 steam turbine when operating in the mode with a slight opening of the rotary regulating diaphragm, was formulated and solved. The turbine plant released steam to consumers and provided heat according to the schedule of 150 / 70 ºС. The characteristics of AHP were modeled using approximate dependencies based on the characteristics of thermotransformer manufacturers. AHP was heated by steam from the production selection of the turbine after the steam screw machine installed for energy saving. The general optimization problem with the objective function of changing the monthly fuel consumption after the integration of AHP, based on the average monthly outdoor air temperature in the heating season in Ukraine, was divided into 6 auxiliary optimization problems. The control parameters of these problems were: thermal capacity of the AHP, steam pressure in the turbine condenser and at the inlet to the heat pump, steam pressure in the turbine headю These problems were solved by the coordinate descent method. Modes with steam consumption in the production selection of the turbine for the consumers were studied: 15, 30 and 45 t/h (with parameters: 1.296 MPa, 280 ºС) and mains water: 1600, 1650 and 1700 m3/h. Their feature is the provision of "useful" generation in volumes corresponding to the work of PT-60/70-130/13 without AHP with a closed rotary diaphragm. For all considered options of the turbine load, the optimal power of the integrated AHP is defined as 20 MW. During the heating period PT-60/70-130/13 with AHP 20 MW when operating in a mode close to the thermal load with the lower of the studied consumptions of production steam and mains water leads to savings of: fuel by ~3.5%, softened water by 8.5%, technical of water by 79.9%, as well as to a noticeable ecological effect due to the reduction of harmful emissions into the atmosphere. The preliminary payback period of AHP is close to 3 years. It is noted that the option of the integrated turbine with a partially open regulating diaphragm at the accepted prices for fuel and electricity loses in terms of economic indicators to the option with a closed diaphragm.
National Academy of Sciences of Ukraine (Co. LTD Ukrinformnauka) (Publications)
Title: Optimal Thermal Output of an Absorption Heat Pump with Steam Heating Integrated in a PT-60/70-130/13 Steam Turbine
Description:
The problem of determining the optimal thermal power of the absorption bromide-lithium heat pump (AHP) with steam heating, integrated into the thermal scheme of the PT-60/70-130/13 steam turbine when operating in the mode with a slight opening of the rotary regulating diaphragm, was formulated and solved.
The turbine plant released steam to consumers and provided heat according to the schedule of 150 / 70 ºС.
The characteristics of AHP were modeled using approximate dependencies based on the characteristics of thermotransformer manufacturers.
AHP was heated by steam from the production selection of the turbine after the steam screw machine installed for energy saving.
The general optimization problem with the objective function of changing the monthly fuel consumption after the integration of AHP, based on the average monthly outdoor air temperature in the heating season in Ukraine, was divided into 6 auxiliary optimization problems.
The control parameters of these problems were: thermal capacity of the AHP, steam pressure in the turbine condenser and at the inlet to the heat pump, steam pressure in the turbine headю These problems were solved by the coordinate descent method.
Modes with steam consumption in the production selection of the turbine for the consumers were studied: 15, 30 and 45 t/h (with parameters: 1.
296 MPa, 280 ºС) and mains water: 1600, 1650 and 1700 m3/h.
Their feature is the provision of "useful" generation in volumes corresponding to the work of PT-60/70-130/13 without AHP with a closed rotary diaphragm.
For all considered options of the turbine load, the optimal power of the integrated AHP is defined as 20 MW.
During the heating period PT-60/70-130/13 with AHP 20 MW when operating in a mode close to the thermal load with the lower of the studied consumptions of production steam and mains water leads to savings of: fuel by ~3.
5%, softened water by 8.
5%, technical of water by 79.
9%, as well as to a noticeable ecological effect due to the reduction of harmful emissions into the atmosphere.
The preliminary payback period of AHP is close to 3 years.
It is noted that the option of the integrated turbine with a partially open regulating diaphragm at the accepted prices for fuel and electricity loses in terms of economic indicators to the option with a closed diaphragm.
Related Results
Steam-Powered Offshore Oil Producing Platforms
Steam-Powered Offshore Oil Producing Platforms
1. ABSTRACT
This paper will briefly describe the parallel development of an oil production platform topsides with a conventional gas turbine driver system. This w...
Ways of TPP Power Units Modernization During Their Conversion to Ultra-Supercritical Steam Parameters
Ways of TPP Power Units Modernization During Their Conversion to Ultra-Supercritical Steam Parameters
The approach to solving the applied problem of modernization of the 300 MW series power units produced by JSC "Ukrainian Energy Machines" by converting them from supercritical to u...
TINBOP Cyclic Steam Injection Enhances Oil Recovery in Mature Steamfloods
TINBOP Cyclic Steam Injection Enhances Oil Recovery in Mature Steamfloods
Abstract
In a previous paper (SPE/PS-CIM/CHOA 97850), we presented our findings on a novel cyclic steam injection method that we developed. The Top-Injection Bott...
The Hot Test of Primary Separation Equipment of Steam Generator for CAP1400 Nuclear Power Plant
The Hot Test of Primary Separation Equipment of Steam Generator for CAP1400 Nuclear Power Plant
A new type of Steam separator for CAP1400 Steam Generator is introduced. The result of characteristic experiment, the variables of which contain steam load, saturated water flow an...
Steam turbine fault early warning algorithm based on association rules and multivariate state estimation
Steam turbine fault early warning algorithm based on association rules and multivariate state estimation
In order to accurately achieve steam turbine fault warning, a steam turbine fault warning algorithm based on association rules and multivariate state estimation is proposed. Mining...
Thermal energy storage with tunnels in different subsurface conditions
Thermal energy storage with tunnels in different subsurface conditions
The widespread use of the underground and global climate change impact the urban subsurface temperature. Changes in the subsurface environment can affect the performance of undergr...
DESIGN CHARACTERISTICS OF THE HORIZONTAL STEAM GENERATOR PGV-1000
DESIGN CHARACTERISTICS OF THE HORIZONTAL STEAM GENERATOR PGV-1000
The materials of the article consider the design characteristics of horizontal steam generators PGV-1000 for WWER NPPs. The NPP steam generator, in particular the PGV-1000 steam ge...
Steam-CO Recovery Processes For Bottom Water Oil Reservoirs
Steam-CO Recovery Processes For Bottom Water Oil Reservoirs
Abstract
Based on Pujol and Boberg's scaling criteria, a series of experiments on steam-CO2 injection strategies was conducted in a high temperature, high pressur...


